The company drilled four diamond core holes on the Central Lower Horizon that targeted flat lying and moderate gold mineralised zones.
All core samples are still on-site at this stage awaiting batch finalisation and shipment.
The drill rig shifted to “Pad 2” in East Creek, to target a 3 metre wide zone that graded 45.2 g/t gold in previous jackhammer channel samples.
The geological log from the first hole on Pad 2 indicates significant visible mineralisation and veining in the core from the surface to 25.8 metres.
The program will be paused after completion of drilling work on Pad 2 for field break for the crew.
Due to delays in the Swit Kai program, it is now intended to defer the drilling of a porphyry target in the valley until later this year.
Frontier’s share price has increased by 172% during the past six months, last trading at $0.044.