Snowline Gold CEO Scott Berdahl joined Steve Darling from Proactive to share news the company has released results from the Valley Zone showing the longest continuously mineralized interval the company drilled at Valley to date. Berdahl telling Proactive Hole V-22-029 returned 1.26 g/t Gold over 558.7 metres from surface, including 2.04 g/t Gold over 202.0 metres.
Snowline Gold results from Rogue Project shows longest continuously mineralized interval to date