Murchison Minerals CEO Troy Boisjoli joined Steve Darling from Proactive to share details the company has released the second drill result from its summer drill program at the Barre de Fer zone at the HPM Project in Quebec. Boisjoli telling Proactive the results confirmed extensive High-Grade Nickel Sulphide Mineralization with the hole drilled to a depth of 452 metres which intersected two broad zones of Nickel, Copper and Cobalt totalling 175.15 metres of composite thickness with 121.20 metres grading 1.36% NiEq. or 4.07% CuEq. This is now the best drill hole intersection on the project.
Murchison Minerals second drill hole assay at HPM Project returns best intersection on the project