Proactive Investors - Run By Investors For Investors

European Metals Holdings updated preliminary feasibility study should be ready in two months

The new study will model the production of higher value lithium hydroxide
European Metals Holdings updated preliminary feasibility study should be ready in two months
The Cinovec project is located on the doorstep of one of Europe's major car manufacturing hubs

European Metals Holdings Limited (LON:EMH) has commenced work on an update of the preliminary feasibility study for the Cinovec lithium and tin project in the Czech Republic.

This study will model the production of higher value lithium hydroxide, the use of which is increasing in lithium-ion batteries. The study will take two months to complete.

WATCH: European Metals Holdings to formally start DFS in coming months

Meanwhile, leach recoveries of between 94% and 95% have been replicated recently in laboratory testwork in Germany.

The company will also commence geotechnical drilling for the portal and decline positions of the planned underground operation within two weeks. Initially, four holes will be drilled at the site with the results from the drilling being used to finalise the preliminary design of the box cut and initial decline.

The pre-feasibility study general arrangement designs for the portal entries, the mining infrastructure and the milling plant have been updated over recent weeks to provide a more comprehensive design to be submitted as part of the Environmental Impact Assessment (EIA) for the project. 

"The move to modelling the production of lithium hydroxide is being undertaken due to the increased use of this product in Europe and the higher revenues associated with this,” said European Metals managing director Keith Coughlan.

“Czech and broader European battery manufacturers are moving towards the production of ever more efficient batteries and with our vision of supplying to the European market we need to keep in step with the market."

View full EMH profile View Profile

European Metals Holdings Timeline

Related Articles

coal
07:00
Peel Hunt has a ‘buy’ recommendation and target price of 205p each on Anglo Pacific shares.
Ilmenite ore
January 02 2019
The upgraded resource, which now stands at 101mln tonnes at 7.1% ilmenite, comes as the group prepares to publish a pre-feasibility study in the first quarter of 2019
1540886089_DJI_0816_resized.jpg
October 30 2018
Rainbow is continuing to drive towards a production rate of 400 tonnes per month

© Proactive Investors 2019

Proactive Investors Limited, trading as “Proactiveinvestors United Kingdom”, is Authorised and regulated by the Financial Conduct Authority.
Registered in England with Company Registration number 05639690. Group VAT registration number 872070825 FCA Registration number 559082. You can contact us here.

Market Indices, Commodities and Regulatory News Headlines copyright © Morningstar. Data delayed 15 minutes unless otherwise indicated. Terms of use