Proactive Investors - Run By Investors For Investors

Kin Mining’s drilling confirms that Mertondale 5 gold ore body extends at depth

Results highlight the potential for lode-style open pit mining to extend and deepen the historical pit.
Drilling at Cardinia Gold Project
A new mineral resource estimate is underway after drilling at Mertondale 5 deposit

Kin Mining NL’s (ASX:KIN) drilling at Mertondale 5 pit within the Cardinia Gold Project (CGP) near Leonora in WA has confirmed that the ore body extends at depth.

Results of 14.0 metres at 2.5 g/t gold from 217 metres and 3.8 metres at 1.0 g/t from 279.2 metres highlight the potential for lode-style open pit mining to extend and deepen the historical pit.

This pit produced 384,671 tonnes at 3.06 g/t gold for 37,841 ounces.

READ: Kin Mining paves way for gold resource updates at Cardinia project

The drilling has significantly improved the company’s geological understanding of the Mertondale 5 prospect and will guide future resource development drilling.

This work will target expansion and category upgrade of the existing resources at the deposit, which are estimated at 1.03 million tonnes at 1.8 g/t for 60,000 ounces.

Three diamond holes were drilled at Mertondale 5 during February for a total of 1,022 metres.

The program was designed to test the down dip and down plunge extensions of high-grade gold mineralisation beneath the historical open cut pit.

All three holes intersected a sheared sequence of fine-grained felsic volcanic and sedimentary rocks and drilled through to the western basalt unit which bounds the mineralised shear zone.

READ: Kin Mining well-funded as it drills Lewis prospect at Cardinia project near Leonora

A broad zone of alteration including strongly anomalous silver and arsenic mineralisation accompanies the gold mineralisation.

Silver values are proportional to gold, higher in the eastern, hanging wall side and lower on the western footwall side.

The deposit remains open down plunge and at depth.

READ: Kin Mining drill results support resource upgrade at Helens deposit

Kin has submitted a suite of mineralised intervals for metallurgical test work while an updated geological model is underway.

This will be followed by an updated mineral resource estimate, which will be incorporated into a feasibility study for the CGP, which is due for completion in mid-2019.

Mertondale 5 was not included in the 2017 definitive feasibility study and has good potential to be included in a future mine plan for the CGP.

Subject to results of the test work and the resource estimate, further drilling is planned north and south of the existing Mertondale 5 pit.

View full KIN profile View Profile

Kin Mining NL Timeline

Related Articles

Lead-silver
January 16 2019
The company has been granted a key approval by the State Government to build processing plant and tailings storage facilities.
Zambia
May 29 2019
Executive chairman, Nick von Schirnding, said the Cheyeza and Lumbeta anomalies discovered at Zamsort are a “potential game changer"
South America's prospective lithium triangle extends upwards from Argentina, across Chile and to Bolivia
January 31 2019
Galan is named for the Cerro Galán volcano system near its Argentinian ground.

© Proactive Investors 2019

Proactive Investors Limited, trading as “Proactiveinvestors United Kingdom”, is Authorised and regulated by the Financial Conduct Authority.
Registered in England with Company Registration number 05639690. Group VAT registration number 872070825 FCA Registration number 559082. You can contact us here.

Market Indices, Commodities and Regulatory News Headlines copyright © Morningstar. Data delayed 15 minutes unless otherwise indicated. Terms of use