Musgrave Minerals Ltd (ASX:MGV, OTC:MGVMF) has released the updated 3D interactive model of the Cue Gold Project in WA incorporating both stage 1 pre-feasibility study (PFS) design and geoscientific data.
The 3D interactive model is hosted using the VRIFY Technology Platform and includes details of the Cue Gold Project location, topography, resource block models and PFS open pit, underground and infrastructure design.
Exploration activities such as drilling, surface geochemistry, geophysical surveys and models of the company’s gold deposits can be viewed in a 3D interface by accessing the links below:
3D Deck - Cue Gold Project – Stage 1 PFS
Cue Project - 360 Site Tour Deck - March 2023
Last month, Musgrave released the stage 1 PFS for the Cue Gold Project, demonstrating solid financial and technical fundamentals.
The stage 1 PFS outlined an initial five-year life of mine (LoM) with low-cost, high-margin gold production.