Alto Metals Ltd's (ASX:AME) Matt Bowles speaks to Proactive's Andrew Scott soon after intersecting the highest grade ever reported from the Vanguard prospect at its Sandstone gold project in Western Australia with a result of 4 metres at 60.6 g/t from 40 metres. Mineralisation at Vanguard has been extended to more than 800 metres of strike and remains open. A total of 13 drill holes for more than 2,600 metres remain pending for Vanguard and a further 30 drill holes for over 6,300 metres of drilling from the Lords Corridor. RC drilling is ongoing at the Lords Corridor, systematically testing several targets.
Alto Metals in a race to drill out its two key deposits at the Sandstone gold project