Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

General mining & base metals

Great Boulder Resources commences diamond drilling at Eastern Mafic targeting deep feeder zone

Drilling has commenced at the Zermatt prospect targeting high-tenor nickel sulphide mineralisation.

Great Boulder Resources Ltd (ASX:GBR) has commenced diamond drilling at the Eastern Mafic complex within the Yamarna Project in Western Australia.

Four diamond drill holes are planned to penetrate deep into the mafic complex at Zermatt, Cortina, ML 13 and Ben Lomond.

Drilling is targeting a possible nickel-copper feeder zone to the Eastern Mafic complex at depth.

High-grade nickel sulphide deposits are typically located in conduit systems of large mafic complexes, such as Nova-Bollinger, Voisey’s Bay and Nebo-Babel.

READ: Great Boulder Resources prepares for deeper drilling of nickel-rich Eastern Mafic target

The drill program aims to identify additional mafic intrusions with high-tenor nickel and copper sulphide mineralisation, which are key to the formation of high-grade sulphide deposits.

Drilling will also test the modelled extents of the Eastern Mafic complex and try to identify the base of the intrusion where accumulations of massive sulphide mineralisation may form.

Down-hole EM also planned

Down-hole electromagnetics (DHEM) surveys will be completed on all drill holes.

DHEM has successfully detected massive sulphide mineralisation over 200 metres from the drill hole in previous drilling and will be a key exploration tool in testing deeper targets at the Eastern Mafic.

First hole at Zermatt underway

The drill hole at Zermatt is planned as a 510-metre diamond tail off a 190-metre existing RC hole, reaching a target depth of 700 metres downhole and 600 metres below surface.

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK