Tlou Energy said it has started work on the next phase of drilling at its Lesedi Gas-to-Power project in Botswana.
The Lesedi 6 gas production pod spudded on 10 April 2023 and is at a depth of approximately 59 metres.
Its pod comprises one vertical production well intersected by two lateral wells drilled horizontally through the target reservoir section for several hundred metres.
Lesedi 6 is located to the southwest and parallel to the existing Lesedi 4 gas production pod.