Elementos Ltd (ASX:ELT, OTC:ELTLF)'s Joe David says they've begun an optimisation study at its wholly‐owned Oropesa tin project in Spain to reassess the planned annual mining rate and throughput of the processing plant and supporting infrastructure. The study will confirm the basis of design for the definitive feasibility study, by re‐optimising the company’s May 2020 updated economic study, which already positioned Oropesa as a low-cost, globally significant new tin project.
Elementos talks optimisation study for Oropesa tin project