Tietto Minerals Ltd (ASX:TIE)'s Mark Strizek tells Proactive they've intersected more high-grade gold in the second batch of infill drilling at the Abujar‐Gludehi deposit, part of its 3.35-million-ounce Abujar gold project in Côte d’Ivoire, West Africa. With intersections of up to 16 metres at 17.6 g/t gold from 69 metres, including 2 metres at 126.57 g/t, the company is confident of upgrading a portion of the indicated resources of 35 million tonnes at 1.5 g/t for 1.65 million ounces to the measured category.
Tietto Minerals talks further high-grade infill drill results at Abujar gold project