District Metals CEO Garrett Ainsworth joined Steve Darling from Proactive to share some details from their Phase II drill program underway at the Tomtebo Property located in Sweden. Ainsworth telling Proactive, so far, the company has completed over 1000 metres of drilling.
Drill core samples from these first three holes have been sent on a rush basis to the lab and results are expected by early December. One hole on visual inspection did have a high-grade polymetallic mineralization intersection of 11.0 metres of massive sulphide mineralization from 211.4 to 222.4 metres.