Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

General mining & base metals

Tocvan reports promising Phase II drill program results from Main Zone at Pilar gold-silver project in Mexico

It drilled 35.1m of 0.72 g/t gold equivalent in a 100m step-out east of the Main Zone at Pilar in Sonora, Mexico

Tocvan Ventures Corp (CSE:TOC) (FRA:TV3) reported promising results for the next four drill holes from the Phase II drill program at its flagship Pilar gold-silver project in Sonora, Mexico.

The Calgary, Alberta-based exploration development company has a Phase II drill program currently in progress with 3,500 meters (m) of reverse circulation (RC) drilling in 20 drill holes.

READ: Tocvan Ventures says it is 'extremely pleased' with early stage drill results at flagship Pilar project

The company highlighted results from four drill holes, which showed that drill hole JES-21-43 returned 35.1m at 0.66 grams per tonne (g/t) gold and 6 g/t silver (0.72 g/t gold equivalent) from 97.6 to 132.7m. The hole was planned to test the eastern extent of the Main Zone which correlates with a resistivity anomaly from a CSAMT survey. “An oxide zone with quartz veinlets was recorded from 41m depth to 93m followed by several quartz veins in oxidized andesite from 93m to 130m,” said the company.

Meanwhile, drill hole JES-21-40 tested the Main Zone at depth and to the east. Drilling intersected a broad low-grade zone from surface of 58m of 0.19 g/t gold. In addition, drill hole JES-21-41 tested the 50m down dip of drill hole JES-20-32, which returned 94.6m at 1.6 g/t gold.

Finally, drill hole JES-21-40 was conceived to test the Main Zone at depth and to the east. Drilling intersected a broad low-grade zone from surface of 58m of 0.19 g/t gold. Results from drill holes JES-20-33 (41.2m at 1.14 g/t gold) and JES-13-15 (34.5m at 1.27 g/t gold) through the same area of the Main Zone intersected higher grade, but were drilled from the opposite direction to JES-21-40, suggesting drilling from the east to the west through the zone is the optimal angle for intersecting mineralized structure, noted the company.

“JES-21-43 is a significant step-out to our Main Zone, 100-meters east of our Phase I drill hole JES-20-32,” Brodie Sutherland, who is VP Exploration at Tocvan, said in a statement. “This not only expands the potential width of our Main Zone but also shows a continuation of mineralization down dip towards the east. Pending assay results for the remaining drill holes includes a series of holes stepped further east to test the 4-Trench Extension and the continuation of mineralization at depth.”

The company said 13 drill holes are pending assay results.

Tocvan believes its Pilar gold-silver property is a low-sulphidation epithermal project. Three zones of mineralization have been identified in the north-west part of the property from historic surface work and drilling and are referred to as the Main Zone, North Hill and 4-Trench.

Contact the author Uttara Choudhury at uttara@proactiveinvestors.com

Follow her on Twitter: @UttaraProactive

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK