Ion Energy CEO Ali Haji joined Steve Darling from Proactive to share news the company has released drill results from its Mongolian Lithium Project Urgakh Naran. The core drill holes going down about 954 metres. Haji told Proactive the company is very happy with the drilling so far with results like 123m at 278ppm lithium from 122m, with maximum lithium reported at 832ppm over 2 metres and 100m at 362ppm lithium from 65m, with maximum lithium at 601ppm over 2 metres. The company has also finished drilling of two hydrological test wells for testing of basin brines. A third test well is al being drilled right now.
Ion Energy releases positive drill results from Urgakh Naran Lithium Project in Mongolia