<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>Proactiveinvestors United Kingdom </title>
	<link>http://www.proactiveinvestors.co.uk</link>
	<description>Proactiveinvestors United Kingdom  RSS feed
            </description>
	<language>en</language>
	<pubDate>Thu, 24 May 2012 23:23:01 +0100</pubDate>
	<docs>http://blogs.law.harvard.edu/tech/rss</docs>
	<generator>Genera CMS</generator>
	<managingEditor>action@proactiveinvestors.com (Proactiveinvestors)</managingEditor>
	<webMaster>action@proactiveinvestors.com (Proactiveinvestors)</webMaster>
	<atom:link href="http://www.proactiveinvestors.co.uk/companies/dedicated_rss/8962/toro-energy--8962.xml" rel="self" type="application/rss+xml" />
		<item>
			<title>Toro Energy in pre open pending approval for first WA uranium mine</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/43046/toro-energy-in-pre-open-pending-approval-for-first-wa-uranium-mine-43046.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.com.au/companies/overview/252/Toro+Energy" class="companyPopupTrigger" rel="252">Toro Energy</a><span style="text-align: justify;">&nbsp;(</span><a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a><span style="text-align: justify;">) has been granted a trading halt by the ASX ahead of a recommendation from the Western Australian Environmental Protection Authority (WEPA) regarding the company&rsquo;s proposal to construct the first uranium mine in the state.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">WEPA will announce its recommendation to the Western Australian Minister for Environment at 10am Western Standard Time today.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Toro is seeking government approvals for a project based on the Centipede and Lake Way deposits, within the Wiluna Uranium Project.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">The company is on track to achieve first production from the Wiluna Uranium Project by the end of 2013, with first uranium cells by 2014.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Centipede is Toro&rsquo;s first target for mining at Wiluna, hosting a JORC Resource of 12.9 million tonnes at 504 parts per million (ppm) uranium at a cut-off grade of 200ppm for 14.4 million pounds of contained uranium.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Importantly, this resource could be enough to allow Toro to mine Centipede as a stand-alone operation, deferring capital expenditure on the development of Lake Way.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Toro shares will remain in pre open until the earlier of the release of an announcement to the market or the commencement of normal trading on Wednesday May 23.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><br style="text-align: justify;" /><strong style="text-align: justify;"><br />Proactive Investors is a market leader in the investment news space, providing ASX &ldquo;Small and Mid-cap&rdquo; company news, research reports, StockTube videos and One2One Investor Forums.</strong></p> ]]></description>
			<pubDate>Mon, 21 May 2012 06:24:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/43046/toro-energy-in-pre-open-pending-approval-for-first-wa-uranium-mine-43046.html</guid>
		</item>
		<item>
			<title>Toro Energy: Environmental approval recommended for Wiluna Uranium Project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/43045/toro-energy-environmental-approval-recommended-for-wiluna-uranium-project-43045.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.com.au/companies/overview/252/Toro+Energy" class="companyPopupTrigger" rel="252">Toro Energy</a><span style="text-align: justify;">&nbsp;(</span><a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a><span style="text-align: justify;">) has been granted a trading halt by the ASX ahead of a recommendation from the Western Australian Environmental Protection Authority (WEPA) regarding the company&rsquo;s proposal to construct the first uranium mine in the state.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">WEPA will announce its recommendation to the Western Australian Minister for Environment at 10am Western Standard Time today.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Toro is seeking government approvals for a project based on the Centipede and Lake Way deposits, within the Wiluna Uranium Project.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">The company is on track to achieve first production from the Wiluna Uranium Project by the end of 2013, with first uranium cells by 2014.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Centipede is Toro&rsquo;s first target for mining at Wiluna, hosting a JORC Resource of 12.9 million tonnes at 504 parts per million (ppm) uranium at a cut-off grade of 200ppm for 14.4 million pounds of contained uranium.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Importantly, this resource could be enough to allow Toro to mine Centipede as a stand-alone operation, deferring capital expenditure on the development of Lake Way.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><span style="text-align: justify;">Toro shares will remain in pre open until the earlier of the release of an announcement to the market or the commencement of normal trading on Wednesday May 23.</span><br style="text-align: justify;" /><br style="text-align: justify;" /><br style="text-align: justify;" /><strong style="text-align: justify;"><br />Proactive Investors is a market leader in the investment news space, providing ASX &ldquo;Small and Mid-cap&rdquo; company news, research reports, StockTube videos and One2One Investor Forums.</strong></p> ]]></description>
			<pubDate>Mon, 21 May 2012 05:43:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/43045/toro-energy-environmental-approval-recommended-for-wiluna-uranium-project-43045.html</guid>
		</item>
		<item>
			<title>Toro Energy excites with uranium drill results at Theseus</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/42865/toro-energy-excites-with-uranium-drill-results-at-theseus-42865.html</link>
			<description><![CDATA[<p>
<p>Emerging uranium producer,&nbsp;<a href="http://www.proactiveinvestors.com.au/companies/overview/252/Toro+Energy" class="companyPopupTrigger" rel="252">Toro Energy</a>&nbsp;(<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX:TOE</a>) has been provided significant encouragement from first 2012 drill results from its principal exploration asset, Theseus in Western Australia.<br /><br />Theseus had a Exploration Target Range of 20 - 40 million tonnes (22 million - 44 million pounds uranium) at 400 - 500 ppm uranium.</p>
<p>Drilling commenced on 1 May 2012 in the southern part of the Theseus Project area.<br /><br />Today's results, using a Prompt Fission Neutron Tool (PFN) downhole logging tool showed that 14 of the 20 holes drilled so far reported mineralised intervals greater than 200ppm pU3O8, would place Toro on the way to achieving this target.<br /><br />Peak results were over 0.6% pU3O8, with consistent widths and grades using a 200 parts per million (ppm) pU3O8 cut off.<br /><br />The results included:</p>
<p><br /><br />- 3.77m at 717ppm uranium from 111.73m including 0.91m at 2105ppm uranium<br />- 2.54m at 646ppm uranium from 110.53m including 0.55m at 2336ppm uranium<br />- 2.05m at 566ppm uranium from 118.15m including 0.55m at 1541ppm uranium<br />- 10.7m at 275ppm uranium from 124.24m including 0.74m at 748ppm uranium<br /><br />The results have also confirmed Toro&rsquo;s geological model for the southern area of the Theseus Project.&nbsp;<br /><br />These results would justifiably provide Toro with confidence in the grade and tonnes of the Exploration Target Range (ETR) for the remaining area of Theseus Project still to be drilled.&nbsp;<br /><br />Three mineralised zones have been intersected to date, the first around 70 metres below surface, with the main zone starting at around ~110-112 metres and now a third zone at 120 metres. In drillhole LM0090, the two lower zones coalesce and report 10.74 metres at 275ppm pU3O8 from 112.9 metres.<br /><br />Toro managing director Greg Hall said: &ldquo;It is exciting to see the first drill results of 2012 confirming the uranium potential in the southern part of the Theseus Project.&nbsp;<br /><br />It is also pleasing to see consistent widths and grades with the possibility of exploitable ISR uranium mineralisation.&rdquo;<br /><br /><br /><strong>Analysis</strong><br /><br />Today's drill results included high grade as well as significant widths at Theseus and puts the company on the road to achieving its exploration target range of 22 million - 44 million pounds uranium at the project.<br /><br />This is in addition to Toro's flagship 54 million pound Wiluna uranium project (total regional resource) in Central Western Australia, where Toro has advanced the approvals process with an anticipated date of mid-2012, construction through 2013 and first uranium sales in 2014.<br /><br />Timing wise, Wiluna's development timeline could suit European and US utilities which are known to be eyeing long-term uranium supply contracts - post Fukushima. Toro could be the first post-ban uranium miner in Western Australia to market and next uranium mine in Australia to production. Toro could also be one of the few uranium producers in the world capable of production in the critical 2014-15 period.<br /><br />Taken together, and on an EV/uranium resource peer basis this provides a solid long term case for&nbsp;<a href="http://www.proactiveinvestors.com.au/companies/overview/252/Toro+Energy" class="companyPopupTrigger" rel="252">Toro Energy</a>.<br /><br /><strong><br />Proactive Investors is a market leader in the investment news space, providing ASX &ldquo;Small and Mid-cap&rdquo; company news, research reports, StockTube videos and One2One Investor Forums.</strong></p>
</p> ]]></description>
			<pubDate>Wed, 16 May 2012 02:33:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/42865/toro-energy-excites-with-uranium-drill-results-at-theseus-42865.html</guid>
		</item>
		<item>
			<title>Toro Energy to commence much anticipated drill campaign</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/42171/toro-energy-to-commence-much-anticipated-drill-campaign-42171.html</link>
			<description><![CDATA[<p>
<p><a href="http://www.proactiveinvestors.com.au/companies/overview/252/Toro+Energy" class="companyPopupTrigger" rel="252">Toro Energy</a>&nbsp;(<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has begun the eagerly awaited 2012 drilling program at its Theseus Uranium Project targeting a conversion of a sizeable amount of its exploration target to an Inferred Resource.&nbsp;<br /><br />Indicating the size potential of the project, Toro has defined an exploration target of 20 to 40 million tonnes at 400 to 500 parts per million for 22 to 44 million pounds of uranium.<br /><br />A mud rotary rig will begin the initial program of about 20,000 metres.&nbsp;<br /><br />The main zone of mineralisation covers an area about 6 kilometres long by up to 1.5 kilometres wide.&nbsp;<br /><br />This zone is open to the northwest and southeast and a second zone, about 2 kilometres long by 0.5 kilometres wide, is open to the east.<br /><br />Greg Hall, managing director said: &ldquo;It is very good news for Toro to be able to start this drilling program early in the season.&nbsp;<br /><br />&ldquo;Toro believes there is an excellent chance to convert the exploration target range estimate to an Inferred Resource over the next few months.&nbsp;<br /><br />&ldquo;We are looking forward to further positive news from Theseus, especially after the highly successful extraction tests improve the probability of an ISR project.&rdquo;&nbsp;<br /><br />Toro has achieved high rates of extraction of greater than 96% in the first uranium extraction tests for the Theseus Project.&nbsp;<br /><br />The extraction process was quick, with the majority of leaching occurring within the first 12 hours.<br /><br />The results demonstrate good metallurgical characteristics for the Theseus Project at this early stage of the project.<br /><br /><br /><strong>Theseus potential&nbsp;</strong><br /><br />Theseus was discovered by Toro during a grassroots regional aircore drilling program in 2009.&nbsp;<br /><br />Initial results highlighted the potential for sandstone hosted uranium mineralisation at the project.&nbsp;<br /><br />A total of 130 vertical mud rotary and aircore holes have been drilled and downhole gamma logged, with almost 50% of the holes reporting a gamma, assay or PFN result greater than 0.5 metres at 100 parts per million uranium.&nbsp;<br /><br />Given the high quality and speed of uranium extraction, it is likely that the mineralisation at Theseus consists primarily of uraninite and coffinite, which is easily extractable.<br /><br />Importantly, this is comparable to the preliminary recoveries from other Australian in-situ recovery type deposits.<br /><br /><strong><br />Post-Fukushima turnaround</strong><br /><br />Toro is one of a handful of miners, including&nbsp;<strong><a href="http://www.proactiveinvestors.com.au/companies/overview/203/BHP+Billiton" class="companyPopupTrigger" rel="203">BHP Billiton</a>&nbsp;(ASX: BHP)</strong>, that wasted no time in exploiting Western Australia&rsquo;s uranium potential following the lifting of the State Government&rsquo;s ban on uranium mining in 2008.&nbsp;<br /><br />The company is buoyed by a potential turnaround in the post-Fukushima uranium market with European and US utilities eyeing long-term uranium supply contracts as well as continued Japanese demand.<br /><br />Toro is well placed to become the first post-ban uranium miner in Western Australia if its Wiluna project progresses quickly through the final phase of government approvals.</p>
<p>&nbsp;</p>
<p><strong>Proactive Investors is a market leader in the investment news space, providing ASX &ldquo;Small and Mid-cap&rdquo; company news, research reports, StockTube videos and One2One Investor Forums.</strong></p>
</p> ]]></description>
			<pubDate>Tue, 01 May 2012 02:08:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/42171/toro-energy-to-commence-much-anticipated-drill-campaign-42171.html</guid>
		</item>
		<item>
			<title>Toro Energy cements Browns Range JV with Northern Minerals </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/41839/toro-energy-cements-browns-range-jv-with-northern-minerals--41839.html</link>
			<description><![CDATA[<p>
<p><br /><a href="http://www.proactiveinvestors.com.au/companies/overview/252/Toro+Energy" class="companyPopupTrigger" rel="252">Toro Energy</a>&nbsp;(<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) plans to farm-out up to 80% of all the mineral rights, except uranium, within its Browns Range tenements in the Northern Territory under a joint venture agreement with<strong>&nbsp;<a href="http://www.proactiveinvestors.com.au/companies/overview/1919/Northern+Minerals" class="companyPopupTrigger" rel="1919">Northern Minerals</a>&nbsp;(ASX: NTU)</strong>.<br /><br />The two companies have completed due diligence and as a result have now formalised the joint venture partnership.&nbsp;&nbsp;<br /><br />The agreement allows for Northern to explore for non-uranium minerals on seven of Toro&rsquo;s wholly owned tenements in the Tanami region of the Northern Territory.<br /><br />Northern intends to focus on heavy rare earth elements as part of its Browns Range project while Toro retains 100% of all uranium rights throughout the joint venture.</p>
<p><br /><strong>JV Terms&nbsp;</strong><br /><br />- The agreement allows Northern to earn up to an 80% interest in non-uranium minerals in the tenements over a five year period in various stages;<br />- In the first stage, Northern has agreed to spend $4 million on exploration over the first three years to earn a 51% interest;<br />- In the second stage, Northern has the option to increase its interest to 70% by spending an additional $2 million over the following two years; and<br />- Finally, Northern has the option to complete a Bankable or Definitive Feasibility Study and lift its equity position in non-uranium minerals to 80% if Toro chooses not to contribute.<br /><strong></strong></p>
<p><strong><br />Browns Range</strong><br /><br />Toro&rsquo;s tenements lie around the southern margin of the Browns Range Dome and, in particular, have substantial potential for unconformity style uranium.<br /><br />Highlighting the prospectivity of the area, the single previous explorer, Japanese company PNC, identified a 20 kilometre long belt of geology that is directly analogous with that of the Alligator River Uranium Field, which hosts the Ranger and Jabiluka uranium deposits.<br /><br />PNC created a sizable dataset that will enable Toro to fast-track its own uranium exploration in the area, which will also assist in the exploration for other commodities by the joint venture partners.</p>
<p>&nbsp;</p>
<p>&nbsp;<br /><strong>Proactive Investors is a market leader in the investment news space, providing ASX &ldquo;Small and Mid-cap&rdquo; company news, research reports, StockTube videos and One2One Investor Forums.</strong></p>
</p> ]]></description>
			<pubDate>Tue, 24 Apr 2012 00:27:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/41839/toro-energy-cements-browns-range-jv-with-northern-minerals--41839.html</guid>
		</item>
		<item>
			<title>Toro Energy cashed up to advance Wiluna Uranium project to production in 2013</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/40333/toro-energy-cashed-up-to-advance-wiluna-uranium-project-to-production-in-2013-40333.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) plans to progress the advanced stage Wiluna Uranium project towards production in Western Australia after raising A$5.3 million in a Share Purchase Plan.<br /><br />This brings the company&rsquo;s expected cash position to about $16.3 million for the end of March.<br /><br />Greg Hall, managing director of Toro, told Proactive Investors today that the company was well funded to progress Wiluna.<br /><br />&ldquo;That&rsquo;s an approximate figure, and funding of the Wiluna project will be separate to that,&rdquo; Hall said, &ldquo;but the funds we have now are sufficient to progress Wiluna&rdquo;.<br /><br />Toro is on track to achieve first production from Wiluna by the end of 2013, with first uranium cells by 2014.<br /><br />Hall told Proactive Investors that Toro is just waiting on state and federal government approvals for the project.<br /><br />&ldquo;Wiluna is in the final stages of the process and we are waiting on government approvals to be able to mine,&rdquo; Hall said.<br /><br />&ldquo;We anticipate a decision on this mid this year.&rdquo;<br /><br />The company recently announced a Resource Upgrade at Wiluna following infill drilling and bulk density analysis at the key Centipede deposit.<br /><br />Centipede is Toro&rsquo;s first target for mining at Wiluna, and now hosts a Resource of 12.9 million tonnes at 504 parts per million (ppm) uranium at a cut-off grade of 200ppm for 14.4 million pounds of contained uranium.<br /><br />This is a 17% increase in contained metal at Centipede, and increases the total Wiluna regional Resource base to 53.6 million pounds of uranium, based on 55.1 million tonnes at 440ppm with a 200ppm cut-off.<br /><br /><strong>Share purchase plan</strong><br /><br />The share purchase plan offered shareholders the opportunity to purchase up to A$15,000 worth of shares at an issue price of A$0.08 per share.<br /><br />This price was a hefty discount to the company&rsquo;s last closing price prior to announcing the deal of A$0.10.<br /><br /><strong>Theseus progress</strong><br /><br />Funds from the raising will also be put towards drilling and project advancement at the Theseus Uranium Project, also in Western Australia, with the aim of establishing a JORC Resource this year.<br /><br />The company recently completed the first uranium extraction tests at Theseus, achieving extractions of 95.5% and 96.4% with very low acid consumption. <br /><br />Given the high quality and speed of uranium extraction, it is likely that the mineralisation at Theseus consists primarily of uraninite and coffinite, which is easily extractable.<br /><br />This is comparable to the preliminary recoveries from other Australian in-situ recovery type deposits.</p> ]]></description>
			<pubDate>Fri, 16 Mar 2012 01:47:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/40333/toro-energy-cashed-up-to-advance-wiluna-uranium-project-to-production-in-2013-40333.html</guid>
		</item>
		<item>
			<title>Toro Energy achieves greater than 96% uranium recovery rates from Theseus</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/39564/toro-energy-achieves-greater-than-96-uranium-recovery-rates-from-theseus-39564.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has achieved high rates of extraction in the first uranium extraction tests for the Theseus Project as the company works towards an initial resource statement.<br /><br />Theseus is <a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a>&rsquo;s principal exploration asset, with an exploration target range of between 22 million pounds and 44 million pound uranium, with significant upside.<br /><br />Results from the initial extraction tests showed extractions of 95.5% and 96.4% with very low acid consumption.<br /><br />The extraction process was quick, with the majority of leaching occurring within the first 12 hours.<br /><br />Managing director Greg Hall said the result boded well for Theseus, where Toro is targeting a JORC Resource in the September quarter.<br /><br />&ldquo;These initial uranium extraction tests are extremely encouraging and demonstrate good metallurgical characteristics for the Theseus Project at this early stage of the project,&rdquo; Hall said.<br /><br />&ldquo;The Theseus Project continues to achieve milestones on a path towards an initial resource statement in the third quarter of 2012.&rdquo;<br /><br />Given the high quality and speed of uranium extraction, it is likely that the mineralisation at Theseus consists primarily of uraninite and coffinite, which is easily extractable.<br /><br />Importantly, this is comparable to the preliminary recoveries from other Australian in-situ recovery type deposits.<br /><br />Toro intends to carry out further studies to examine the nature of the uranium mineral speciation.<br /><br /><strong>Well funded</strong><br /><br />At the end of the December quarter 2011, Toro had $10.5 million in cash reserves.<br /><br />The company also has a share purchase plan underway with the aim of raising a further $10.5 million.<br /><br />Toro is offering shareholders the opportunity to purchase up to A$15,000 worth of shares at an issue price of A$0.08 per share, a hefty discount to the company&rsquo;s last closing price prior to announcing the deal of A$0.10.<br /><br />In addition, the company is waiting on a $3.75 million payment from OZ Minerals (ASX: OZL). <br /><br />The payment is consideration for the termination of an agreement between the two companies as previously applied to the Mt Woods uranium project.<br /><br />Earlier this month, Toro shareholders voted to accept the terms of a termination agreement for the company&rsquo;s involvement in the Mount Woods uranium project in South Australia.</p> ]]></description>
			<pubDate>Wed, 29 Feb 2012 01:52:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/39564/toro-energy-achieves-greater-than-96-uranium-recovery-rates-from-theseus-39564.html</guid>
		</item>
		<item>
			<title>Toro Energy upgrades Wiluna Uranium Resource, on track for production in 2013</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/39425/toro-energy-upgrades-wiluna-uranium-resource-on-track-for-production-in-2013-39425.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has upgraded the Resource Base at the Wiluna Uranium Project following infill drilling and bulk density analysis at the key Centipede deposit.<br /><br />Centipede is Toro&rsquo;s first target for mining at Wiluna, and now hosts a Resource of 12.9 million tonnes at 504 parts per million (ppm) uranium at a cut-off grade of 200ppm for 14.4 million pounds of contained uranium.<br /><br />This is a 17% increase in contained metal at Centipede, and increases the total Wiluna regional Resource base to 53.6 million pounds of uranium, based on 55.1 million tonnes at 440ppm with a 200ppm cut-off.<br /><br />Toro business development manager Simon Mitchell told Proactive Investors today that the company is on track to achieve first production from Wiluna by the end of 2013, with first uranium cells by 2014.<br /><br />The company is seeking government approvals for a project based on the Centipede and Lake Way deposits, which is expected in mid-2012.<br /><br />&ldquo;All eyes are on getting the approval and making sure that we&rsquo;re on top of things once we&rsquo;ve got the approval from the government,&rdquo; Mitchell said.<br /><br />Significantly, the increase in the Centipede Resource will increase the amount of higher grade material that will be available in the early stages of the project&rsquo;s operation.<br /><br />Mitchell told Proactive Investors today that the new Resource could be enough to allow Toro to mine Centipede as a stand-alone operation, deferring capital expenditure on the development of Lake Way.<br /><br />In addition, he said Toro would be conducting exploration work at other deposits within Wiluna, aiming to delineate further Resource upgrades.<br /><br />&ldquo;We can&rsquo;t of course predict or suggest that we&rsquo;ll get the same kind of result at the other ones when we do the same studies, but obviously we&rsquo;re going to be looking at that pretty carefully to see if we can improve Lake Way, for example, in the same way we&rsquo;ve just improved Centipede,&rdquo; he said.<br /><br />Over the next six months, Toro is expecting to release a number of milestones, with a Definitive Feasibility Study on track for the September quarter.<br /><strong><br />Cashed up</strong><br /><br />Toro had $10.5 million in cash reserves at the end of the December quarter.<br /><br /><strong>Toro buoyed by revised Opposition uranium policy </strong><br /><br />In late January Western Australian Opposition Leader Mark McGowan announced that he would allow uranium mines already approved by the current Liberal Government to proceed if Labor gains power in the next election.<br /><br />This was an important move for Toro, with the government decision for Wiluna expected by mid-2012, long before Western Australia&rsquo;s next election.</p> ]]></description>
			<pubDate>Mon, 27 Feb 2012 00:54:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/39425/toro-energy-upgrades-wiluna-uranium-resource-on-track-for-production-in-2013-39425.html</guid>
		</item>
		<item>
			<title>Toro Energy’s Namibian interests progress with renewal of exploration licences</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/39213/toro-energys-namibian-interests-progress-with-renewal-of-exploration-licences-39213.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) holds a 25% interest in <a href="http://www.proactiveinvestors.co.uk/companies/overview/2451/Deep+Yellow" class="companyPopupTrigger" rel="2451">Deep Yellow</a>&rsquo;s (ASX: DYL) 65% owned Namibian subsidiary Nova Energy, which has had three of its Exclusive Prospecting Licences renewed for a further two years.<br /><br />The highly prospective ground is flanked by Namibia&rsquo;s largest currently known uranium deposit and the world&rsquo;s third largest uranium-only deposit, the Husab Uranium Project owned by <strong><a href="http://www.proactiveinvestors.co.uk/companies/overview/2587/Extract+Resources" class="companyPopupTrigger" rel="2587">Extract Resources</a>&rsquo; (ASX: EXT) </strong>wholly owned Namibian subsidiary Swakop Uranium.<br /><br />Husab hosts a Measured uranium Resource of 84 million pounds, an Indicated Resource of 274 million pounds and an Inferred Resource of 130 million pounds.<br /><br />Other major uranium projects located nearby include <strong><a href="http://www.proactiveinvestors.co.uk/companies/overview/9049/Paladin+Energy" class="companyPopupTrigger" rel="9049">Paladin Energy</a>&rsquo;s (ASX: PDN) </strong>Langer Heinrich Mine, <strong><a href="http://www.proactiveinvestors.co.uk/companies/overview/2097/Bannerman+Resources" class="companyPopupTrigger" rel="2097">Bannerman Resources</a>&rsquo; (ASX: BMN)</strong> Etango deposit and the <strong><a href="http://www.proactiveinvestors.co.uk/companies/overview/3586/Rio+Tinto" class="companyPopupTrigger" rel="3586">Rio Tinto</a> (ASX: RIO)</strong> -Pitchstone Exploration Dome Project.<br /><br />This is the second time the three licences have been renewed in full and with no further conditions.<br /><br />Meanwhile, Toro is working towards advancing its Western Australian projects through a share purchase plan.<br /><br />Toro is offering shareholders the opportunity to purchase up to A$15,000 worth of shares at an issue price of A$0.08 per share.<br /><br />Money raised through the placement will be used for further drilling and project advancement work at Thesus, for Resource and brownfields development at Wiluna, and ongoing working capital requirements. <br /><br />The share placement will boost Toro&rsquo;s cash reserves of $10.5 million at the end of the Decmeber quarter. <br /><br />Toro is continuing to advance its Wiluna Uranium Project through WA and Federal Government approvals, and anticipates Government decisions by approximately mid-2012. <br /><br />Importantly for Toro, uranium development has support from the Western Australian Government, and Opposition Leader Mark McGowan has said if elected, previously approved uranium mines will be allowed to continue development.</p> ]]></description>
			<pubDate>Tue, 21 Feb 2012 04:15:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/39213/toro-energys-namibian-interests-progress-with-renewal-of-exploration-licences-39213.html</guid>
		</item>
		<item>
			<title>Toro Energy: shareholders accept termination terms for Mt Woods uranium project </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/38936/toro-energy-shareholders-accept-termination-terms-for-mt-woods-uranium-project--38936.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has updated the market on the Mt Woods uranium project.</p>
<p>Toro said that shareholders have voted to accept the terms of a termination agreement for the company&rsquo;s involvement in the Mount Woods uranium project in South Australia.</p>
<p>At yesterdays general meeting, shareholders supported the proposal that Toro be paid $3.75 million by <strong>OZ Minerals (ASX: OZL)</strong> as consideration for the termination of an agreement between the two companies as previously applied to the project.</p>
<p>Both companies signed a Letter of Intent in November last year for the termination of the Tenements Access Agreement between them over Mount Woods &ndash; a project comprising tenements EL4025, EL4132, EL4283 and EL4390.</p>
<p>Toro required shareholder approval for the transaction as it was disposing of a substantial asset to a substantial shareholder, OZ Minerals, which holds 42.06% of Toro&rsquo;s issued share capital.</p>
<p>The Tenement Access Agreement granted Toro the right to explore for and, under certain conditions, mine economic uranium discoveries. It also entitled Toro access to all Mt Woods exploration data and information collected by OZ Minerals on the tenements.</p>
<p>OZ Minerals has conducted major exploration programs at Mt Woods and, despite extensive drilling campaigns, no potentially economic uranium results have been reported from the project.</p>
<p>Toro announced at the time that a review by it of the project&rsquo;s exploration data, provided no indication or encouragement.</p>
<p>&nbsp;</p> ]]></description>
			<pubDate>Tue, 14 Feb 2012 04:17:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/38936/toro-energy-shareholders-accept-termination-terms-for-mt-woods-uranium-project--38936.html</guid>
		</item>
		<item>
			<title>Toro Energy launches SPP to boost $10.5m pot for advanced uranium projects</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/38603/toro-energy-launches-spp-to-boost-105m-pot-for-advanced-uranium-projects-38603.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has launched a Share Purchase Plan to raise funds for progressing the company&rsquo;s advanced stage uranium projects, Theseus and Wiluna, in Western Australia.<br /><br />Uranium explorer and developer Toro finished the December quarter with A$10.5 million cash. The company now has the chance to increase this by launching the share purchase plan.<br /><br />Toro is offering shareholders the opportunity to purchase up to A$15,000 worth of shares at an issue price of A$0.08 per share, a hefty discount to the company&rsquo;s Friday closing price of A$0.10.<br /><br />Money raised through the placement will be applied to further drilling and project advancement work at Thesus, Resource and brownfields development at Wiluna and ongoing working capital requirements.<br /><br />Toro managing director Greg Hall said the company was making good progress at both projects.<br /><br />&ldquo;Toro is continuing to advance its Wiluna Uranium Project through WA and Federal Government approvals, and anticipates Government decisions by approximately mid-2012,&rdquo; Hall said.<br /><br />&ldquo;This will make Toro‟s Wiluna Project one of the only independently-owned uranium projects around the world to advance to this stage.&rdquo;<br /><br />&ldquo;The continued drilling and project advancement of the exciting new Theseus Project is expected to allow the definition of a JORC compliant resource during the year, and will potentially provide Toro with a further pipeline uranium project.&rdquo;<br /><br />Importantly for Toro, uranium development has support from the state government, and the opposition leader has said that if elected, previously approved uranium mines would be allowed to continue development.<br /><br />The share purchase plan will open on February 15 and is scheduled to close on March 6.</p> ]]></description>
			<pubDate>Mon, 06 Feb 2012 01:34:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/38603/toro-energy-launches-spp-to-boost-105m-pot-for-advanced-uranium-projects-38603.html</guid>
		</item>
		<item>
			<title>Toro Energy buoyed by WA Opposition Leader’s revised uranium mine policy </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/38136/toro-energy-buoyed-by-wa-opposition-leaders-revised-uranium-mine-policy--38136.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) is encouraged by Western Australian Opposition Leader Mark McGowan&rsquo;s announcement this week that he will allow <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> mines already approved by the current Liberal Government to proceed if Labor gains power in the next election. <br /><br />A Government decision is expected for Toro&rsquo;s Wiluna Project by mid-2012, well before Western Australia&rsquo;s next election, with environmental impact documentation now in the final stages of assessment by the Western Australian and Federal Governments.<br /><br />Subject to the <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> market and suitable project finance, Toro anticipates a development decision by the end 2012, with construction and commissioning through 2013 and first sales in 2014.<br /><br />Last year Toro completed and announced technical and economic improvements to its Wiluna Project, with increased resources, pilot processing completed, and improved economic outcomes. <br /><br />A major review of the economic model for Wiluna has yielded a C1 cash operating cost of US$33 per pound of <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> and recoveries of 85% after a two year ramp up. <br /><br />Wiluna is the most advanced project in government assessment in Australia, and one of a few <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> projects globally, able to be developed in the short term.<br /><br />Managing director Greg Hall said while the policy shift is welcome, and supports the current status of the Wiluna <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Project, it still does not create full certainty for future <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> projects in Western Australia.<br /><br />The final detailed engineering study will begin at the start of February, with completion of the Definitive Feasibility Study planned to coincide with anticipated approval decisions.</p> ]]></description>
			<pubDate>Tue, 24 Jan 2012 03:22:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/38136/toro-energy-buoyed-by-wa-opposition-leaders-revised-uranium-mine-policy--38136.html</guid>
		</item>
		<item>
			<title>Toro Energy shares soar 48%, ASX issues speeding ticket</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/36761/toro-energy-shares-soar-48-asx-issues-speeding-ticket-36761.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has caught the attention of investors this week with shares in the company leaping 48% to $0.12 in intra-day trade yesterday, up from $0.081 a week earlier.<br /><br />The ASX therefore issued Toro with a price query speeding ticket, with the company it is not aware of any material information that has not been disclosed to the market, which may explain the sudden investor interest.<br /><br />Toro has been very busy recently, and earlier in this week delivered some very interesting news to the market - with the company potentially positioned to benefit from any heavy rare earth discoveries on its tenements.<br /><br />In a very strategic move, Toro executed an agreement with Northern Minerals (ASX: NTU) to initiate a new joint venture.<br /><br />The agreement allows for Northern to explore for non-<a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> minerals on seven of Toro&rsquo;s wholly owned tenements in the Tanami region of the Northern Territory.<br /><br />Northern intends to focus on heavy rare earth elements as part of its Browns Range project while Toro retains 100% of all <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> rights throughout the joint venture.<br /><br /><br /><strong>Terms of the joint venture</strong><br /><br />- The agreement allows Northern to earn up to 80% interest in non-<a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> minerals in the tenements over a five year period in various stages;<br />- In the first stage, Northern has agreed to spend $4 million on exploration over the first three years to earn a 51% interest;<br />- In the second stage, Northern has the option to increase its interest to 70% by spending an additional $2 million over the following two years; and<br />- Finally, Northern has the option to complete a Bankable or Definitive Feasibility Study and lift its equity position in non-<a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> minerals to 80% if Toro chooses not to contribute.<br /><br />The tenements lie around the southern margin of the Browns Range Dome and, in particular, have substantial potential for unconformity style <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.<br /><br />Highlighting the prospectivity of the area, the single previous explorer, Japanese company, PNC Ltd, had identified a 20 kilometre long belt of geology that is directly analogous with that of the Alligator River <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Field, which hosts the Ranger and Jabiluka <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> deposits.<br /><br />PNC created a sizable dataset that will enable Toro to fast-track its own <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> exploration in the area, which will also assist in the exploration for other commodities by the joint venture partners.<br /><br /><br /><strong>Toro remains very well-funded</strong><br /><br />Toro had $18.5 million in cash at the end of the September 2011 quarter.</p> ]]></description>
			<pubDate>Fri, 09 Dec 2011 00:29:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/36761/toro-energy-shares-soar-48-asx-issues-speeding-ticket-36761.html</guid>
		</item>
		<item>
			<title>Toro Energy: JV partner set to explore for heavy rare earth elements at Browns Range</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/36562/toro-energy-jv-partner-set-to-explore-for-heavy-rare-earth-elements-at-browns-range-36562.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) in a very strategic move has executed an agreement with Northern Minerals (ASX: NTU) to initiate a new joint.<br /><br />The agreement allows for Northern to explore for non-<a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> minerals on seven of Toro&rsquo;s wholly owned tenements in the Tanami region of the Northern Territory.<br /><br />Northern intends to focus on heavy rare earth elements as part of its Browns Range project while Toro retains 100% of all <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> rights throughout the joint venture.<br /><br />Greg Hall, managing director of Toro, commented on the opportunity:<br /><br />&ldquo;We are very pleased to have Northern Minerals as a joint venture partner in the Tanami region and look forward to working together to progress this underexplored region.<br /><br />"Toro believes there is great opportunity not only for rare earths but also gold and <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> and we hope this joint venture will help drive additional fresh exploration in the region.&rdquo;<br /><br /><br /><strong>Terms of the joint venture</strong><br /><br />- The agreement allows Northern to earn up to 80% interest in non-<a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> minerals in the tenements over a five year period in various stages;<br />- In the first stage, Northern has agreed to spend $4 million on exploration over the first three years to earn a 51% interest;<br />- In the second stage, Northern has the option to increase its interest to 70% by spending an additional $2 million over the following two years; and<br />- Finally, Northern has the option to complete a Bankable or Definitive Feasibility Study and lift its equity position in non-<a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> minerals to 80% if Toro chooses not to contribute.<br /><br />The tenements lie around the southern margin of the Browns Range Dome and, in particular, have substantial potential for unconformity style <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.<br /><br />Highlighting the prospectivity of the area, the single previous explorer, Japanese company, PNC Ltd, had identified a 20 kilometre long belt of geology that is directly analogous with that of the Alligator River <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Field, which hosts the Ranger and Jabiluka <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> deposits.<br /><br />PNC created a sizable dataset that will enable Toro to fast-track its own <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> exploration in the area, which will also assist in the exploration for other commodities by the joint venture partners.<br /><br /><br /><strong>Toro remains very well-funded</strong><br /><br />Toro had $18.5 million in cash at the end of the September 2011 quarter.</p>
<p>&nbsp;</p> ]]></description>
			<pubDate>Tue, 06 Dec 2011 00:32:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/36562/toro-energy-jv-partner-set-to-explore-for-heavy-rare-earth-elements-at-browns-range-36562.html</guid>
		</item>
		<item>
			<title>Toro Energy exits trading halt, talks with cornerstone investors continue</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/36351/toro-energy-exits-trading-halt-talks-with-cornerstone-investors-continue-36351.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) is no longer in the trading halt granted by the ASX on 29 November 2011, pending an announcement of a capital raising initiative.<br /><br />Toro has been in talks with a number of Asian based investor groups interested in entering into strategic partnership with the company through a cornerstone equity investment.<br /><br />Negotiations are continuing and the market will be updated again in due course.<br /><br />Toro is fully funded for its near term activities at the Wiluna and Theseus projects in Western Australia.<br /><br />Wiluna contains two shallow calcrete deposits, Lake Way and Centipede, with prefeasibility and optimisation studies completed and technical work underway that will lead to a Definitive Feasibility Study. <br /><br />Just last week the company delivered results from a major review of the financial outcomes of the Wiluna Project. Highlights included that over the first 10 years operating life of the project the new economic model has indicated that a "C1" cash operating cost of US$33 per pound uranium. <br /><br />C1 cash operating costs encompass all fixed and variable site based costs such as mining, milling, processing, admin and general expenses. It excludes royalties and capital allowances.<br /><br />Toro has commenced the approvals process targeting the company&rsquo;s first uranium production late 2013 and Wiluna remains on track to emerge as Australia&rsquo;s fifth operating uranium mine.<br /><br />The company has a very healthy cash balance of about $15 million, and in addition recently announced the $3.75 million consideration for the retirement of the Mt Woods uranium rights in South Australia.</p> ]]></description>
			<pubDate>Thu, 01 Dec 2011 01:17:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/36351/toro-energy-exits-trading-halt-talks-with-cornerstone-investors-continue-36351.html</guid>
		</item>
		<item>
			<title>Toro Energy granted halt pending capital raising announcement</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/36223/toro-energy-granted-halt-pending-capital-raising-announcement-36223.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has been granted a trading halt by the ASX pending the release of a capital raising initiative, with the company's shares placed in pre-open.<br /><br />Toro has not yet indicated where the potential capital injection will be allocated, but the company is currently in a very interesting position and just last week delivered results from a major review of the financial outcomes of the Wiluna <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Project in Western Australia.<br /><br />Highlights included that over the first 10 years operating life of the project the new economic model has indicated that a "C1" cash operating cost of US$33 per pound <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.&nbsp; <br /><br />C1 cash operating costs encompass all fixed and variable site based costs such as mining, milling, processing, admin and general expenses. It excludes royalties and capital allowances.<br /><br />The halt will last until the earlier of the announcement being made to the market, or the open of trade on Thursday 1 December.</p> ]]></description>
			<pubDate>Tue, 29 Nov 2011 00:13:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/36223/toro-energy-granted-halt-pending-capital-raising-announcement-36223.html</guid>
		</item>
		<item>
			<title>Toro Energy to benefit from improved economic returns for Wiluna Uranium Project, WA</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35918/toro-energy-to-benefit-from-improved-economic-returns-for-wiluna-uranium-project-wa-35918.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has received the results of a major review of the financial outcomes of the Wiluna <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Project in Western Australia, benefitting the project's economic parameters and Toro shareholders.<br /><br />Over the first 10 years operating life of the project the new economic model has indicated that a "C1" cash operating cost of US$33 per pound <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.&nbsp; <br /><br />C1 cash operating costs encompass all fixed and variable site based costs such as mining, milling, processing, admin and general expenses. It excludes royalties and capital allowances.<br /><br />The model also indicates that <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> recovery will settle at 85% after a ramp-up of two years and average annual production of 1.8 million pounds <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> equivalent will achieved from an average processing head grade of about 720 parts per million (ppm) <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.<br /><br />Greg Hall, Toro's managing director, said &ldquo;Toro is pleased with the progress that has been made at the Wiluna <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Project including the recent completion of the resource update, the pilot plant program, improvement in project economics and completion of the public exhibition phase of the government assessment and approval process. <br /><br />"It is the Australian project most advanced in government assessment and only one of a handful of <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> projects which can be developed worldwide in the short term.&rdquo;<br /><br />The economic model is based on the construction of an alkaline agitated tank leach processing plant and all associated supporting infrastructure for A$280 million. <br /><br />The plant would have a nominal annual throughput of 1.3 million tonnes per annum and produce about 820 tonnes <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> equivalent per year. <br /><br />Toro expects selective mining to occur within a series of shallow open pits and which would be progressively rehabilitated after the pits were utilised as tailings impoundment facilities or for rock waste disposal. <br /><br />Toro&rsquo;s Environmental Review and Management Program is currently being assessed by the Western Australian and Federal Governments.<br /><br />The improved economics of the project are a result of several factors which include:<br /><br />- An upgrade in the resource model and a revised mining plan for the Lake Way and Centipede Deposits. The new mining plan involves the selective mining of the ore bodies to a cut-off of 250 ppm U3O8 and processing to a higher cut-off of 500 ppm U3O8. <br /><br />The average strip ratio is 3 to 1 and the average feed grade to the processing plant is projected to be approximately 720 ppm U3O8 in the first ten years of the project;<br /><br />- Integration of the results of the recent pilot plant process. The pilot plant testing confirmed recoveries of 85% are achievable and the incorporation of revised reagent usage levels; and<br /><br />- Redesign of the economic model to reflect the impact of the USD/AUD exchange rate on the cost structure of the project and the identification of USD priced input costs. <br /><br />The company estimates that about 30% of the C1 cash operating cost are USD denominated and that the long term exchange rate will trend to US$0.85 in 2015, based on analysts&rsquo; consensus forecasts.<br /><br />Toro is continuing to investigate a number of initiatives to further improve the economic outcomes of the project including further improvement of the JORC resource base through extensional and infill drilling.<br /><br />The company is also seeking further optimisation of the mining schedule to increase grade of ore to processing plant and the assessment of third party provided power generation and accommodation services.<br /><br />The feasibility study for the Wiluna <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Project is ongoing and is scheduled to be completed in the second quarter of 2012 after the conclusion of the formal full feasibility study by independent engineers. <br /><br />The company expects first production in late 2013, subject to government approvals.<br /><br />With <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> prices ticking up recently to $55.25, as well as the Australian Prime Minister pushing to allow <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> exports to India, the <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> sector is showing some resilience.&nbsp; The initiative could also open new funding options for emerging miners of <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>. <br /><br /><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> had a healthy $A18.5 million cash balance at the end of the September quarter.</p> ]]></description>
			<pubDate>Tue, 22 Nov 2011 00:53:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35918/toro-energy-to-benefit-from-improved-economic-returns-for-wiluna-uranium-project-wa-35918.html</guid>
		</item>
		<item>
			<title>Toro Energy signs LOI with OZ Minerals to terminate Mt Woods access agreement </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35799/toro-energy-signs-loi-with-oz-minerals-to-terminate-mt-woods-access-agreement--35799.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has executed of a letter of intent with OZ Minerals (ASX: OZL) for the termination of Toro&rsquo;s tenements access agreement over the Mt Woods Project located in South Australia.<br /><br />In consideration for the termination of the agreement and related novation deed, Toro will receive a $3.75 million cash offer from OZ Minerals.<br /><br />The agreement granted Toro the right to explore and, under certain conditions, mine economic uranium discoveries over EL4025, EL4132, EL4283 and EL4390. In addition, it entitled Toro access to all exploration data and information collected by OZ Minerals on the tenements.<br /><br />No potentially economic uranium results have been reported by OZ Minerals from the Mt Woods Project, despite conducting extensive drilling campaigns. Toro has also conducted a review of the exploration data and found no indication that further exploration would improve the uranium prospects at Mt Woods.<br /><br />Toro recently wrapped up the exploration program at the Theseus project in Western Australia for this season, releasing some very promising results pointing to a large uranium mineralised system with the right ingredients for in-situ recovery.The potential size of the system is also very encouraging for Toro.<br /><br />The company has now outlined an exploration target for Theseus of 20 to 40 million tonnes at 400 to 500ppm uranium, for 10,000 to 20,000 tonnes of uranium, (or 22 to 44 million pounds).<br /><br />Toro is already putting in place a plan to test the target, which will be evaluated by mud rotary drilling during 2012, following the results of studies of disequilibrium and bottle roll leach testing.<br /><br />Toro had a healthy A$18.5 millon cash balance at the end of the September quarter.</p> ]]></description>
			<pubDate>Fri, 18 Nov 2011 05:44:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35799/toro-energy-signs-loi-with-oz-minerals-to-terminate-mt-woods-access-agreement--35799.html</guid>
		</item>
		<item>
			<title>Toro Energy: exploration target set at plus 20Mt at 400ppm uranium at Theseus</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35598/toro-energy-exploration-target-set-at-plus-20mt-at-400ppm-uranium-at-theseus-35598.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has now outlined an exploration target for the wholly owned Theseus <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> Project in Western Australia, where the company has recently returned grades of up to 9,000 parts per million (ppm) <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.<br /><br />The target is 20 to 40 million tonnes at 400 to 500ppm <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>, for 10,000 to 20,000 tonnes of <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>, (or 22 to 44 million pounds).<br /><br />Toro is already putting in place a plan to test the target, which will be evaluated by mud rotary drilling during 2012, following the results of studies of disequilibrium and bottle roll leach testing.<br /><br />Studies will focus on recovery characteristics and the potential to improve <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> grades from gamma data collected so far.<br /><br />Greg Hall, managing director, commented on the good news, &ldquo;Theseus has to date been a major success story for Toro and one that is yet to be fully recognised by equities markets as a major grass roots <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> discovery.<br /><br />"It is becoming clear that Theseus may only be one prospect within this new <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> province and the region has the potential for further major discoveries. Toro believes that the exploration target range announced today is only a small indication of the significant potential of this region.&rdquo;<br /><br /><br /><strong>Drilling success at Theseus from 2011 program</strong><br /><br />Toro delivered some exploration success at Theseus in the 2011 drilling program, with results such as 3.44 metres at 1,137ppm <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>, which includes the peak result of nearly 9,000ppm.<br /><br />Drilling during the year confirmed the presence of significant <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> mineralisation, with a total of 130 vertical mud rotary and aircore having now been drilled and downhole gamma logged at the project.<br /><br />Significantly, half of the holes report a gamma, assay or PFN result greater than 0.5 metres at 100ppm <a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a>.<br /><br /><a href="http://www.proactiveinvestors.co.uk/companies/overview/8662/Uranium" class="companyPopupTrigger" rel="8662">Uranium</a> mineralisation is hosted within the variably oxidised sand-clay sequence and its distribution is concentrated at boundaries between reduced and oxidised sediments.<br /><br />The thickest and highest grade mineralised intercepts are hosted within sands ranging from 1 to 6 metres thick, while thinner intercepts are localised at the upper and lower boundaries of sand units.</p> ]]></description>
			<pubDate>Tue, 15 Nov 2011 00:59:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35598/toro-energy-exploration-target-set-at-plus-20mt-at-400ppm-uranium-at-theseus-35598.html</guid>
		</item>
		<item>
			<title>Toro Energy director increases direct stake in the company </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/35408/toro-energy-director-increases-direct-stake-in-the-company--35408.html</link>
			<description><![CDATA[<p><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) non-executive director Peter Lester has acquired further shares in an on-market purchase, boosting his direct stake in the company. <br /><br />Lester bought 60,000 shares on-market for a consideration of A$4,866, providing an average entry price of $0.08.<br /><br />The purchase upped his stake to 60,000 ordinary shares and 1 million unlisted options. <br /><br /><a href="http://www.proactiveinvestors.co.uk/companies/overview/8962/Toro+Energy" class="companyPopupTrigger" rel="8962">Toro Energy</a> is currently in a very interesting position, continuing to intersect high grade uranium mineralised zones at the wholly owned Theseus uranium project in Western Australia.<br /><br />The mineralised zone at the Theseus Project palaeochannel system is now confirmed over a minimum strike length of 8 kilometres, and averages 500 metres wide, varying in thickness from 1 metre to 9 metres. <br /><br />Recent results at the project point to a large uranium mineralised system.</p> ]]></description>
			<pubDate>Wed, 09 Nov 2011 22:19:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/35408/toro-energy-director-increases-direct-stake-in-the-company--35408.html</guid>
		</item>
		<item>
			<title>Toro Energy intersects more high grade uranium at Theseus, points to large uranium system</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/34840/toro-energy-intersects-more-high-grade-uranium-at-theseus-points-to-large-uranium-system-34840.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://genera.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) continues to intersect high grade uranium mineralised zones at the wholly owned Theseus uranium project in Western Australia.</p>
<p>For the last phase of the program, Toro focused on testing the extent  of higher-grade zones within the eight kilometres of palaeochannel  previously defined.</p>
<p>Drilling at 100 metre spacing has intersected higher grade zones of mineralisation in three locations.</p>
<p>The mineralised zone at the Theseus Project palaeochannel system is  now confirmed over a minimum strike length of 8km and averages 500  metres wide, varying in thickness from 1 metre to 9 metres.</p>
<p>This palaeochannel system is considered open to the northwest and to  the southeast with a secondary, mineralised, 2 kilometres long tributary  that is also open to the east.</p>
<p>The latest results are pointing to a large uranium mineralised system.<br /><br />Highlights from the final phase of the in-hole gamma results from the mud rotary program include:<br /><br />- 1.52 metres at 0.15% uranium [0.22%GT] from 116.61 metres, including 0.46 metres at 0.44% uranium;<br /><br />- 3.44 metres at 0.13% uranium [0.45%GT] from 111.4 metres, including 1.34 metre at 0.31% uranium; and<br /><br />- 3.74 metres at 0.17% uranium [0.65%GT] from 100.2 metres, including 2.62 metres at 0.23% uranium.<br /><br />Importantly,  the tenor and grade of intersection results above at &gt;0.1%GT would  be considered ore-grade for a typical in-situ recovery operation.<br /><br />Greg  Hall, managing director, commented on the positive results, &ldquo;The most  recent drilling results from the Theseus Project point to a large  uranium mineralised system with the right ingredients for in-situ  recovery.<br /><br />"The potential size of the system is very encouraging for Toro.<br /><br />"Further  work already underway will provide more information on the uranium  mineral species and the potential to extract uranium in a leach  solution, but we have been especially encouraged by the tenor of  intersections late in the program where ore-grades seen elsewhere are  now being regularly intersected at Theseus.&rdquo;<br /><br /><br /><strong>Extensive 2011 drilling program</strong><br /><br />The  2011 drilling program comprised in total 51 aircore holes for 6700  metres and 64 mud rotary holes for 8500 metres, which have now all been  completed.<br /><br />Providing another boost to the project, the addition  of the extra geophysical information gained from the mud rotary drilling  is enabling Toro to build a geological model to constrain higher-grade  mineralisation and provide targets for drilling in 2012.<br /><br />Once a  full analysis of the geophysical data is completed early in November, an  exploration target range for 2012 will be announced for the Theseus  Project.</p>]]></description>
			<pubDate>Thu, 27 Oct 2011 01:29:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/34840/toro-energy-intersects-more-high-grade-uranium-at-theseus-points-to-large-uranium-system-34840.html</guid>
		</item>
		<item>
			<title>Toro Energy returns peak value of nearly 9,000ppm eU3O8 at Theseus</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/34570/toro-energy-returns-peak-value-of-nearly-9000ppm-eu3o8-at-theseus-34570.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://genera.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  has wrapped up the exploration program at Theseus project in Western  Australia for this season, but not before releasing some very promising  results.<br /><br />The highlight from the latest drilling is 3.44 metres at  1,137 parts per million (ppm) eU3O8, which includes the peak result of  nearly 9,000ppm.<br /><br />The tenor of the mineralisation in this hole  provides further evidence of the encouraging potential, with significant  areas yet to be tested.<br /><br />Adding some more interest to Theseus,  there are still more drill results pending and an exploration target  range to be released - with is forecast to be announced within a month.<br /><br /><br /><strong>Initial geological evaluation</strong><br /><br />Toro  has undertaken an initial interpretation of drilling results from the  project, and have identified that the main mineralised zone is  associated with the transition between oxidized and reduced (i.e.  organic-rich and pyritic) sediments.<br /><br />The reduced interval is up to 18 metres thick and forms the lower part of the palaeochannel fill.<br /><br />Drilling  to date indicates that the reduced interval is locally over 500 metres  wide and extends for more than 10 kilometres along the palaeochannel  axis. Sands that host the mineralisation are bounded by clay and  overlain by up to 100 metres of clay-dominant sediments.</p>]]></description>
			<pubDate>Thu, 20 Oct 2011 01:41:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/34570/toro-energy-returns-peak-value-of-nearly-9000ppm-eu3o8-at-theseus-34570.html</guid>
		</item>
		<item>
			<title>Toro Energy delivers 32% boost to 50.1Mlbs uranium resource at Wiluna region</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/34124/toro-energy-delivers-32-boost-to-501mlbs-uranium-resource-at-wiluna-region-34124.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://genera.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  continues to unlock the potential of the Wiluna Uranium Project in  Western Australia, and today delivered yet another boost in an updated  resource.<br /><br />The resource base has increased 32% to 50.1 million  pounds of contained U3O8, which is comprised from 52.25 million tonnes  at 434 parts per million (ppm) for 22,641 tonnes of contained uranium at  200ppm U3O8 cut-of.<br /><br />Greg Hall, managing director, said that Toro was moving closer to being Australia&rsquo;s next uranium producer.<br /><br />"The  resource upgrade of the Centipede and Lake Way deposits and recent  successful pilot plant processing testwork enhance the continuing  technical feasibility study of the Wiluna Project, currently in the  public review phase of government assessment."<br /><br />Wiluna resources  in the Centipede and Lake Way deposits have been upgraded with  additional drilling, with 58% of the project resource now in the higher  confidence categories of Measured and Indicated.<br /><br />Highlighting the  progression of the project, Toro is already seeking Government  approvals to commence mining of these two deposits.<br /><br /><br /><strong>The Millipede deposit</strong><br /><br />The  Millipede deposit represents an increase of 30% over the expected 4 to 5  million pound exploration target range that was announced earlier in  the year, and the Dawson Hinkler results represent a 46% increase over  the established resource acquired in 2010.<br /><br />Importantly - the  Millipede, Dawson Hinkler Well and Nowthanna regional resources,  acquired over the past 12 months, continue to be evaluated for possible  future development.<br /><br />They are not included in the current  assessment being undertaken by the Western Australian and Federal  governments for approval of mining at Centipede and Lake Way.</p>]]></description>
			<pubDate>Mon, 10 Oct 2011 00:42:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/34124/toro-energy-delivers-32-boost-to-501mlbs-uranium-resource-at-wiluna-region-34124.html</guid>
		</item>
		<item>
			<title>Toro Energy finalises the acquisition of two key uranium tenements within the Wiluna region</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/34068/toro-energy-finalises-the-acquisition-of-two-key-uranium-tenements-within-the-wiluna-region-34068.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://genera.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank"><a href="/companies/overview/8962/toro-energy--8962.html">ASX:TOE</a></a>)  has finalised the acquisition of two key uranium tenements within the  Wiluna region, 150 kilometres west of Toro's Wiluna Uranium Project in  Western Australia.<br /><br />The two exploration tenements cover approximately 70% of the Nowthanna uranium deposit near Meekatharra.</p>
<p>Meanwhile, Toro is aiming to deliver a revised JORC resource update  for the Wiluna Region this month. Nowthanna will constitute a portion of  the revised consolidated resource.</p>
<p>On a 100% basis, the Nowthanna deposit has an Inferred JORC Resource  of 10.37 million tonnes at 446ppm uranium for 4,600 tonnes (10.1Mlb) of  contained U3O8 at a 200ppm cut-off grade. <br /><br />Full legal  documentation, formalising the terms of the transaction outlined in the  non binding term sheet, has now been executed with a group of vendors  led by Impact Minerals (<a href="/companies/overview/2846/impact-minerals-limited-2846.html">ASX:IPT</a>).<br /><br />The vendors included CITIC  Nickel Pty Ltd, Talbot Group Investments Pty Ltd, Spar Resources Pty  Ltd, John Rowntree and Teddy Tech Pty Ltd, for the purchase of two  exploration tenements, E51/1072 and E51/1075.<br /><br />The acquisition  fits neatly with similar regional transactions by Toro in the past 12  months that secured uranium tenements in WA from U308 Limited (ASX:  UTO), MPI Nickel Pty Ltd (a subsidiary of Norilsk Nickel Australia Pty  Ltd, transaction in process) and the Minerals and Metals Group.&nbsp; <br /><br />All host either uranium resources or defined uranium mineralisation, as part of the company's regional consolidation strategy.</p>]]></description>
			<pubDate>Fri, 07 Oct 2011 02:04:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/34068/toro-energy-finalises-the-acquisition-of-two-key-uranium-tenements-within-the-wiluna-region-34068.html</guid>
		</item>
		<item>
			<title>Toro Energy achieves 83% recoveries from pilot plant for Wiluna uranium project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/33544/toro-energy-achieves-83-recoveries-from-pilot-plant-for-wiluna-uranium-project-33544.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  continues to provide a very positive news flow for the company's Wiluna  Uranium Project in Western Australia, with today no exception.<br /><br />The  latest test work has confirmed Toro&rsquo;s proposed extraction process for  Wiluna generally supports the original projected parameters and results.<br /><br />This includes above 88% Uranium Dissolution, and to put into perspective, above 85% is considered excellent.<br /><br />Greg  Hall, managing director, commented &ldquo;The results of the pilot plant  testwork are very pleasing, and demonstrate that the agitated alkaline  leach circuit is very viable for the Wiluna Uranium Project ore.<br /><br />"The  results provide a solid basis for our Definitive Feasibility Study and  help improve our understanding of the engineering that will be required  to deliver the Wiluna Project.<br /><br />"Further testwork will now help us to refine the processing circuit and improve our technical knowledge.&rdquo;<br /><br />The integrated pilot plant campaign comprised two separate 10-day continuous runs totalling 480 hours of operation.<br /><br />A  total of 12,811 kg (run 1 = 6,219kg and run 2 =6,529kg) of material was  tested through the two campaigns, with two separate samples of calcrete  and clay dominant ores being tested individually to evaluate  performance in the selected processing circuit.<br /><br />Importantly,  saline groundwater from Wiluna project&rsquo;s Centipede deposit was  successfully used as wash water and flocculent make-up water,  significantly reducing the need for Toro to source high quality, low  salinity water.<br /><br />Furthermore, chloride concentration build-up is  markedly less than previously predicted which will enable common  materials of construction to be used and result in capital cost savings.<br /><br /><br /><strong>New tenements could add 4 million pounds</strong><br /><br />In  other positive news for Toro, last Friday the company finalised legal  documentation with MPI Nickel Pty Ltd that formalises terms for the  purchase of three key mining tenements adjacent to the Centipede deposit  at Wiluna.<br /><br />The outcome is that the "Millipede" uranium tenements  have the potential to add 4 million pounds uranium to the company's  resource base.<br />&nbsp;<br />Toro is currently working on a JORC Resource  update for the Wiluna Project and the company expects the three new  tenements will constitute a portion of the revised consolidated resource  when it is released at the end of this month.<br /><br />Millipede contains  the tenements which have an exploration target in the range of 4&ndash;5  million pounds of uranium (1,800 tonnes to 2,300 tonnes) at a grade  similar to the Centipede and Lake Way deposits of 0.04% to 0.06%.<br /><br />While  the uranium exploration target at Millipede is small by international  standards, the acquisition is an important one for Toro and adds to the  robustness of the Wiluna, which is currently focusing on development.</p>]]></description>
			<pubDate>Mon, 26 Sep 2011 02:32:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/33544/toro-energy-achieves-83-recoveries-from-pilot-plant-for-wiluna-uranium-project-33544.html</guid>
		</item>
		<item>
			<title>Toro Energy's three new uranium tenements could add 4m pounds to resource base</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/33495/toro-energys-three-new-uranium-tenements-could-add-4m-pounds-to-resource-base-33495.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  has finalised legal documentation with MPI Nickel Pty Ltd that  formalises terms for the purchase of three key mining tenements adjacent  to the Centipede deposit at Toro&rsquo;s advanced Wiluna Uranium Project in  Western Australia.</p>
<p>The <span class="caption">"Millipede" </span> uranium tenements could add 4 million pounds uranium to the company's resource base.</p>
<p>Toro is currently working on a JORC Resource update for the Wiluna  Project and the company expects the three new tenements will constitute a  portion of the revised consolidated resource when it is released at the  end of this month.<br /><br />On 17 February 2011 Toro announced it was  acquiring a project called Millipede from MPI. Consideration for the  tenements includes a A$4.5 million cash payment to MPI and 2% Net  Smelter Return (NSR) style royalty in favour of MPI on production in  excess of 4.5 million pounds (Mlb) uranium (U3O8) from the tenements.<br /><br />MPI  is a subsidiary of Norilsk Nickel Australia Pty Ltd and holds a 100%  interest in tenements M53/590 and M53/693 and a 90% interest in tenement  M53/336.<br /><br />Millipede contains the tenements which have an  exploration target in the range of 4&ndash;5 million pounds of uranium (U3O8)  (1,800 tonnes-2,300 tonnes) at a grade similar to the Centipede and Lake  Way deposits (0.04%-0.06% or 400-600 parts per million (ppm)).<br /><br />While  the uranium exploration target at Millipede is small by international  standards, the acquisition is an important one for Toro and adds to the  robustness of the Wiluna Uranium Project, which is currently focusing on  the development of the Lake Way and Centipede deposits.<br /><br />Wiluna  has prefeasibility and optimisation studies completed and a definitive  feasibility study underway. Toro has commenced the approvals process  targeting the company&rsquo;s first uranium production by late 2013.<br /><br />Toro  has purchased the mining tenements and associated database from MPI,  while MPI has retained the rights to all non-uranium minerals (other  than as a by-product of uranium mining of co-mingled ores).<br /><br />One  of the tenements (M53/336) is held in Joint Venture between MPI and  Barrack Mines Pty Ltd, which is a wholly owned subsidiary of Grange  Resources (ASX: GRR), with Barrack holding 10% equity. <br /><br />Toro has concluded the acquisition of this 10% interest in M53/336 on the same terms on a pro-rata basis.</p>]]></description>
			<pubDate>Fri, 23 Sep 2011 02:50:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/33495/toro-energys-three-new-uranium-tenements-could-add-4m-pounds-to-resource-base-33495.html</guid>
		</item>
		<item>
			<title>Toro Energy moves closer to acquiring 40% stake in Nowthanna uranium deposit</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/33337/toro-energy-moves-closer-to-acquiring-40-stake-in-nowthanna-uranium-deposit-33337.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>) has reported<strong> Impact Minerals' (ASX: IPT)</strong> sale of its 40% beneficial interest in the Nowthanna uranium deposit in  Western Australia to Toro is in progress, and is expected to be  complete by the end of September.<br /><br />The sale comprises 100% of the  Quinns Lake Project (E51/1075) and 20% of E51/1072, which is part of the  Yarraburra Nickel Joint Venture. Toro has agreed to purchase the  remaining 80% of E51/1072 from the other parties in the JV.<br /><br />Impact  will receive $713,000 cash and 5,485,000 Toro shares at completion.  Half of the shares will be escrowed for 6 months and the remaining half  will be escrowed for 12 months.<br /><br />Through the direct shareholding  in Toro, Impact will retain significant upside to the targeted first  production from late 2013 from Toro's Wiluna uranium project, 150  kilometres east of Nowthanna,&nbsp; as well as its extensive portfolio of  uranium prospective exploration assets in Australia and Namibia.<br /><br />Impact  has also announced the commencement of a major reverse circulation and  diamond drill program at the Botswana Uranium Project.<br /><br />Drilling  is testing for large deposits of uranium hosted by Karoo sandstone and  by Proterozoic sedimentary rocks and basement granite and  granite‐gneiss.<br /><br />The reverse circulation drill program started in  the Moiyabana area and 19 holes for 1,420 m have been completed on  widely spaced drill lines up to several kilometres apart.<br /><br />At the Red Hills Prospect 17 holes for about 3,229 metres on three lines up to 1 kilometres apart have been completed.<br /><br />The  drill rig is currently at the Mogome Prospect where at least a further  1,200 metres of RC drilling is planned to test uranium‐anomalous  leucogranite, gneiss and migmatite.<br /><br />The first results are expected soon and these will determine the scope of the diamond drill program.<br /><br />The  company has also completed a major airborne magnetic gradiometer and  radiometric survey over the northern part of the Xade Complex in central  Botswana. The data has been received and a detailed interpretation is  in progress.<br /></p>]]></description>
			<pubDate>Tue, 20 Sep 2011 08:06:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/33337/toro-energy-moves-closer-to-acquiring-40-stake-in-nowthanna-uranium-deposit-33337.html</guid>
		</item>
		<item>
			<title>Energy discovers more uranium from drilling at Theseus project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/33253/energy-discovers-more-uranium-from-drilling-at-theseus-project-33253.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  is continuing to intersect anomalous uranium over a wide area from  drilling at its 100%-owned Theseus uranium prospect in Western  Australia.<br /><br />The addition of a mud rotary drill rig continues to  increase Toro's confidence in the project. By combining the results from  the detailed mud rotary program and aircore drilling in the southern  half of the project area, the company plans to develop an exploration  target range by around mid October.<br /><br />Toro would be encouraged by  the additional intersections as three mineralised trends are emerging.  The first trend is between holes LP00191 and LP00200, the second trend  around holes LP00177 and LP00184 and the third trend around holes  LP00187 and LM 0015. <br /><br />The new gamma result from drillhole LM00015  significantly opens up the eastern edge of this prospect with 1.06  metres at 603 parts per million (ppm) eU3O8 [639GT] from 99.92 metres,  including 0.6 metres at 885 ppm eU3O8 from 100.18 metres.</p>
<p>Other highlights from mud rotary holes include:</p>
<p>- 1.62 metres at 370 ppm eU3O8 [600GT] from 100.26 metres in LM00018  including 0.36 metres at 1071 ppm eU3O8 from 101. 4 metres and; and<br />-  2.02 metres at 456 ppm eU3O8 [921GT] from 108.24 metres, including 0.52  metres at 1141 ppm eU3O8 from 108.48 metres (using a 100ppm eU3O8 cut  off)<br /><br />Two aircore holes and 11 mud rotary holes have been completed since the last update on August 29.<br /><br />Greg  Hall, Toro managing director, said &ldquo;it is hoped that drilling proposed  for the southern half of the project will confirm the potential size of  this prospect." <br /><br />The company said a mud rotary drill rig has been  sourced and is now operational on site. Borehole Geophysical Services  has also been contracted to provide down-hole geophysical probing to  supplement geological logging and assist with correlations between  mineralised zones.<br /><br />The Wallis aircore rig is predicted to return  to site around 24 September to complete the drilling program for the  southern half of the prospect, after requiring mechanical repair earlier  this month.<br /><br />In addition, chemical assays for the first six aircore holes, LP00173 to LP00178, have been received with results including: <br /><br />- 6 metres at 625ppm cU3O8 (3751GT) compared to 4.84m @ 829ppm eU3O8 (4012GT)<br />- 2 metres at 1406ppm cU3O8 (2812GT) compared to 1.56m @ 2010ppm eU3O8 (3135GT) <br /><br />The  company said the similarity between the chemical (c) and equivalent (e)  results in LP00177 suggests that uranium disequilibrium will not be a  major factor.<br /><br />Toro expects aircore drillhole samples to be  despatched shortly for XRD mineral identification along with bulk  samples to determine basic leach mechanics later this year. <br /><br />This  preliminary test-work will attempt to identify the uranium mineral  species and the basic leach tests will give some indication of the  potential extractability of uranium.<br /><br />Over the next three weeks,  aircore drilling will continue to test the southern section of the  prospect at 500 metres&nbsp; to 1 kilometres spacing designed to cover the  original grid drill plan area of 5 kilometres x 8 kilometres by mid  October.<br /><br />The mud rotary rig will shortly commence a detailed 200  metre spaced grid covering the 1 square kilometre area between high  grade drillholes LP00191 and LP00194.</p>
<p>Importantly. the geological environment and the consistency of the  mineralised zones at Theseus, albeit at an early stage, supports the  possibility of ISR extraction methods as a potential development  scenario - although the development scenarios and economics remain  undefined at this time.</p>]]></description>
			<pubDate>Mon, 19 Sep 2011 03:08:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/33253/energy-discovers-more-uranium-from-drilling-at-theseus-project-33253.html</guid>
		</item>
		<item>
			<title>Toro Energy gamma probe results further extend Theseus Uranium Prospect</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/32448/toro-energy-gamma-probe-results-further-extend-theseus-uranium-prospect-32448.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  has received promising results from gamma probe results which expand  the Theseus Uranium prospect in Western Australia with the aerial extent  now defined over an 8 square kilometre area.<br /><br />Significantly, this  aerial extent is larger than the combined footprint of comparable  systems such as the various deposits of the Frome embayment in South  Australia. The mineralisation trend remains open in all directions  except to the northwest.<br /><br />Potentiall economic tenor intersections with grade and thickness of greater than 1500 are continuing to be found.<br /><br />Highlights include:<br /><br />-  5.4 metres at 460 parts per million (ppm) uranium (eU3O8) [2464GT] from  107.93 metres in LP00194 using 100ppm eU3O8 cut off including 1.2m at  1145ppm eU3O8 from 109.5m using a 500ppm eU3O8 cut off;<br />- 1.6 metres  at 982 ppm eU3O8 [1571GT] from 102.07m in LP00200 using 100ppm eU3O8 cut  off including 1.1m @ 1316ppm eU3O8 from 102.3m using a 500ppm eU3O8 cut  off.<br /><br />The grade tenor at Theseus remains to be defined in detail. <br /><br />Importantly, the mineralisation trend remains open in all directions except to the northwest.<br /><br />Greg  Hall, Toro managing director, said &ldquo;the high grade gamma results from  LP194 and LP200 are highly encouraging with greater than 1500GT results  providing an early indication of potential economic grades of  mineralisation in an in-situ recovery scenario. <br /><br />"It is early  days and we are yet to undertake flow tests or other key tests. However,  the essential geological building blocks appear to be in place."<br /><br />&nbsp;The new gamma probe results for a further 12 holes, LP192 &ndash; LP203, are now available. <br /><br />These  include two holes returning results of economic interest (&gt;1500GT,  reported above), five returning mineralisation zones confirming the  regional mineralised trend (&gt;100ppm), four returning no significant  intersection and one requiring re-drill due to completion issues. <br /><br />A total of 31 aircore holes has now been drilled in the planned 60 hole program. <br /><br />Over  the past 10 days, the drill holes were spaced at a nominal 800m to 1.2  kilometres, designed to define the western and northern edges of the  uranium mineralised system at Theseus. <br /><br />This was essential, given  the intersections in LP00194 of 5.36 metres at 460ppm eU3O8 [2464GT]  and LP00191 of 9.06m @ 620ppm eU3O8 [5616GT] failed to close the  mineralised system in this direction. <br /><br />The aircore program will  continue for another 2-3 weeks, moving this week to the yet to be  drilled southern half of the prospect. A mud rotary drill rig has also  been sourced and should be on site shortly. <br /><br />The addition of a  mud rotary drill rig for the program will accelerate drill production  and allow important geological information to be collected.<br /><br />This  rig will drill intermediate holes between high grade intersections as  well as assist in covering the full grid. Each mud rotary hole will be  down-hole probed with a range of geophysical tools with results being  used to build a detailed understanding of the prospect&rsquo;s geology and  mineralisation.<br /><br />Aircore drilling will continue to test the  discovery at 500 metres to 1 kilometre spacing to cover the original  grid drill plan of 5km x 8km area.<br /><br />On the most northern drill  traverse, drill hole LP00200 was drilled as a twin of LP00199, when this  hole was abandoned failing to intersect the basement. <br /><br />The  uranium intersection in LP00200 is nearly three times as high in grade  as drill hole LP00199, indicating closer spaced drilling is essential to  fully evaluate this prospect.<br /><br />Toro has outlined the lithological  and mineralogical association at Theseus saying that it is very similar  to the 4 Mile and Beverley uranium deposits in South Australia which  are currently being developed or are in production.<br /><br />Both uranium  deposits are amenable to In Situ Recovery (ISR) where slightly acidified  water is pumped to depths of 150 metres through confined sand layers,  extracting and transporting uranium to a surface processing plant.<br /><br />Similarities  can also be drawn to operating ISR mines in the US and Kazakhstan where  uranium mineralisation is mined by ISR techniques.<br /><br />The  geological environment and the consistency of the mineralised zones at  Theseus, albeit at an early stage, supports the possibility of ISR  extraction methods as a potential development scenario - although the  development scenarios and economics remain undefined at this time.</p>]]></description>
			<pubDate>Mon, 29 Aug 2011 01:37:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/32448/toro-energy-gamma-probe-results-further-extend-theseus-uranium-prospect-32448.html</guid>
		</item>
		<item>
			<title>Toro Energy comes up trumps as Theseus turns into major uranium discovery</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/32083/toro-energy-comes-up-trumps-as-theseus-turns-into-major-uranium-discovery-32083.html</link>
			<description><![CDATA[<p>Toro Energy (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/252/toro-energy-0252.html" target="_blank">ASX: TOE</a>)  string of high grade results has confirmed the Theseus Prospect in  Western Australia to be a large uranium mineralised system covering over  7.5 square kilometres.</p>
<p>To continue to unlock the significance of this discovery, Toro will  now ramp up drilling targeting the definition of higher grade uranium  zones.</p>
<p>Drilling highlights include:</p>
<p>- 4.46 metres at 837 ppm eU3O8 from 98.11 metres, including 1.54 metres at 1909ppm eU3O8;</p>
<p>- 9.02 metres at 619 ppm eU3O8 from 100.38 metres, including 1.46 metres at 2204ppm eU3O8; and</p>
<p>- 3.54 metres at 378 ppm eU3O8 from 105.63 metres, including 0.44 metres at 1469ppm eU3O8.</p>
<p>An air-core drilling campaign kicked off at the prospect earlier in  the month, with 19 of the planned 60 holes having been drilled and gamma  logged so far to total depths ranging from 103 metres to 210 metres,  passing through a basement interface at roughly 125 metres.</p>
<p>What is so important for the discovery, is that twelve of the  nineteen holes drilled so far report uranium intersections with grades  above 100ppm eU3O8, and widths greater than 0.5 metres - pointing to an  extensive system.</p>
<p>Greg Hall, managing director, added &ldquo;We are excited and encouraged by  the size, extent and grade of uranium mineralisation so far  intersected.</p>
<p>"Toro&rsquo;s systematic approach to defining the location of the higher  grade uranium mineralisation in Theseus is key to ensuring the system is  well defined before more closely spaced drilling is used to define a  resource prepared in accordance with the JORC code.&rdquo;</p>
<p>Importantly - the minimum extent of the system is now 5 kilometres by 1.5 kilometres, and open in all directions.</p>
<p>Geologically, Theseus is situated within an interpreted northerly trending palaeovalley broadly defined by previous drilling.</p>
<p>The prospect is part of Toro's wholly owned flagship Lake Mackay  Project, located 650 kilometres west of Alice Springs but inside the  Western Australia border.</p>
<p>Toro is also developing the advanced Wiluna uranium project which is  further west in the state and scheduled for first production from late  in 2013, pending government approvals.</p>
<p><br /><strong>Potential in-situ recovery</strong></p>
<p>Toro has outlined the lithological and mineralogical association at  Theseus saying that it is very similar to the 4 Mile and Beverley  uranium deposits in South Australia which are currently being developed  or are in production.</p>
<p>Both uranium deposits are amenable to In Situ Recovery (ISR) where  slightly acidified water is pumped to depths of 150 metres through  confined sand layers, extracting and transporting uranium to a surface  processing plant.</p>
<p>The company added that similarities can also be drawn to operating  ISR mines in the US and Kazakhstan where uranium mineralisation is mined  by ISR techniques.</p>
<p>The geological environment and the consistency of the mineralised  zones at Theseus, albeit at an early stage, supports the possibility of  ISR extraction methods as a potential development scenario - although  the development scenarios and economics remain undefined at this time.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Thu, 18 Aug 2011 02:14:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/32083/toro-energy-comes-up-trumps-as-theseus-turns-into-major-uranium-discovery-32083.html</guid>
		</item>
	</channel>
</rss>

