Magna Mining CEO Jason Jessup joined Steve Darling from Proactive to share news that the company has released assay results from 5 drill holes that were completed in the first half of 2022 at the Shakespeare Mine. Jessup told Proactive that these holes came from the Gap Zone, an area located near the West Zone of the Shakespeare deposit. The results have confirmed expansion of the mineralization at the West Zone, and also included a high grade mineralized intersection of 15.5 g/t Pt, 1.46 g/t Pd and 1.31 g/t Au over 0.35m at 284m depth.
Magna Mining announces results from drilling at Shakespeare Mine