Coro Energy said production at the Sillaro gas field in Italy has now resumed after changes to the operation.
Significant improvements relating to the moisture in the sales gas have been made, it added, bringing it well within the specifications required by the pipeline operator.
These changes included the gas stripping rate for glycol regeneration, Coro added.
Two other Italian gas fields, Rapagnano and Casa Tiberi, are also now back in production said Coro following the completion of slick line operations with sediment obstructing the flow now removed from the wells.