GTI Energy Ltd (ASX:GTR, OTC:GTRIF) CEO Bruce Lane tells Proactive all permits and bonds are now in place for drilling to start mid-November at the company’s Lo Herma ISR Uranium Project in Wyoming’s Powder River Basin. Initial drilling of up to 26 holes is planned to validate and upgrade the maiden JORC inferred resource of 5.7 million pounds of uranium at an average grade of 630 parts per million. He adds that aerial geophysics results from Green Mountain are expected to be delivered in the coming weeks.
GTI Energy says uranium drilling imminent at Lo Herma