Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

Gold & silver

Black Cat Syndicate sees 2D seismic survey work extended at Bulong Gold Project in WA

The 2D high-resolution seismic survey began recording on March 13, 2019, with data collection expected to be completed by the end of this month.

Black Cat Syndicate Limited (ASX:BC8) has welcomed the extension of an Eastern Goldfields 2D seismic survey across its Bulong Gold Project in WA as the work aims to image geology at depths between 300 metres and 5,000 metres showing the deep fault architecture responsible for gold transport.

The company has contributed about $12,000 as the extended survey will cover three southern corridors at the project.

Survey work is being carried out by the Geological Survey of Western Australia (GSWA) and the Department of Mines, Industry Regulation and Safety (DMIRS).

The survey, which is being run along existing roads, is designed to understand the geology underground and create maps of the subsurface.

READ: Black Cat Syndicate delivers maiden 109,000-ounce resource at Bulong Gold Project

Black Cat managing director Gareth Solly said: “This was an excellent initiative of the GSWA and DMIRS in which we are pleased to participate.

“We are looking forward to receiving the survey data which will further assist in our understanding of the prospective stratigraphy at depth.”

Resource growth potential along southern corridors

The Mhyree-Boundary, Queen Margaret and Trump corridors have a combined length of 17 kilometres and run in parallel along the length of Bulong, forming a north-south trending package of conglomeritic sediments with mineralised porphyritic units between ultramafic units.

Currently defined resources sit over only 14% of the corridors, which remain open along strike and at depth.

Black Cat’s drilling focus is on extensional drilling throughout 2019 with an upgrade of the resource expected in September 2019.

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK