Skip to main content
The Markets by Proactive
Go to Proactive UK
Proactive UK has moved. Proactive’s coverage of London’s small caps continues on proactiveinvestors.com Go there →
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Coverage of London’s small caps continues on proactiveinvestors.com
Go to Proactive UK
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK
Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK

Gold & silver

Dragon Mining's stunning high grade gold intercept in Finland

Dragon Mining's decision to accelerate exploration has been vindicated with strong intercepts from areas adjacent to, above and below the Sarvisuo lode system, potentially significantly increasing the Orivesi Gold Mine life.

A massive gold intersection of; 20.0 metres at 34.67 g/t gold from 111 metres, has been discovered at the Dragon Mining (ASX: DRA) Orivesi Gold Mine in Finland.

Other significant hits included:

- 1.40m at 158.50 g/t gold from 142m;

- 1.65m at 21.29 g/t gold from 153m; and

- 1.20m at 12.65 g/t gold from 91m.

Included within the 20.0m at 34.67 g/t gold is:

- 6.00m at 72.52 g/t gold from 114m;

- 4.30m at 20.79 g/t gold from 122m; and

- 1.45m at 109.27 g/t gold from 128m.

Assays are still pending from 4 of the 20 hole drilling program, which was

designed to test the up-dip extensions of the Sarvisuo lode system between the surface and the 250m level.

Currently Orivesi has a 229,000 gold ounce resource, with 38,100 ounces in the measured category, with 77,800 indicated and 113,700 inferred.

Of strategic importance for the company, the Orivesi Gold Mine is located only 80 kilometres northeast of the Vammala Production Centre, which currently processes ore from Orivesi, and will soon process ore sourced from the Jokisivu Gold Mine.

The Vammala Plant is a 600,000 tonne per annum crushing, milling and flotation facility which was successfully recommissioned in June 2007 and is being operated on a 24 hour basis, 6 days on, 4 days off roster.

The environmental permit for the Vammala Production Centre is valid until 2016.

Article highlight:

Dragon Mining's decision to accelerate exploration has been vindicated with strong intercepts from areas adjacent to, above and below the Sarvisuo lode system, potentially significantly increasing the Orivesi Gold Mine life.

Advertisement
The Markets
by Proactive
Proactive UK has moved.
Small-cap coverage continues on .com
Go to Proactive UK