Silvercorp Metals (TSE: SVM – NYSE American: SVM) Vice President Lon Shaver joined Steve Darling from Proactive to bring news the company has reported results from their 2021 drill program at the SGX Mine. From October to June of this year, 298 diamond drill holes, including 242 underground holes and 56 surface holes, were completed at the SGX mine.
Shaver telling Proactive they have received results for 254 holes have been received, with 166 holes intercepting mineralization. These include a 2.50 m interval of vein S16W grading 20 grams per tonne silver, a 0.92 m interval of vein S16W grading 1,376 g/t Ag, and a 2.19 m interval of vein S21W1 grading 963 g/t Ag.