Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

Mining

Marmota reveals significant gold intercepts near Challenger gold mine

The project is situated 50 kilometres from the Challenger gold mine.

Marmota’s (ASX:MEU) phase 2 drilling program at its Aurora Tank Gold Project in South Australia has returned multiple significant gold intersections, all close to the surface.

The Aurora Tank project is situated 50 kilometres northeast of Kingsgate Consolidated’s (ASX:KCN) Challenger gold mine, which has produced over one million ounces of gold.

Marmota drilled 14 new intersections greater than 1 g/t gold (+4 metres composite samples) including:

- 4 metres at 5.0 g/t gold from 32 metres (8 metres at 3.6 g/t gold from 32 metres);

- 4 metres at 3.1 g/t gold from 16 metres; and

- 4 metres at 3.2 g/t gold from 12 metres.

The latest drilling extends the significant results from Marmota’s September program, yielding the best 4 metre composite result to date.

Marmota is searching for Challenger-style gold systems in its tenements covering more than 5,000 square kilometres of prospective area in the Gawler Craton.

The latest drilling has confirmed significant gold mineralisation over a 750 metre strike length, with mineralisation consistently within 50 metres of the surface.

Marmota will now carry out analysis of 1 metre drill samples over interesting intersections and analyse the data to interpret the geometry of mineralised zones to help select the next target locations.

Subsequently, a drilling program will expand the number of planned holes, and will consist of closer spaced drilling to prove geological continuity and enable a JORC compliant mineral assessment.

Marmota’s share price has increased by about 33% since the start of this year, last trading at $0.024.

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK