Sipa Resources Ltd (ASX:SRI) managing director Pip Darvall shares with Proactive details of a diamond drilling program at the Barbwire Terrace JV Project in Western Australia from which initial findings demonstrate its proof of concept. The first hole was drilled to a final depth of 410 metres and intersected dolomitised Pillara limestone 290 metres below the surface. The second hole was drilled to more than 400 metres deep and intersected the dolomitised limestone roughly 193 metres below the surface.
Sipa Resources demonstrates proof of concept at Barbwire Terrace JV