Altiplano Metals CEO Alastair McIntyre joined Steve Darling from Proactive with news the company has released 7 holes from their ongoing drilling program at the Farellon copper-gold mine in Chile.
McIntyre telling Proactive the holes were completed for a total depth of 1,857 m and saw grades from 0.63% Cu to 2.54% Cu over a range of widths from 1.70m to 5.50m. The highest observed grade yielded 2.54% Cu over 5.5m. The company has one more hole to report on this batch and an additional 4 holes on the second drill pad to the NE.