Power Metal Resources PLC (AIM:POW) said drilling has got underway at its Molopo Farms Complex nickel project in Botswana.
A high-priority conductor T1-14 is the hole's target, with drilling scheduled to go down to 700-800 metres.
An Audio-frequency Magnetotelluric (AMT) survey as well as magnetics were recently carried out over target areas T1-14 and T1-9 to refine targeting at two locations along the multi-kilometre scale steeply-dipping conductor.