Clean Air Metals CEO Abraham Drost joined Steve Darling from Proactive to share results from their drilling program at the Thunder Bay North Project. Those results are from the Current Lake and Escape Lake deposits.
Drost telling Proactive the results include Hole ELR21-077 intersected 76.6m grading 5.67g/t Palladium Equivalents (PdEq)1 composed of 1.63g/t Platinum (AIM:ZERO) (Pt), 2.14g/t Palladium (Pd), 0.81% Copper (Cu), 0.41% Nickel (Ni). The company also included Hole CL21-007 which intersected 13.49m grading 6.09 g/t PdEq Drost says these results potential to materially impact the results of the upcoming PEA.