Constantine Metals CEO Garfield MacVeigh joined Steve Darling from Proactive to share news the company is planning an 18 million dollar budget for the Palmer Project which is located in Southeast Alaska. MacVeigh telling Proactive the company will complete the construction of the final one kilometre of the underground portal access road, finish construction of facilities for an updated Wastewater Design Discharge System, build a 50-60 person camp and finally a surface exploration drilling program planned to test the large South Wall deposit.
MacVeigh also shared with Proactive more about an interesting group of claims the company has picked up in Arizona. The Property includes the past producing underground Yuma copper-gold mine that saw intermittent production between 1940 and 1963 and is reported to have produced 8,728 short tons at a grade of 2.65% copper, 0.03 oz/t gold and 0.62 oz/t silver.