Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

Gold & silver

Cypress Development begins testing lithium-bearing claystone from Nevada project at its new pilot plant

The new plant is inside a metallurgical facility around 100 miles south of the project and includes four main sections - a leaching area, a tailings handling area, a pregnant leach solution (PLS) treatment area, and a Direct Lithium Extract

Cypress Development Corp (TSX-V:CYP, OTCQB:CYDVF) has marked another development in the advancement of its Clayton Valley lithium asset in Nevada, saying that testing of lithium-bearing claystone from the project had begun at the pilot plant.

The process uses chloride-based leaching combined with the Chemionex—Lionex process for Direct Lithium Extraction (DLE).

"The pilot plant is operating as designed. Leaching is now underway on lithium clay," noted Bill Willoughby, CEO of Cypress, in a statement.

"I would like to thank the team for doing an excellent job in bringing the pilot plant to this point, and we look forward to obtaining the test results from the program."

In October this year, the company reported that it had now finished assembling the key pilot plant for the Clayton Valley lithium project.

READ: Cypress Development welcomes extension to August, 2022 for key water permit in Nevada

The new plant is inside a metallurgical facility around 100 miles south of the project and includes four main sections - a leaching area, a tailings handling area, a pregnant leach solution (PLS) treatment area, and a Direct Lithium Extraction (DLE) process (in this case, the Lionex process) area.

The pilot plant is operated by del Sol Refining Inc and the test program is intended to confirm and optimize the extraction of lithium from Cypress' Project, following the recommendations outlined in the pre-feasibility study.

Operations are under the direction of Continental Metallurgical Services, Llc., with support from del Sol Refining, Inc., and Chemionix Inc.

The wholly-owned Clayton Valley Lithium project is the site of a world-class resource of lithium-bearing claystone adjacent to the Albemarle Silver Peak mine - North America's only lithium brine operation.

A positive pre-feasibility study for the property was announced by the company in August 2020.

Contact the writer at giles@proactiveinvestors.com

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK