Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

Oil & Gas

Brookside Energy Orion Project Joint Venture with Stone Horse Energy makes second sale from Thelma Well

The Thelma Well was successfully brought online in early January, with an initial production rate of 130 barrels of oil per day and daily production expected to stabilise at a long-term optimal volume of about 30 barrels of oil per day.

Brookside Energy Ltd (ASX:BRK) (OTCMKTS:RDFEF) and Stonehorse Energy Ltd (ASX:SHE) have successfully made the second sale for the Thelma 12-1 well, located in the SCOOP Play, northeast of Brookside’s SWISH Area of Interest (SWISH AOI).

The second load of oil of around 300 barrels was sold on 20 January 2021, following an initial load of 313 barrels of oil on 30 December 2020.

The reservoir continues to perform as expected and is being produced in a safe and efficient manner aimed at maximising future oil recovery and revenue.

Technical work on Thelma acreage

The team continues to analyse technical data from the Thelma Well to identify other potential behind pipe zones or workover candidates.

Technical work is continuing on the additional 40 ‘held by production’ (HBP) acres acquired contiguous to the Thelma acreage.

The additional acreage gives the JV the option to drill a low-cost vertical well with access to seven known potential reservoirs, all of which are proven producers in the area.

In addition, future analysis could potentially identify other potential producing formations at depth.

With seven known potential reservoirs, all of which are proven producers in the area, a thorough geological, geophysical, and engineering review will ensure optimum well design and placement of any future low-cost vertical wells.

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK