<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>Proactiveinvestors United Kingdom </title>
	<link>http://www.proactiveinvestors.co.uk</link>
	<description>Proactiveinvestors United Kingdom  RSS feed
            </description>
	<language>en</language>
	<pubDate>Thu, 24 May 2012 23:32:53 +0100</pubDate>
	<docs>http://blogs.law.harvard.edu/tech/rss</docs>
	<generator>Genera CMS</generator>
	<managingEditor>action@proactiveinvestors.com (Proactiveinvestors)</managingEditor>
	<webMaster>action@proactiveinvestors.com (Proactiveinvestors)</webMaster>
	<atom:link href="http://www.proactiveinvestors.co.uk/companies/dedicated_rss/9150/african-energy-resources-9150.xml" rel="self" type="application/rss+xml" />
		<item>
			<title>African Energy Resources unearths new coal discovery in Zambia </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/42574/african-energy-resources-unearths-new-coal-discovery-in-zambia--42574.html</link>
			<description><![CDATA[<p style="text-align: justify;">&nbsp;</p>
<p><a href="http://www.proactiveinvestors.com.au/companies/overview/1490/African+Energy+Resources" class="companyPopupTrigger" rel="1490">African Energy Resources</a>&nbsp;(<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) is adding to its African coal inventory with a new discovery at the Sinazongwe prospect in Zambia close to existing coal mines.<br /><br />Multiple coal seams were intersected in all of the completed core holes and, importantly, these coal seams are open along strike and down dip.&nbsp;<br /><br />Raw coal calorific values returned ranged from 10 to 26 megajoules per kilogram.<br /><br />Highlighting the potential for coking coal properties, there was an extensive presence of vitrinite bands.<br /><br />In mid-2011, reconnaissance exploration identified coal bearing sediments with a strike length of about 10 kilometres.<br /><br />These sediments are mapped by a geological survey as the extension of the stratigraphy that hosts the Maamba Colliery and the Collum Coal Mine, Zambia&rsquo;s only producing coal deposits.&nbsp;<br /><br /><strong><br />Next steps</strong><br /><br />African Energy now plans to test the coking properties of the coal as well as undertake washing yield analysis.&nbsp;<br /><br />This work will determine if the coal has the potential for one or two products &ndash; a higher value coking fraction and a middling for use as a power station fuel.&nbsp;<br /><br /><br /><strong>Sese &ndash; path to production</strong><br /><br />Meanwhile, over at the Sese Thermal Coal Project in Botswana, African Energy recently completed a milestone rail delivery of coal to Maputo.<br /><br />The significance of this is that the company has demonstrated that the transport of Sese coal via rail to the east coast of Africa is possible using existing infrastructure.<br /><br />The trial shipment is a huge step in African Energy&rsquo;s and Botswana's ambitious plans to fully exploit its coal resources with exports and power plants as the primary targets.&nbsp;<br /><br />Importantly, the east coast of Africa is considered an ideal location from which Botswana&rsquo;s coal may be ultimately exported to Asian markets.<br /><br />The market for Sese coal includes domestically with existing industrial customers and nearby markets, with this demand set to grow as new customers enter the market as new mines and businesses develop.<br /><br />There is also a growing regional market in Southern Africa, with the Power Pool facing net regional electricity generating deficit as Eskom exports scale back.<br /><br />Then there are the export markets where demand remains high, especially in India, with few undeveloped coal provinces capable of meeting this demand.</p>
<p><br /><br /><strong>Proactive Investors is a market leader in the investment news space, providing ASX &ldquo;Small and Mid-cap&rdquo; company news, research reports, StockTube videos and One2One Investor Forums.</strong></p>
<p>&nbsp;</p> ]]></description>
			<pubDate>Thu, 10 May 2012 07:07:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/42574/african-energy-resources-unearths-new-coal-discovery-in-zambia--42574.html</guid>
		</item>
		<item>
			<title>African Energy Resources director increases shareholding after first delivery of coal to Maputo</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/41551/african-energy-resources-director-increases-shareholding-after-first-delivery-of-coal-to-maputo-41551.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) non-executive director Michael Curnow has increased his stake in the company to 677,991 shares.<br /><br />Curnow purchased an additional 33,436 shares on-market for a consideration of $9,149, providing an average entry price of around $0.27.<br /><br />In addition to his fully paid ordinary shares, Curnow also holds 899,736 unlisted options exercisable at $0.31 on or before 30 June 2012.&nbsp;<br /><br />African Energy is meeting milestones at pace and last week completed its first rail delivery of coal from its Sese Thermal Coal Project in Botswana to Maputo in Mozambique.<br /><br />The significance of this is that the company has demonstrated that the transport of Sese coal via rail to the east coast of Africa is possible using existing infrastructure.<br /><br />African Energy&rsquo;s trial shipment is a huge step in the company's and Botswana's ambitious plans to fully exploit its coal resources with exports and power plants as the primary targets.<br /><br />Importantly, the east coast of Africa is considered an ideal location from which Botswana&rsquo;s coal may be ultimately exported to Asian markets.<br /><br />The market for Sese coal includes domestically with existing industrial customers and nearby markets, with this demand set to grow as new customers enter the market as new mines and businesses develop.<br /><br />African Energy is confident the regional industrial demand can absorb 1 million tonnes per annum from Sese.<br /><br />There is also a growing regional market in Southern Africa, with the Power Pool facing net regional electricity generating deficit as Eskom exports scale back.<br /><br />Then there are the export markets where demand remains high, especially in India, with few undeveloped coal provinces capable of meeting this demand.</p> ]]></description>
			<pubDate>Tue, 17 Apr 2012 07:11:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/41551/african-energy-resources-director-increases-shareholding-after-first-delivery-of-coal-to-maputo-41551.html</guid>
		</item>
		<item>
			<title>African Energy Resources in milestone delivery of coal to Maputo </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/41427/african-energy-resources-in-milestone-delivery-of-coal-to-maputo--41427.html</link>
			<description><![CDATA[<p style="text-align: justify;"><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (ASX: AFR) has completed a milestone rail delivery of coal from its Sese Thermal Coal Project in Botswana to Maputo in Mozambique.<br /><br />The significance of this is that the company has demonstrated that the transport of Sese coal via rail to the east coast of Africa is possible using existing infrastructure.<br /><br />A 25 tonne parcel of Sese coal was loaded into a Botswana Railways freight wagon at the Francistown railway station on 3 April, and dispatched to Maputo via Bulawayo and southern Zimbabwe.<br /><br />The coal wagon arrived at Grindrod&rsquo;s Matola coal terminal in Maputo on Saturday, 7 April.<br /><br />Minister of Transport and Communications, Nonofo Molefhi said that it was the first consignment of coal to be transported from a local mine in Botswana and exported to the Mozambican port where other opportunities are available.<br /><br /><strong>Markets for Botswana coal</strong><br /><br />Importantly, the east coast of Africa is considered an ideal location from which Botswana&rsquo;s coal may be ultimately exported to Asian markets.<br /><br />The market for Sese coal includes domestically with existing industrial customers and nearby markets, with this demand set to grow as new customers enter the market as new mines and businesses develop.<br /><br />There is also a growing regional market in Southern Africa, with the Power Pool facing net regional electricity generating deficit as Eskom exports scale back.<br /><br />Then there are the export markets where demand remains high, especially in India, with few undeveloped coal provinces capable of meeting this demand.<br /><br /><br /><strong>Rapid progress</strong><br /><br />Highlighting the rapid progress African Energy is making towards the development of Sese, the company has already appointed Industrial Coal Africa (ICA) as coal marketing manager to oversee the marketing, sales and logistics services for the project.<br /><br />ICA has previously serviced <a href="http://www.proactiveinvestors.co.uk/companies/overview/3588/Riversdale+Mining" class="companyPopupTrigger" rel="3588">Riversdale Mining</a>, which owned and operated the Zululand Anthracite Colliery prior to the company being taken over by <a href="http://www.proactiveinvestors.co.uk/companies/overview/3586/Rio+Tinto" class="companyPopupTrigger" rel="3586">Rio Tinto</a> (ASX: RIO) last year.<br /><br />The colliery produces high quality anthracite with an annual saleable tonnage of around 750,000 tonnes.<br /><br /><br /><strong>Milestones on the path to production</strong><br /><br />The path to production timeline has African Energy focused on completing a Bankable Feasibility study by the end of 2012, along with mining licence approvals and financing negotiations. The next step will then be the commencement of coal sales from stage one in mid-2013.<br /><br />The defining factor for Sese is that the entire deposit is amenable to open-cut strip mining, with low risk and low costs, and mining blocks are around 500 metres by 200 metres.<br /><br />The Bankable Feasibility Study is evaluating a mining operation of up to 5 million tonnes per annum of coal, with the option for an associated mine‐mouth power station of up to 600 megawatts.<br /><br />The Sese Coal Project hosts over 2.5 billion tonnes of coal at the project in the Indicated category, after more than 95% of the in-situ resource was classified.<br /><br />Part of the resource is now targeted to be moved into the higher confidence Measured category in the June 2012 quarter, which will be from Blocks B and C.<br /><br /><strong>Comment</strong><br /><br />With an initial 1-2Mtpa Stage 1 coal production operation planned in 2013, today's news is significant in Sese's and African Energy's evolution.&nbsp; While it may not get the market attention it deserves, it is a milestone nonetheless and a pathway for product to be railed to the coast with infrastructure already in place.<br /><br />With the market valuation re-tracing to current $88 million of late, this is very light for a company with the size of resource of Sese; with near term initial coal production and upside from next stages that incorporate higher production levels.&nbsp; In fact, we see Sese as a "must do" imperative if power shortages in southern Africa are not to worsen.<br /><br />Current prices on offer for AFR provide a cheap entry level for medium to long term investors.</p> ]]></description>
			<pubDate>Fri, 13 Apr 2012 04:58:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/41427/african-energy-resources-in-milestone-delivery-of-coal-to-maputo--41427.html</guid>
		</item>
		<item>
			<title>African Energy Resources ticks the boxes as it moves closer to development </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/40874/african-energy-resources-ticks-the-boxes-as-it-moves-closer-to-development--40874.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) is rapidly progressing operations at its Sese Thermal Coal Project in Botswana as it heads towards development. <br /><br />The company has completed the excavation of a 15,000 tonne bulk sample of coal from a 320 metre long box-cut.<br /><br />A site has been identified in South Africa to undertake the first combustion trials of Sese coal in an industrial boiler. <br /><br />This trial is being undertaken to confirm the combustion characteristics of Sese coal for typical industrial users that form part of African Energy&rsquo;s regional target market. <br /><br />This initial trial is a key step before undertaking further trials in Botswana and in neighbouring countries such as South Africa, Zambia and Namibia.<br /><br /><br /><strong>Coal Marketing Manager </strong><br /><br />African Energy has appointed Industrial Coal Africa (ICA) as coal marketing manager to oversee the marketing, sales and logistics services for the Sese Coal Project. <br /><br />ICA has previously serviced <a href="http://www.proactiveinvestors.co.uk/companies/overview/3588/Riversdale+Mining" class="companyPopupTrigger" rel="3588">Riversdale Mining</a>, which owned and operated the Zululand Anthracite Colliery prior to the company being taken over by <strong><a href="http://www.proactiveinvestors.co.uk/companies/overview/3586/Rio+Tinto" class="companyPopupTrigger" rel="3586">Rio Tinto</a> (ASX: RIO)</strong> last year.<br /><br />The colliery produces high quality anthracite with an annual saleable tonnage of around 750,000 tonnes.<br /><br /><br /><strong>Export Trials </strong><br /><br />A trial shipment of Sese coal will be shipped to the Matola Coal Terminal at the east coast port of Maputo in Mozambique in the coming weeks, under an agreement with Botswana Rail Corporation.<br /><br />During the past six months African Energy has been assessing options for exporting coal from Botswana to ports on the east and west coasts of Africa using the existing rail network that passes within 25 kilometres of the Sese Coal Project.<br /><br />The trial shipment is expected to help determine the freight and logistical issues associated with delivering Sese coal to a port.<br /><br /><br /><strong>Community Consultation</strong><br /><br />African Energy has received a positive response to its Sese Coal Project proposal in community consultation meetings held in February. No material adverse issues were raised by the community.<br /><br /><strong><br />Feasibility Studies</strong><br /><br />A Pre‐Feasibility Study is scheduled to be completed by the end of June and African Energy is on track to deliver a Bankable Feasibility Study by December.<br /><br />The Bankable Feasibility Study is evaluating a mining operation of up to 5 million tonnes per annum of coal, with the option for an associated mine‐mouth power station of up to 600 megawatts.<br /><br />The Sese Coal Project hosts over 2.5 billion tonnes of coal at the project in the Indicated category, after more than 95% of the in-situ resource was classified.<br /><br />Part of the resource is now targeted to be moved into the higher confidence Measured category in the June 2012 quarter, which will be from Blocks B and C.</p> ]]></description>
			<pubDate>Thu, 29 Mar 2012 06:02:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/40874/african-energy-resources-ticks-the-boxes-as-it-moves-closer-to-development--40874.html</guid>
		</item>
		<item>
			<title>African Energy Resources managing director Frazer Tabeart answers questions at One2One Investor Forum</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/40326/african-energy-resources-managing-director-frazer-tabeart-answers-questions-at-one2one-investor-forum-40326.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a>&rsquo; (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) main focus is the Sese coal project, located 50 kilometres to the south of the mining hub of Francistown in eastern Botswana. <br /><br />Frazer Tabeart, managing director, fielded answers during Question Time at last night&rsquo;s Proactive Investors&rsquo; 'Stars in 2012 Series' in Sydney, Wednesday 14th March.<br /><br />The presentation on the night can be <a href="http://genera.proactiveinvestors.com.au/genera/files/companies/20120314_afr_investor_presentation_march_2012.pdf">ACCESSED HERE</a>.<br /><br />The Sese Coal Project has an Indicated Resource containing 2.5 billion tonnes of coal and is amenable to open cut mining. <br /><br />Part of the resource is now targeted to be moved into the higher confidence Measured category in the June 2012 quarter, which will be from Blocks B and C.<br /><br />African Energy is currently focused on completing a Bankable Feasibility study by the end of 2012, along with mining licence approvals and financing negotiations, ahead of first coal sales from stage one in mid-2013. <br /><br /><br /><strong>Question from the audience</strong><br /><br />What do you see as major milestone&rsquo;s for investors to look for with <a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> over the next six to 12 months?<br /><br /><strong>Frazer Tabeart</strong><br /><br />I guess in an even shorter term than that I think over the next six weeks or so we hope to be in a position to announce progress on the first 300 megawatt power station. <br /><br />We would also expect within three months to be putting out a Measured Resource update and then some information on the first part of the Feasibility Study also in about three to four months&rsquo; time. <br /><br />Moving out a little bit by the end of the year we should be able to announce the full results of the Feasibility Study. <br /><br />We should hopefully be in a position to announce the successful power purchase agreement and then that puts us in a position to finance the power station as well as the mine. So quite a lot, all geared towards development. There is potential aside for announcements on reaching marketing agreements for regional sales of coal. <br /><br /><br /><strong>Question from the audience</strong><br /><br />The supply gap gets smaller for Namibia but for Zambia it gets bigger as the time goes up to 2025?<br /><br /><strong>Frazer Tabeart</strong><br /><br />What this takes into account is the new generating capacity that&rsquo;s been put in places or plant to be put in place in countries such as Zambia, which is why Zambia increases. In Namibia their one existing coal fired power station is on its last legs so that is actually going to go offspring. <br /><br />So Namibia&rsquo;s got a serious structural problem with our electricity generation and they don&rsquo;t have coal in country. <br /><br />So they&rsquo;ve either got to build a new power station for coal and import coal, they can find an alternative supply of electricity and import electricity or they can develop the Kudu gas field and the reason this excludes the Kudu gas field is to develop that gas field, the capital costs are so high they&rsquo;d have to generate far more electricity than is actually required in their region and which could reasonably supplied through their network. So that&rsquo;s not really a short term option either.<br /><br /><br /><strong>Question from the audience</strong><br /><br />How would you describe the quality of the Sese coal? You said in the early part of your talk you referred to it as a lower quality of coal.</p>
<p><strong>Frazer Tabeart</strong><br /><br />Yeah it&rsquo;s what would be referred to as sub-spec coal in the market. It&rsquo;s not the same quality coal as Newcastle grade coal. <br /><br />Our washed coal which will be exported will be in the range of 5,000 to 5,500 kilocalories per kilogram. Newcastle grade coal is 6,300 by comparison. <br /><br />Our export quality coal is clearly not the same as Newcastle. You get obviously a lower price for your product as a result of that, but it is the sort of coal which is now more widely traded than any other coal and the reason is the supply of Newcastle coal is dwindling, it&rsquo;s expensive and India&rsquo;s not prepared to pay $130 a tonne for coal. <br /><br />So they&rsquo;ve made the decision to go for lower quality coal and they just burn more of it in their power stations. It then becomes an ash management issue and a logistics issue, but they get a cheaper result at the end of the day. <br /><br />Very similar quality coal to the biggest coal basin in the world, which is Powder River Basin in America and that coal is now being exported to Europe.</p>
<p>&nbsp;</p> ]]></description>
			<pubDate>Thu, 15 Mar 2012 23:00:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/40326/african-energy-resources-managing-director-frazer-tabeart-answers-questions-at-one2one-investor-forum-40326.html</guid>
		</item>
		<item>
			<title>African Energy Resources’ stocks jump 15% as company moves to pre-development at Sese </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/38772/african-energy-resources-stocks-jump-15-as-company-moves-to-pre-development-at-sese--38772.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a>&rsquo; (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) shares went against the ASX trend today, gaining 15% to $A0.46, with nearly 4.3 million shares changing hands as of 3.33pm (AEDT). <br /><br />The company has been on an upwards share trajectory since mid-December last year as it moves from exploration to pre-development at its Sese Thermal Coal Project in Botswana. <br /><br />Last week <a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> upgraded the Sese resource to over 2.5 billion tonnes of coal in the Indicated category, after more than 95% of the in-situ resource was classified. <br /><br />Part of the resource is now targeted to be moved into the higher confidence Measured category in the June 2012 quarter, which will be from Blocks B and C.<br /><br />African Energy is currently focused on completing a Bankable Feasibility study by the end of 2012, along with mining licence approvals and financing negotiations, ahead of first coal sales from stage one in mid-2013. <br /><br />The defining factor for Sese is that the entire deposit is amenable to open-cut strip mining, with low risk and low costs, and mining blocks are around 500 metres by 200 metres.</p> ]]></description>
			<pubDate>Thu, 09 Feb 2012 05:15:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/38772/african-energy-resources-stocks-jump-15-as-company-moves-to-pre-development-at-sese--38772.html</guid>
		</item>
		<item>
			<title>African Energy Resources hits 2.5 billion tonnes Indicated coal Resource in Botswana</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/38482/african-energy-resources-hits-25-billion-tonnes-indicated-coal-resource-in-botswana-38482.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a>' (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) latest resource upgrade provides further potential for a 30 million tonne per annum thermal coal production operation for over 100 years, starting in 2013.<br /><br />The project now hosts over 2.5 billion tonnes of coal at the project in the Indicated category, after more than 95% of the in-situ resource was classified.<br /><br />Part of the resource is now targeted to be moved into the higher confidence Measured category in the June 2012 quarter, which will be from Blocks B and C.<br /><br /><br /><strong>Coal product options</strong><br /><br />Currently the Lower Main Seam accounts for 61% of the total 2,626 million tonne resource, importantly containing coal which is suitable for washing to create an export quality product (up to 5,550 Kcal/kg).<br /><br />Providing options for African Energy, the Upper Main Seam coal can be washed, or blended with the Lower Main Seam middlings to make a product which is suitable for use as power station fuel. Full Seam raw coal is also suitable as a power station fuel.<br /><br />The coal occurs in one main seam which averages 14 metres thickness, is close to surface and which is expected to be amenable to low strip-ratio open pit mining.<br /><br /><br /><strong>Milestones on the path to production</strong><br /><br />The path to production timeline has African Energy focused on completing a Bankable Feasibility study by the end of 2012, along with mining licence approvals and financing<br />negotiations. The next step will then be the commencement of coal sales from stage one in mid-2013.<br /><br />The defining factor for Sese is that the entire deposit is amenable to open-cut strip mining, with low risk and low costs, and mining blocks are around 500 metres by 200 metres.<br /><br />The layout of exploration box-cut for the bulk sample has been designed to be the first access ramp for Stage one coal-mine, which reduces the development timeframe for the project construction.<br /><br /><br /><strong>Markets for Botswana coal</strong><br /><br />The market for Sese coal includes domestically with existing industrial customers and nearby markets, with this demand set to grow as new customers enter the market as new mines and businesses develop.<br /><br />There is also a growing regional market in Southern Africa, with the Power Pool facing net regional electricity generating deficit as Eskom exports scale back.<br /><br />Then there are the export markets where demand remains high, especially in India, with few undeveloped coal provinces capable of meeting this demand. <br /><br /><br /><strong>Analysis</strong><br /><br />With the latest resource upgrade, AFR is valued on an EV/Resource tonnes well under its peer averages. Recent pull-back in market valuation provides an opportunity for savvy investors to re-load on AFR. Sese is potentially in the vanguard to become the largest coal project in Botswana and also one of lowest unit cost coal projects in Africa, once developed.</p> ]]></description>
			<pubDate>Thu, 02 Feb 2012 03:18:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/38482/african-energy-resources-hits-25-billion-tonnes-indicated-coal-resource-in-botswana-38482.html</guid>
		</item>
		<item>
			<title>African Energy Resources bulks up thermal coal sampling as large scale testing draws nearer</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/38317/african-energy-resources-bulks-up-thermal-coal-sampling-as-large-scale-testing-draws-nearer-38317.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) is drawing close completing the excavation of a bulk sample of coal at the Sese Thermal Coal Project, with large scale testing to follow.<br /><br />The Sese project, in northeast Botswana, has an initial JORC Resource of 2.73 billion tonnes of coal. A Bankable Feasibility Study and Environmental Impact Assessment are underway to evaluate a mining operation of up to 5 million tonnes per annum of coal.<br /><br />About 15,000 tonnes of coal will be stockpiled, from both the upper and lower sections of the Sese Main Seam, for the bulk sample.<br /><br />Coal from the bulk sample will be used for a series of large scale tests, including:<br /><br />- Export trials to test the capacity and freight tariffs using the existing rail/port infrastructure<br />- Combustion tests for power station boilers to assist negotiations of coal sales agreements to power station customers<br />- Confirmation of the washing yields derived from previous testing of slimline drill core samples. This will confirm the product specification ranges of washed coal for sale<br />- An assessment of the coal&rsquo;s suitability for coal to liquids processing which if favourable will be followed by a large scale test programme utilising 500 tonnes or more coal<br />- Samples of coal from the bulk sample will be made available to potential industrial customers to undertake their own testwork.<br /><br />Other testwork to be carried out will be determined by the Bankable Feasibility Study.<br /><br />A 60 tonne batch of coal has been sent to a processing facility in South Africa for processing.<br /><br />The Sese project includes one prospecting licence and a number of prospecting licence applications, close to rail, road and power infrastructure.</p> ]]></description>
			<pubDate>Mon, 30 Jan 2012 00:40:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/38317/african-energy-resources-bulks-up-thermal-coal-sampling-as-large-scale-testing-draws-nearer-38317.html</guid>
		</item>
		<item>
			<title>African Energy Resources chairman continues on market share purchases</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/37865/african-energy-resources-chairman-continues-on-market-share-purchases-37865.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) executive chairman Alasdair Cooke has topped up his shareholding in the company with the purchase of 57,100 shares. <br /><br />Cooke acquired the additional shares for a consideration of A$14,390, providing an average entry price of $0.25.<br /><br />The latest purchase brings Cooke&rsquo;s total direct interest in African Energy to nearly 12.2 million shares. <br /><br />In November last year bulk sampling work began at the company&rsquo;s 2.7 billion tonne Sese Coal Project in Botswana.<br /><br />Local contractor G&amp;S Projects was mobilised to the site in October to obtain a bulk sample of 10,000 tonnes of coal to provide material for ongoing test work.<br /><br />The bulk sample is expected to be delivered in early 2012.</p> ]]></description>
			<pubDate>Tue, 17 Jan 2012 06:25:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/37865/african-energy-resources-chairman-continues-on-market-share-purchases-37865.html</guid>
		</item>
		<item>
			<title>African Energy Resources chairman increases interest by 850,000 shares</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/37427/african-energy-resources-chairman-increases-interest-by-850000-shares-37427.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) executive chairman Alasdair Cooke has been buying up big in the company over recent weeks, acquiring 850,000 shares in December.<br /><br />Cooke purchased an initial 350,000 shares on market at a cost of about $0.28 per share for a total consideration of $100,575 on December 9.<br /><br />This was followed with a further 500,000 shares purchased on market between December 20 and 22, at about $0.23 per share for a total of $118,735.<br /><br />These acquisitions bring Cooke&rsquo;s total direct interest in African Energy to 12.1 million shares, along with more than 2 million unlisted options.<br /><br />Cooke also has indirect holdings of more than 15 million shares.<br /><br />In November 2011 bulk sampling work began at African Energy&rsquo;s 2.7 billion tonne Sese Coal Project in Botswana, with the aim of extracting a bulk sample of 10,000 tonnes of coal to provide material for ongoing test work.<br /><br />Local contractor G&amp;S Projects was mobilised to the site in October and the bulk sample is expected to be delivered in early 2012.</p> ]]></description>
			<pubDate>Wed, 04 Jan 2012 03:53:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/37427/african-energy-resources-chairman-increases-interest-by-850000-shares-37427.html</guid>
		</item>
		<item>
			<title>African Energy Resources  chairman tops-up shareholding</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/36478/african-energy-resources-chairman-tops-up-shareholding-36478.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) executive chairman Alasdair Cooke acquired 200,000 shares on market at $0.281 per share on 29 and 30 November .<br /><br />The shares were purchased for a consideration of $56,302 and Cooke now holds 11,281,389 ordinary shares.<br /><br />On November 21 <a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> was rated a speculative buy by Helmsec Global Securities, based on the company&rsquo;s large near-surface Sese coal project, which has been valued at $1 per share.<br /><br />In September, results from a Concept Study confirmed the technical and commercial viability of the project, with robust cash flows and strong operating margins a possibility.<br /><br />A 2.7 billion tonne coal resource has been identified at Sese, with a Feasibility Study for initial development underway.</p> ]]></description>
			<pubDate>Sun, 04 Dec 2011 23:44:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/36478/african-energy-resources-chairman-tops-up-shareholding-36478.html</guid>
		</item>
		<item>
			<title>African Energy Resources promise highlighted in Helmsec report</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35849/african-energy-resources-promise-highlighted-in-helmsec-report-35849.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) has been rated a speculative buy by Helmsec Global Securities, based on the company&rsquo;s large near-surface Sese coal project.<br /><br />In September, results from a Concept Study confirmed the technical and commercial viability of the project, with robust cash flows and strong operating margins a possibility.<br /><br />A 2.7 billion tonne coal resource has been identified at Sese, with a&nbsp; Feasibility Study for initial development underway.<br /><br />The following is an excerpt from Helmsec&rsquo;s report.<br /><br />AFR has a massive, near surface coal resource sitting in the centre of a chronic regional power shortage. Development of a coal mine and power station at Sese is a logical supply response to the unresolved Southern African power shortage. <br /><br />A power station is one crucial leg of AFR&rsquo;s four stage plans for Sese. A mine and wash plant producing coal for regional industry will come first to establish capability and key relationships. AFR is confident the regional industrial demand can absorb 1 Mtpa from Sese. From there negotiations with governments, IPPs and financiers will be made easier. <br /><br />AFR&rsquo;s ultimate goal for Sese is the Indian thermal coal market, which requires a new rail and port link. Extraordinary volumes and margins for coal exporters beckon, with finance standing in the way of a green light for one of two rail and port proposals. <br /><br />Sese is valued here at $1.00 per African Energy share, based on early indications of future cash flows, after discounts for extensive market, estimation and finance risks. <br /><br />The supply response to the power shortages in southern Africa is likely to continue to disappoint unless relatively easy options like Sese are pursued. AFR is a play on Southern Africa&rsquo;s continued development, to the mining boom that is currently driving economic growth in the region, and to India&rsquo;s relentless electrification drive. Helmsec reiterates a Speculative Buy recommendation.<br /><br />KEY POINTS<br /><br />- AFR&rsquo;s 2.7 billion tonne coal resource at Sese consists of a single seam up to 26 metres thick, all of it within 80 metres of the surface. The Sese resource has been defined over 30 km of strike and up to 10 km down dip. <br /><br />-&nbsp; In the last few years power shortages in southern Africa and the emergence of India as a major importer of thermal coal have put Botswana in position to develop its massive coal resources for the first time. Sese is potentially the largest coal project in Botswana and also potentially the 2nd lowest unit cost coal project in Africa. <br /><br />- Initial wash tests indicate Sese can potentially produce a domestic power station coal product and a thermal coal product suitable for export. <br /><br />- Sese is next to existing infrastructure that could support a medium scale operation delivering coal to regional customers. <br /><br />- A compelling case can be made for the establishment of an Independent Power Project at Sese, supplying base load electricity to regional markets. <br /><br />- The Botswana government, in partnership with neighbouring states, various private interests and development banks, has advanced two rail and port projects that would support +30 Mtpa coal exported from Sese. Botswana coal is likely to find ready markets in India.</p> ]]></description>
			<pubDate>Sun, 20 Nov 2011 22:56:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35849/african-energy-resources-promise-highlighted-in-helmsec-report-35849.html</guid>
		</item>
		<item>
			<title>African Energy Resources managing director ups indirect stake in company </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35536/african-energy-resources-managing-director-ups-indirect-stake-in-company--35536.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) managing director Dr Frazer Tabeart has increased his indirect shareholding in the company.<br /><br />Tabeart bought 100,000 shares on-market through Revenge Holdings for a consideration of $31,341, providing an average entry price of $0.313. <br /><br /><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> has begun bulk sampling work at its 2.7 billion tonne Sese Coal Project in Botswana following a Concept Study in September that confirmed the project's viability. <br /><br />Robust cash flows and strong operating margins are possible under a variety of scenarios that do not require new rail and port infrastructure.<br /><br />The study concluded that the project could be developed through a staged approach. An initial, up to 1 million tonnes per annum operation (Stage 1) can generate cash flows from 2013 and involves selling washed coal into domestic and regional markets.<br /><br />Additional coal sales to a power station, and moderate volumes of export sales could expand Sese into a 3‐5 million tonnes per annum (Stage 2) operation.<br /><br />India is considered the likely market for Sese thermal coal, with demand set to increase from 50 million tonnes per annum in 2010 to 210 million tonnes per annum by 2025.<br /><br />China is also experiencing a surge in demand for the resource with thermal coal imports expected to double to 213 million tonnes by 2025.</p> ]]></description>
			<pubDate>Mon, 14 Nov 2011 03:20:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35536/african-energy-resources-managing-director-ups-indirect-stake-in-company--35536.html</guid>
		</item>
		<item>
			<title>African Energy Resources begins bulk sampling work at Sese Coal Project in Botswana</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35414/african-energy-resources-begins-bulk-sampling-work-at-sese-coal-project-in-botswana-35414.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/9150/African+Energy+Resources" class="companyPopupTrigger" rel="9150">African Energy Resources</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) has begun bulk sampling work at its 2.7 billion tonne Sese Coal Project in Botswana following a Concept Study in September that confirmed the project's viability.<br /><br />As part of the Bankable Feasibility study, the AFR has committed to extract a bulk sample of 10,000 tonnes of coal to provide material for ongoing test work. <br /><br />The earlier Concept Study confirmed an initial; up to 1 million tonnes per annum (Mtpa) operation (Stage 1) can generate cash flows from 2013 and involves selling washed coal into domestic and regional markets. <br /><br />Local contractor G&amp;S Projects was mobilised to the site in October and has commenced drill and blast operations to deliver the bulk sample in early 2012.<br /><br />The box‐cut has been sited and designed so that it can be expanded into a development ramp for future mining<br />operations.<br /><br />Coal from the bulk sample will be used for a series of large scale tests, including:<br /><br />- Export trials to test the capacity and freight tariffs using the existing rail/port infrastructure to <br /><br />- Combustion tests for power station boilers to assist negotiations of coal sales agreements to power station customers<br /><br />- Confirmation of the washing yields derived from previous testing of slimline drill core samples. This will confirm the product specification ranges of washed coal for sale<br /><br />- An assessment of the coal&rsquo;s suitability for coal to liquids processing which if favourable will be followed by a large scale test programme utilising 500 tonnes or more coal<br /><br />- Samples of coal from the bulk sample will be made available to potential industrial customers to undertake their own testwork.<br /><br />A stage 2 operation as envisaged through a BFS would refine the technical and commercial evaluation of a mining operation to deliver up to 5 million tonnes per annum.<br /><br /><strong>Background to Sese Project</strong><br /><br />The Sese Coal project comprises one wholly owned prospecting licence and a number of prospecting licence applications located in northeast Botswana, approximately 50km southwest of the town of Francistown. <br /><br />The project is situated close to the sealed highway between Francistown and Gaborone and is easily accessible. <br /><br />Rail, road and power infrastructure is close to the project area.<br /><br />African Energy discovered a large deposit of thermal coal at Sese in June 2010 and announced an initial resource estimate of 2.73 billion tonnes of coal within Prospecting Licence PL96/2005 (0.5 billion tonnes Indicated Resource and 2.23 billion tones Inferred Resource) in May 2011. <br /><br /><strong>Concept Study Results were positive</strong><br /><br />Attractive project economics have been forecast and include: Stage 1 (Contractor) OPEX at US$13/ROM tonne and CAPEX at US$46 million; and Stage 2 (Contractor) OPEX at US$10/ROM tone and CAPEX at US$104 million.<br /><br />The Sese deposit has a number of characteristics ideally suited to low cost open cut mining methods:<br /><br />- Large continuous seam with a strike‐length of some 35km;<br />- Thick main seam which averages 14m thick;<br />- Full seam strip ratios of 1.6:1<br /><br />Components of the BFS have already commenced, most notably an infill drilling programme to deliver a Measured Resource.</p> ]]></description>
			<pubDate>Wed, 09 Nov 2011 23:13:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35414/african-energy-resources-begins-bulk-sampling-work-at-sese-coal-project-in-botswana-35414.html</guid>
		</item>
		<item>
			<title>African Energy Resources extends potential investor reach to Botswana with BSE listing</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/34970/african-energy-resources-extends-potential-investor-reach-to-botswana-with-bse-listing-34970.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  joins a growing list of international resource companies as it prepares  to list on the Botswana Stock Exchange (BSE) following approval for the  dual-listing. <br /><br />The company will join the likes of Discovery  Metals (ASX: DML), A‐Cap Resources (ASX: ACB) and CIC Energy (TSX: ELC)  when it begins trading on the BSE later today. <br /><br />The move will  place increased investor focus on its wholly owned Sese Coal Project,  where the company continues to make rapid progress towards developing  the 2.7 billion tonne project.<br /><br />Importantly, Botswana is an  emerging global coal province widely perceived as an excellent  investment destination by mining companies. <br /><br />The dual-listing  provides African Energy with access to an additional shareholder base  within Botswana that includes a number of significant institutional  investors and pension funds.<br /><br />A formal ceremony will be held in Gaborone today to mark the admission of the company to the BSE.<br /><br /><br /><strong>The Sese Coal Project <br /></strong><br />The  Sese Coal Project is supported by good infrastructure 25 kilometres to  the east, including road, rail and a 220 kilovolt power line. <br /><br />India  is considered the likely market for Sese thermal coal, with demand set  to increase from 50 million tonnes per annum in 2010 to 210 million  tonnes per annum by 2025.<br /><br />China is also experiencing a surge in  demand for the resource with thermal coal imports expected to double to  213 million tonnes by 2025.<br /><br />In September, African Energy  Resources received results from a Concept Study that confirm the  technical and commercial viability of the project.<br /><br />Robust cash  flows and strong operating margins are possible under a variety of  scenarios that do not require new rail and port infrastructure.<br /><br />The  study concluded that the project could be developed through a staged  approach. An initial, up to 1 million tonnes per annum operation (Stage  1) can generate cash flows from 2013 and involves selling washed coal  into domestic and regional markets.<br /><br />Additional coal sales to a  power station, and moderate volumes of export sales could expand Sese  into a 3‐5 million tonnes per annum (Stage 2) operation.</p>]]></description>
			<pubDate>Mon, 31 Oct 2011 05:27:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/34970/african-energy-resources-extends-potential-investor-reach-to-botswana-with-bse-listing-34970.html</guid>
		</item>
		<item>
			<title>African Energy Resources delivers “commercially viable" Concept Study at Sese Coal Project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/33385/african-energy-resources-delivers-commercially-viable-concept-study-at-sese-coal-project-33385.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  has ticked an important box for the development of the 2.7 billion  tonne Sese Coal Project in Botswana after receiving results from a  Concept Study that confirm the technical and commercial viability of the  project.<br /><br />Robust cash flows and strong operating margins are  possible under a variety of scenarios that do not require new rail and  port infrastructure.</p>
<p>The Concept Study was completed under the supervision Philip Clark,  the  company&rsquo;s Senior Coal Consultant, along with a number of other   independent consultants including GEMECS, Coffey Mining, Minserve Pty   Ltd and Wood Mackenzie.<br /><br />Attractive project economics have been  forecast and include: Stage 1 (Contractor) OPEX at US$13/ROM tonne and  CAPEX at US$46 million; and Stage 2 (Contractor) OPEX at US$10/ROM tone  and CAPEX at US$104 million.<br /><br />The Study concluded that the project could be developed through a staged approach. <br /><br />An  initial, up to 1 million tonnes per annum (Mtpa) operation (Stage 1)  can generate cash flows from 2013 and involves selling washed coal into  domestic and regional markets. <br /><br />Additional coal sales to a power  station, and moderate volumes of export sales could expand Sese into a  3‐5Mtpa (Stage 2) operation. <br /><br />Existing rail and port  infrastructure are able to support Stage 1 and Stage 2 operations. Stage  1 and Stage 2 were considered to be best suited to a contractor  serviced operation.<br /><br />Expansion of the project beyond Stage 2 is  possible through increased sales of coal to power stations, and/or  through increased volumes of export sales (with India the likely  market). <br /><br />Increased volumes of export sales would require the construction of a heavy haulage railway and associated port infrastructure.<br /><br />The  ultimate Stage 4 project could exceed 30Mtpa production assuming new  infrastructure is built. Stage 3 and Stage 4 will likely be an owner  operated mine.<br /><br />African Energy Resources believes that further  evaluation of the project is warranted and has approved a bankable  feasibility study to refine the technical and commercial evaluation of a  mining operation to deliver up to 5Mtpa (Stage 2 operation).<br /><br /><br /><strong>Infrastructure</strong><br /><br />A  detailed assessment of rail and port infrastructure was not undertaken  as part of the Concept Study, although the company is maintaining  dialogue with long term infrastructure consortia evaluating both  east‐coast and west‐coast proposals. <br /><br />Stage 1 and Stage 2  projects do not involve the export of large tonnages of coal and  therefore require no additional rail or port infrastructure beyond that  which exists within 30 kilometres of the deposit. <br /><br />This allows  Stage 1 and Stage 2 to be developed in a short time frame which is not  captive to new infrastructure development. The volume of export coal  that is commercially viable from the Stage 2 operation will be  determined once export trials are concluded using material from the  forthcoming bulk‐sample pit. <br /><br />The timing of Stage 3 and Stage 4  operations will be determined by the timetable of proposed new  heavy‐haulage railways or expansions of power station requirements.<br /><br /><strong>Geology and Resource</strong><br /><br />The  Sese coal deposit occurs in eastern Botswana and is hosted in the same  Lower Karoo sediments as all other coal deposits in the region. The coal  at Sese is characterised by a thick main coal seam which occurs close  to the basal unconformity between the Karoo Supergroup and the  Precambrian<br />basement.<br /><br />The Sese Main Seam averages 14m in  thickness, varying from 5m to 26m thick, and is close to surface. The  Main Seam has been subdivided into the better quality Lower Main Seam  (which accounts for over 60% of the total resource) and the thinner  Upper Main Seam. <br /><br />Along the northern margin of the tenement the  coal is within 15m of the surface, deepening gently to no more than 80m  at the southern boundary. Resource delineation drilling in 2010 provided  information for an initial resource estimate in May which included 500  million tonnes of Indicated Resource and 2,223 million tonnes of  Inferred Resource.<br /><br /><br /><strong>Mining Method</strong><br /><br />The Sese deposit has a number of characteristics ideally suited to low cost open cut mining methods:<br /><br />- Large continuous seam with a strike‐length of some 35km;<br />- Thick main seam which averages 14m thick;<br />- Full seam strip ratios of 1.6:1<br />- Little apparent structural modification, and<br />- Very shallow dips in a very flat surface terrain.<br /><br />Mine  design has been based on conventional open‐cut strip mining where  mining occurs along the strike of the deposit with successive strips  being mined down‐dip. Mining commences with a box‐cut with waste  initially hauled external to the pit. <br /><br /><strong><br />Marketing &ndash; Coal Price forecasts</strong><br /><br />Wood  Mackenzie has forecast a free‐on‐board (east‐coast port, southern  Africa) price of approximately US$80/t for Sese export coal in 2013,  increasing gradually to over US$100/t by 2025. This assumes that<br />Sese  coal will compete with Indonesian sub‐bituminous coals and that  Mozambique middlings will not exert downward pressure on prices.<br /><br />Price  projections for supply of domestic coals into southern African power  stations range from US$1.20 to US$1.60 per MJ/kg. Based on this  assumption, Sese power station coal has a range of expected mine‐gate<br />prices between US$25 and US$35/t depending on product specifications.<br /></p>
<p><strong>Operating Cost Estimates</strong><br /><br />Operating cost estimates have  been prepared for each Stage and include provision for site preparation,  drill and blast, waste mining, coal mining, general and administration  and rehabilitation. <br /><br />The estimates have been prepared to a  nominal +/‐ 30% to +/‐35% basis (US dollars at 1 July 2011) with no  provision for contingency or escalation.<br /><br />These operating cost  estimates have been benchmarked against the Wood Mackenzie Southern  African Coal Supply Series Cost Analysis May 2011, and are consistently  along the industry trend for ROM costs vs. ROM strip ratio, lending  further credibility to the estimates. <br /><br />Cost estimates have also  been confirmed with initial discussions from southern African based  mining contractors. The operating costs exclude the cost of rail and  port costs which have yet to be established, but which are not relevant  to Stage 1 and Stage 2.<br /><br /><strong>Capital Cost Estimates</strong><br /><br />Capital  costs estimates for each stage were generated to include all  pre‐production mine development, major mobile mining plant (Stage 3 and  Stage 4 owner operated mines only), coal handling and processing plant  (minor costs only for Stage 1 and Stage 2 related to earthworks, raw  water and rejects handling), support plant, non‐structural assets and  pre‐production operational readiness, training and management costs. <br /><br />The  estimates have been prepared to a nominal +/‐ 30% to +/‐ 40% basis (US  dollars at 1 July 2011), and include sustaining capital but no  provisions for escalation or contingency.<br /><br /><strong>Bankable Feasibility Study</strong><br /><br />Components of the BFS have already commenced, most notably an infill drilling programme to deliver a Measured Resource.<br /><br />As  part of the BFS, a Botswana consultant, Ecosurv has been appointed to  undertake an Environmental Impact Assessment (EIA) on behalf of African  Energy. <br /><br />This commenced in July 2011 and has now reached the  stage of community and stakeholder consultation, from which the terms of  reference for the formal<br />documentation of the EIA will be derived. It is expected that the EIA will take 12‐15 months to complete.</p>]]></description>
			<pubDate>Wed, 21 Sep 2011 01:47:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/33385/african-energy-resources-delivers-commercially-viable-concept-study-at-sese-coal-project-33385.html</guid>
		</item>
		<item>
			<title>African Energy Resources to boost thermal coal confidence categories at 2.7Bt Sese</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/32918/african-energy-resources-to-boost-thermal-coal-confidence-categories-at-27bt-sese-32918.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  has initiated an extensive exploration program at the Sese thermal coal  project in Botswana, targeted at boosting the confidence categories of  the existing JORC 2.73 billion tonne coal resource.<br /><br />Currently the resource breaks down as 0.5 billion tonnes Indicated and 2.23 billion tonnes Inferred.<br /><br />Highlighting how quickly Africa Energy is moving the project forward, currently five drill rigs are infill drilling at Sese.<br /><br />The  company is targeting a Measured Resource in the northern half of  Block‐B and part of Block‐C, which are the two areas with the lowest  stripping ratios.<br /><br />The program will comprise 98 core holes on a  500 metres by 500 metre grid, with six large diameter core holes to  collect samples for additional test work, along with a minimum of eight  reverse circulation percussion holes to provide structural information  in key areas.<br /><br />The Measured resource is forecast to be delivered in the June quarter of 2012.<br /><br />The  Indicated Resource delineation drilling at Sese was completed last  month, with Africa Energy expecting to announce an upgrade for the  deposit to an Indicated Resource in the December quarter of 2011.<br /><br /><br /><strong>The Sese Project development plan</strong><br /><br />Africa  Energy has already outlined the development of Sese, which has areas  with very low strip-ratios of &lt;2:1, which is amenable to open cut  mining.<br /><br />Importantly, the coal has the potential to produce large  tonnages of power station feed, along with potential to wash to export  quality.<br /><br />The development plan includes a trial pit of a 10,000 tonne bulk sample for market tests.<br /><br /><br /><strong>More pending milestones</strong><br /><br />The news flow for Africa Energy comprises more than the pending confidence category upgrades.<br /><br />The  company is also set to commence a Definitive Feasibility Study in the  September quarter of 2011, with a decision on an initial 1 million tonne  per annum development by early 2013.<br /><br />Africa Energy has then  outlined the potential to ramp-up to 5 million tonnes annually over a  short time frame, with a conceptual target of 20-30 million tonnes per  year through to the export market.</p>]]></description>
			<pubDate>Fri, 09 Sep 2011 05:43:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/32918/african-energy-resources-to-boost-thermal-coal-confidence-categories-at-27bt-sese-32918.html</guid>
		</item>
		<item>
			<title>African Energy Resources chairman tops-up shareholding</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/31685/african-energy-resources-chairman-tops-up-shareholding-31685.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) executive chairman Alasdair Cooke has acquired 300,000 shares at $0.34 in an on market trade.<br /><br />Cooke purchased the shares for a consideration of $102,842 and now holds 11,081,339 ordinary shares in the company.<br /><br />Earlier  in the year African Energy reported and initial resource of 2.73  billion tonnes of thermal coal at its Sese coal project in eastern  Botswana.<br /><br />The coal occurs in one main seam which averages 14  metres in thickness over an area of 110 square kilometres, and most  importantly is close to surface, which is expected to be amenable to low  strip‐ratio open pit mining.<br /><br />The main seam has been subdivided into an Upper and Lower seam on the basis of shale content.<br /><br />African Energy Resources is currently trading at $0.33 per share.</p>]]></description>
			<pubDate>Tue, 09 Aug 2011 05:31:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/31685/african-energy-resources-chairman-tops-up-shareholding-31685.html</guid>
		</item>
		<item>
			<title>African Energy Resources appoints general manager for southern African coal projects</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/31330/african-energy-resources-appoints-general-manager-for-southern-african-coal-projects-31330.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  has appointed the experienced David Scott as general manager of  projects, with Scott responsible for managing the development of the  company's coal projects in southern Africa.</p>
<p>Scott who is based in Botswana - has over two decades of experience with seven years at BHP Billiton (ASX: BHP).</p>
<p>Importantly Scott has experience in southern Africa, and most  recently held senior project management roles in the expansion project  at the Morupule Colliery in Botswana, currently the country&rsquo;s only  operating coal mine.</p>
<p>Scott will initially be responsible for delivering Feasibility Studies at the company's Sese coal project.</p>
<p>At Sese - earlier in the year African Energy reported and initial resource of 2.73 billion tonnes of thermal coal.</p>
<p>The coal occurs in one main seam which averages 14 metres in  thickness over an area of 110 square kilometres, and most importantly is  close to surface, which is expected to be amenable to low strip‐ratio  open pit mining.</p>
<p>The main seam has been subdivided into an Upper and Lower seam on the basis of shale content.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Mon, 01 Aug 2011 03:32:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/31330/african-energy-resources-appoints-general-manager-for-southern-african-coal-projects-31330.html</guid>
		</item>
		<item>
			<title>African Energy Resources raises A$15m to fast track Sese Coal Project in Botswana</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/30736/african-energy-resources-raises-a15m-to-fast-track-sese-coal-project-in-botswana-30736.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  has raised up to A$15 million through an oversubscribed placement of 30  million shares at A$0.50 per share to advance the Sese Coal Project in  Botswana, with a view to potential development in late 2012.<br /><br />The  placement to institutional and sophisticated investors from Asia, Europe  and Australia is testament to the quality of the Sese project and has  Helmsec Global Capital Limited acting as the lead manager. <br /><br />The  proceeds will be used  at Sese for infill drilling to Measured status,  trial pit and bulk samples, Feasibility Studies, an environmental impact  assessment, working capital and transaction costs.</p>
<p><strong><span style="font-size: 9pt;"></span></strong><span style="font-size: 9pt;"></span>Frazer  Tabeart,&nbsp; African Energy Resources' managing director, told Proactive  Investors today that the funds enable the company to "substantially  de-risk the project in the next 12 months through a trial pit which will  provide bulk samples to allow potential customers (export and  domestic/regional) to test the quality of the coal," as well as  demonstrate the company's commitment to the project and its development.<br /><br />The trial pit will also give African Energy the opportunity to assess export logistics in the region.<br /><br />By  continuing its resource drilling programs the company will progress  through an Indicated resource on the whole deposit to a Measured  resource for the area, which is likely to provide the first 25 years of  production.<br /><br />The company will commence the environmental impact  assessment shortly, which is likely to be a critical step on the path to  production.<br /><br />The full Feasibility Study to assess all technical  and commercial aspects of the project with a view to initial production  in 2013, is subject to the usual government regulatory hurdles.</p>
<p><br />Helmsec has an exclusive mandate to provide financial and related marketing advice over a 12 month period.<br /><br />In  May African Energy announced a better-than-expected initial gross  in-situ coal Resource at Sese of 2.73 billion tonnes, providing a boost  to the company as it looks to upgrade the entire Resource to an  Indicated category during the September quarter.<br /><br />The company  continues to unlock the potential for a much bigger coal resource in  Botswana, with the discovery of a thick coal seam at Sese West on June  8, located just a few kilometres to the south of the Sese coal project.</p>]]></description>
			<pubDate>Mon, 18 Jul 2011 02:49:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/30736/african-energy-resources-raises-a15m-to-fast-track-sese-coal-project-in-botswana-30736.html</guid>
		</item>
		<item>
			<title>African Energy Resources new coal seam discovery near 2.73Bt JORC Resource at Sese</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/29115/african-energy-resources-new-coal-seam-discovery-near-273bt-jorc-resource-at-sese-29115.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  continues to unlock the potential for a much bigger coal resource for  the company in Botswana, with the discovery of a thick coal seam at Sese  West.</p>
<p>Drilling at Sese West is part of a regional uranium exploration  program, although coal seams were discovered ranging in thickness from  seven metres to 30 metres, with the depth to the top of the coal varying  from 79 metres to 157 metres.</p>
<p>The new discoveries are located just a few kilometres to the south of  the Sese coal project, which hosts a JORC 2.73 billion tonne Resource.</p>
<p>However, Sese West is currently only valid for radioactive minerals,  with African Energy having already applied for amendment to the licence  to include the rights for coal.</p>
<p>The requested amendment is currently subject to the recently  announced moratorium on coal and coal bed methane licence applications,  which is due to end this September.</p>
<p>Highlighting how African Energy is looking to boost exploration in  the area, the company has submitted six further prospecting licence  applications for coal and coal bed methane in the last eight months.</p>
<p>The Sese coal project comprises one wholly owned prospecting licence  valid for uranium, coal, coal bed methane, base and precious metals, and  is strategically located near infrastructure with a sealed highway  between Francistown and Gaborone and is easily accessible.</p>
<p>Rail, road and power infrastructure is also close to the project.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Wed, 08 Jun 2011 01:56:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/29115/african-energy-resources-new-coal-seam-discovery-near-273bt-jorc-resource-at-sese-29115.html</guid>
		</item>
		<item>
			<title>African Energy Resources: Helmsec Global Securities places "Buy" recommendation </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/28706/african-energy-resources-helmsec-global-securities-places-buy-recommendation--28706.html</link>
			<description><![CDATA[<p>The following is an extract from a research report penned by Helmsec Global Securities on African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>). Helmsec has placed a "Speculative Buy" on the stock.<br /><br />African  Energy Resources discovered the Sese coal deposit in Botswana in mid  2010. Subsequent drilling has outlined a 2.7 billion tonne coal  resource.<br /><br /><strong>Company Data</strong><br /><br />Share Price: $0.82<br />Shares on Issue: 296 million<br />Options: 27 million<br />Market Cap: (fully diluted) $265 million<br />Cash: $44.6 million at end of March quarter<br />Debt: $5.0 million<br /><br /><strong>RECOMMENDATION: Speculative Buy</strong><br /><br />The  time to develop Botswana&rsquo;s massive coal deposits appears to have  arrived. The regional power network must be upgraded, coal qualities are  no longer a barrier to export markets, and export demand volumes will  soon justify the cost of rail and port if they have not already.<br /><br />Sese, by virtue of its size, thick seam, and shallow depth, is likely to become a lead player in Botswana&rsquo;s coal sector.<br /><br />Sese&rsquo;s  path to full development has many challenges and uncontrollable risks&ndash;  power station, rail and port developments are expensive and difficult to  muster.<br /><br />However the massive undeveloped coal resources of  Botswana and the Waterberg Basin are relatively cheap and convenient for  Indian buyers and international co-operation to get the infrastructure  built makes obvious sense.<br /><br />AFR is recommended on the premise that  the market&rsquo;s needs for Botswana coal will overcome the risks sooner  rather than later. As such, Helmsec initiates coverage with a  Speculative Buy recommendation.<br /><br /><strong>KEY POINTS</strong></p>
<p>- AFR&rsquo;s 2.7 billion tonne coal resource at Sese consists of a  singleseam up to 26 metres thick, all of it within 80 metres of  thesurface. The Sese resource has been defined over 30 km of strikeand  up to 10 km down dip.</p>
<p>- In the last few years power shortages in southern Africa and  theemergence of India as a major importer of thermal coal have  putBotswana in position to develop its massive coal resources for  thefirst time.</p>
<p>- Sese is potentially the largest coal project in Botswana and also potentially the lowest unit cost coal project in Botswana.</p>
<p>- Initial wash tests indicate Sese can potentially produce a  thermalcoal product suitable for export and a domestic power station  coal product.</p>
<p>- Sese is next to existing infrastructure that could support a small  to medium scale operation delivering coal to regional customers.</p>
<p>- The Botswana government, in partnership with neighbouring states,  various private interests and development banks, has advanced two rail  and port projects that would support Sese&rsquo;s full scale development.  Pending finance arrangements decisions to proceed with construction  could be made in 2011.</p>
<p><br /><strong>Enterprise Comparison</strong><br /><br />The use of enterprise value  comparisons to derive values is necessarily a broad brush method that  takes no account of disparate yields, coal qualities or unit costs. In  early 2011 the most commonly applied multiple was US$0.50 per tonne of  resource for undeveloped projects, based on transactions occurring over  the past year. For Sese such a multiple would imply a US$1.3 billion  project value.<br /><br />With an enterprise value of A$0.10 per resource  tonne based on a resource of 2.7 billion tonnes, African Energy is  valued far less than most of its peers: <br /><br />African Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) $0.10<br />Aspire Mining (ASX: AKM) A$1.83<br />Bandanna (ASX: BND) A$1.33<br />Nucoal Resources (ASX: NCR) A$0.45 and <br />Coal of Africa (ASX: CZA) $0.44</p>]]></description>
			<pubDate>Fri, 27 May 2011 04:16:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/28706/african-energy-resources-helmsec-global-securities-places-buy-recommendation--28706.html</guid>
		</item>
		<item>
			<title>African Energy Resources inks 2.73Bt maiden JORC Resource at Sese coal project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/28387/african-energy-resources-inks-273bt-maiden-jorc-resource-at-sese-coal-project-28387.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank"><a href="/companies/overview/9150/african-energy-resources-9150.html">ASX:AFR</a></a>)  has achieved an initial gross in-situ JORC Resource of 2.73 billion  tonnes at its Sese coal project in Botswana, and is now looking to  upgrade to the Indicated Resource category.<br /><br />The  better-than-expected resource provides a boost for the company, which  also recently increased African exposure with the 100% acquisition of  two uranium based projects in Zambia.<br /><br />The Resource estimation was supervised by senior consultants at Coffey Mining.<br /><br />Significantly,  the coal occurs in one main seam which averages 14 metres thickness, is  close to surface and is expected to be amenable to low strip‐ratio open  pit mining.</p>
<p>Block‐B has been classified as an Indicated Resource containing 500  million tonnes (Mt) coal. Block‐A and Block‐C (2,230 Mt) are classified  as Inferred Resources.<br /><br />The Lower Main Seam accounts for 62% of  the total resource and contains coal which is suitable for washing to  create an export quality product (up to 5,420 Kcal/kg).<br /><br />The Upper  Main Seam coal can be washed, or blended with the Lower Main Seam  middlings to make a product which is suitable for use as power station  fuel.<br /><br />The Sese Coal project comprises one wholly owned  prospecting licence (PL96/2005) and six prospecting licence applications  located in northeast Botswana, about 50 kilometres southwest of the  town of Francistown.<br /><br />African Energy discovered the large deposit of thermal coal at Sese in June 2010. <br /><br />Importantly,  the project is close to the sealed highway between Francistown and  Gaborone and is easily accessible. Rail, road and power infrastructure  is also close to the project.<br /><br />Infill drilling is currently  underway, and the company expects to upgrade the entire resource to an  Indicated Resource category during the July‐September quarter.<br /><br />On  March 8 African Energy acquired two uranium based projects in Zambia.  The two projects, Chirundu Uranium and Kariba Valley, were initially  part of a joint venture with Albidon (ASX: ALB).<br /><br />African Energy  is funding the acquisition from existing cash reserves, with working  capital funded by a partial drawdown of the $5 million convertible loan  facility with Macquarie Bank (ASX: MQG).<br /><br />The company is looking  to move the acquisitions forward quickly, and is evaluating a number of  additional exploration targets at Chirundu and Kariba Valley tenements  with the aim of boosting the resource.<br /></p>]]></description>
			<pubDate>Thu, 19 May 2011 02:30:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/28387/african-energy-resources-inks-273bt-maiden-jorc-resource-at-sese-coal-project-28387.html</guid>
		</item>
		<item>
			<title>African Energy Resources poised for highly anticipated initial resource at Sese</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/28132/african-energy-resources-poised-for-highly-anticipated-initial-resource-at-sese-28132.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank"><a href="/companies/overview/9150/african-energy-resources-9150.html">ASX:AFR</a></a>)  has handed all the analytical data for the&nbsp;Sese coal project in  Botswana to independent resource consultants, with the highly  anticipated initial resource estimate expected soon.</p>
<p>African Energy did have a slight delay in receiving some results from  South Africa, but this actually was a plus and allowed the  incorporation of information from the recently completed infill drilling  in Block‐B into the resource model.</p>
<p>At Block-B, eleven reverse circulation and 15 diamond drill holes  were completed earlier in the year, across an area of around 21 square  kilometres.</p>
<p>The average seam thickness in Block-B was 14.8 metres, with an average depth to the top of this seam of 40 metres.</p>
<p>The company said this may permit the classification of an Indicated  Resource for this part of the deposit, with Block‐A and Block‐C likely  to be classified as an Inferred Resource.</p>
<p>This initial resource will provide a boost for the company, which  also recently increased African exposure with the 100% acquisition of  two uranium based projects in Zambia.</p>
<p>The two projects, Chirundu Uranium and Kariba Valley, were initially part of a joint venture with Albidon (ASX: ALB).</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Thu, 12 May 2011 04:06:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/28132/african-energy-resources-poised-for-highly-anticipated-initial-resource-at-sese-28132.html</guid>
		</item>
		<item>
			<title>African Energy Resources appoints Philip Clark as director</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/27072/african-energy-resources-appoints-philip-clark-as-director-27072.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) has appointed Philip Clark as a non-executive director, effective immediately.</p>
<p>Clark has most recently been providing general consulting services to  the company, specifically focusing on a Concept Study on development  options for the Sese coal deposit in Botswana.</p>
<p>Sese has delivered bumper results recently, and last month results  showed the potential for Block-A, Block-B and Block-C to form a 110  square kilometre continuous coal seam.</p>
<p>African Energy is forecast to deliver an initial Inferred Resource in April 2011.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Tue, 05 Apr 2011 08:03:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/27072/african-energy-resources-appoints-philip-clark-as-director-27072.html</guid>
		</item>
		<item>
			<title>African Energy Resources' Botswana coal tenement applications remain on track</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/26866/african-energy-resources-botswana-coal-tenement-applications-remain-on-track-26866.html</link>
			<description><![CDATA[<p>African Energy Resources (ASX: AFR)   has been informed that the Government of Botswana has engaged   consultants to formulate a development strategy for coal resources in   the southern African country.<br /><br />The company received the   notification from the Ministry of Minerals, Energy and Water Resources.   The review will commence immediately and is expected to take six months   with completion planned by September 2011.</p>
<p>As part of the process, the government will suspend the granting of   new prospecting licences for coal and associated minerals (coal bed   methane and sediment‐hosted uranium) until completion of the review   period.</p>
<p>&nbsp;</p>
<p>African Energy has six applications for new tenements surrounding the   granted prospecting licence (PL96/2005) which hosts the Sese coal   deposit. These six new tenement applications will be subject to the   moratorium on grants during the review. <br /><br />The company welcomes the   review and the efforts to optimise government involvement in the   industry especially in the areas of infrastructure development and   offers its cooperation and assistance.<br /><br />African Energy is   confident these applications will be processed as expected, once the   moratorium as been lifted, as the Ministry has assured the company that   the review has no impact on granted tenements, which includes Sese.<br /><br />On   March 7 African Energy secured funding for more advanced exploration  at  Sese, with a US$5 million convertible loan facility with powerhouse   investment bank Macquarie Bank (ASX: MQG).<br /><br />African Energy has  had  a string of stellar drilling results from Sese, and recently  identified  the average seam thickness in Block-B to be 15 metres, with  easy  extraction due to being near surface, with an average depth to the  top  of the seam just 38 metres.<br /><br />Infill drilling is continuing  toward  the objective of defining an indicated resource and preparations  have  commenced for a trial pit to extract a 10,000t bulk sample later  around  the middle of the year.<br /><br />The company expects to release its initial Inferred Resource estimate at Sese in late April.</p>]]></description>
			<pubDate>Wed, 30 Mar 2011 18:35:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/26866/african-energy-resources-botswana-coal-tenement-applications-remain-on-track-26866.html</guid>
		</item>
		<item>
			<title>African Energy Resources' Botswana coal tenement applications remain on track </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/26594/african-energy-resources-botswana-coal-tenement-applications-remain-on-track--26594.html</link>
			<description><![CDATA[<p>African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>)  has been informed that the Government of Botswana has engaged  consultants to formulate a development strategy for coal resources in  the southern African country.<br /><br />The company received the  notification from the Ministry of Minerals, Energy and Water Resources.  The review will commence immediately and is expected to take six months  with completion planned by September 2011.</p>
<p>As part of the process, the government will suspend the granting of  new prospecting licences for coal and associated minerals (coal bed  methane and sediment‐hosted uranium) until completion of the review  period.</p>
<p>&nbsp;</p>
<p>African Energy has six applications for new tenements surrounding the  granted prospecting licence (PL96/2005) which hosts the Sese coal  deposit. These six new tenement applications will be subject to the  moratorium on grants during the review. <br /><br />The company welcomes the  review and the efforts to optimise government involvement in the  industry especially in the areas of infrastructure development and  offers its cooperation and assistance.<br /><br />African Energy is  confident these applications will be processed as expected, once the  moratorium as been lifted, as the Ministry has assured the company that  the review has no impact on granted tenements, which includes Sese.<br /><br />On  March 7 African Energy secured funding for more advanced exploration at  Sese, with a US$5 million convertible loan facility with powerhouse  investment bank Macquarie Bank (ASX: MQG).<br /><br />African Energy has had  a string of stellar drilling results from Sese, and recently identified  the average seam thickness in Block-B to be 15 metres, with easy  extraction due to being near surface, with an average depth to the top  of the seam just 38 metres.<br /><br />Infill drilling is continuing toward  the objective of defining an indicated resource and preparations have  commenced for a trial pit to extract a 10,000t bulk sample later around  the middle of the year.<br /><br />The company expects to release its initial Inferred Resource estimate at Sese in late April.</p>]]></description>
			<pubDate>Wed, 23 Mar 2011 00:31:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/26594/african-energy-resources-botswana-coal-tenement-applications-remain-on-track--26594.html</guid>
		</item>
		<item>
			<title>African Energy Resources 110km2 continuous coal seam at Sese</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/25777/african-energy-resources-110km2-continuous-coal-seam-at-sese-25777.html</link>
			<description><![CDATA[<p>Investors have been eagerly anticipating drilling results from the African Energy Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/1490/african-energy-resources-1490.html" target="_blank">ASX: AFR</a>) Block-B at the Sese coal project in Botswana, and the company delivered.</p>
<p>African Energy has identified the average seam thickness in Block-B  to be 15 metres, with easy extraction due to being near surface, with an  average depth to the top of the seam just 38 metres.</p>
<p>The company said the shallow depth of the overburden and the  thickness of the coal seam are very encouraging, offering very low strip  ratios at potential sites for initial mining operations.</p>
<p>More importantly what this drilling actually identifies, along with  drilling results from Block-A and Block-C, is a continuous coal seam  over an area of 110 square kilometres.</p>
<p>These results could be just the beginning for Block-B as drilling will continue to the end of the month.</p>
<p>African Energy is forecast to deliver an initial Inferred Resource in April 2011.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Wed, 23 Feb 2011 01:14:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/25777/african-energy-resources-110km2-continuous-coal-seam-at-sese-25777.html</guid>
		</item>
		<item>
			<title>African Energy Resources responds to ASX continuous disclosure query </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/24033/african-energy-resources-responds-to-asx-continuous-disclosure-query--24033.html</link>
			<description><![CDATA[<p>African Energy Resources (ASX:AFR) has responded to an ASX continuous disclosure query.</p>
<p>African Energy responded to the following from the ASX:</p>
<p>'I refer to your letter of 14 December 2010 and with regard to the  company's announcement released at 09:18 (EDST) on 14 December 2010  titled "Block-C Coal Drilling Results Exceeds Expectations".</p>
<p>African Energy then stated:</p>
<p>'The company considers the information contained in the announcement  to be material to the company pursuant to listing rule 3.1.'</p>
<p>'The managing director, Dr Frazer Tabeart, received details of the  drilling results published in the announcement via email at 01:54 (WST)  on Monday 13 December 2010.'</p>
<p>'There was no earlier announcement from the company relating to new information contained in the announcement.'</p>
<p>'The board and management spent 24 hours compiling the drilling  information and preparing the announcement suitable for release to the  market pre-open on Tuesday 14 December 2010. Drilling results remained  confidential until the release was made.'</p>
<p>'The company confirms it is in compliance with the listing rules, in particular listing rule 3.1.'</p>
<p>The announcement refers to results from Block-C at the Sese coal  project in Botswana, where the average main coal seam thickness is 11  metres, with an average depth to the top of this seam of 52 metres,  which the company says 'significantly exceeds previous expectations'.</p>
<p>Drilling at the target will be completed next week, with 43 reverse  circulation and 25 diamond core holes already completed, covering around  70 square kilometres.</p>
<p>The initial inferred resource will be towards the end of the first quarter in 2011.</p>
<p>The exploration target at Sese is 1.0 to 1.5 billion tonnes of 4,000kcal/kg to 5,000kcal/kg thermal coal.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Wed, 15 Dec 2010 10:05:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/24033/african-energy-resources-responds-to-asx-continuous-disclosure-query--24033.html</guid>
		</item>
		<item>
			<title>African Energy Resources continues to hit thick near surface coal at Sese</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/23988/african-energy-resources-continues-to-hit-thick-near-surface-coal-at-sese-23988.html</link>
			<description><![CDATA[<p>Resource delineation drilling is exceeding company expectations in  Block-C at the African Energy Resources (ASX: AFR) Sese coal project,  with continued near surface hits of coal seams over a large area.</p>
<p>In Block-C, the average main seam thickness is 11 metres, with an  average depth to the top of this seam of 52 metres, which the company  says significantly exceeds previous expectations.</p>
<p>Drilling at the target will be completed next week, with 43 reverse  circulation and 25 diamond core holes already completed, covering around  70 square kilometres.</p>
<p>The initial inferred resource will be towards the end of the first quarter in 2011.</p>
<p>The exploration target at Sese is 1.0 to 1.5 billion tonnes of 4,000kcal/kg to 5,000kcal/kg thermal coal.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Tue, 14 Dec 2010 14:07:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/23988/african-energy-resources-continues-to-hit-thick-near-surface-coal-at-sese-23988.html</guid>
		</item>
	</channel>
</rss>

