GTI Resources Ltd (ASX:GTR)'s Bruce Lane and Principal Engineer at BRS Engineering Doug Beahm discuss news GTR's started drilling at the Thor ISR uranium project in Wyoming’s Great Divide basin with two mud rotary drill rigs. The 50,000‐foot maiden drill program of about 100 holes is designed to confirm the grade and tenor of uranium mineralisation that was previously identified by Kerr McGee in the 1980s and to ultimately support the definition of an economic ISR uranium resource.
GTI Resources details drill campaign at Thor uranium project