Great Bear Resources ( CVE: GBR- OTCQX: GTBAF) CEO Chris Taylor joined Steve Darling from Proactive with more drilling results from their Dixie Project that has now doubled the vertical extension of their LP Fault. Those results include 942.20 m downhole at 15.57 g/t Gold Over 3.05 metres. Taylor telling Proactive they had 3 new 400 to 450 metre step-down holes drilled along 500 metres of strike length that were successful in intersected the LP Fault host rocks and gold mineralization at depths of 700 – 820 vertical metres.
Great Bear continues to show extent of LP fault as company announces doubling of vertical extent