Celsius Resources Ltd (ASX:CLA) executive director Peter Hume talks through an updated mineral resource estimate (MRE) for the MCB Copper-Gold Project in the Philippines. The revised MRE sits at 338 million tonnes at 0.47% copper and 0.12 g/t gold reported at a preferred lower cut-off grade of 0.2% copper. This consists of 1.6 million tonnes of contained copper and 1.3 million ounces of contained gold.
Celsius Resources welcomes updated resource for MCB Copper-Gold Project