<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>Proactiveinvestors United Kingdom </title>
	<link>http://www.proactiveinvestors.co.uk</link>
	<description>Proactiveinvestors United Kingdom  RSS feed
            </description>
	<language>en</language>
	<pubDate>Thu, 09 Feb 2012 12:15:24 +0000</pubDate>
	<docs>http://blogs.law.harvard.edu/tech/rss</docs>
	<generator>Genera CMS</generator>
	<managingEditor>action@proactiveinvestors.com (Proactiveinvestors)</managingEditor>
	<webMaster>action@proactiveinvestors.com (Proactiveinvestors)</webMaster>
	<atom:link href="http://www.proactiveinvestors.co.uk/companies/dedicated_rss/1945/arafura-resources-1945.xml" rel="self" type="application/rss+xml" />
		<item>
			<title>Arafura Resources' MD Steve Ward outlines major 5 rig drill program at Nolans Rare Earths Project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/31275/arafura-resources-md-steve-ward-outlines-major-5-rig-drill-program-at-nolans-rare-earths-project-31275.html</link>
			<description><![CDATA[<p>Arafura Resources' (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  managing director Dr Stephen Ward outlined to Proactive Investors about  the significance of the work program at Nolans Rare Earths Project for  the year ahead.<br /><br />This followed yesterday's significant intersections of shallow rare earths mineralisation at the Nolans Bore deposit.<br /><br />"The  2011 drill program at Nolans is a major undertaking for the company. We  will drill more meters this year than we have done in all the previous  years added together."<br /><br />He told Proactive Investors, "this has  involved five drill rigs. Two reverse circulation (RC) rigs have  operated on a two shift/day basis. Three diamond rigs have operated on a  round the clock 24 hour basis.<br />&nbsp; <br />"We have also installed sample  preparation facilities at Nolans to facilitate initial drill sample  preparation. The program has involved around 50 personnel working at  Nolans (Arafura staff and contractors)."<br /><br />Ward said, "there are two components to the drill program:<br /><br /><strong>Resource confidence improvement</strong><br /><br />We  currently have a 30mt JORC compliant resource with amounts in  categorizations of inferred, measured and indicated resources. The aim  of this work is to do further drilling (essentially infill) to enable,  with the application of other requirements necessary under the code, for  some of the resource to be upgraded to reserve status. <br /><br />This is required for the Bankable feasibility Study to enable us to attract debt financing.<br /><br /><strong>Resource expansion</strong><br /><br />The  current JORC resource of 30 million tonnes will sustain rare earth  oxide production of 20,000 tonnes per annum for just over 20 years. <br />&nbsp;<br />Previous  drilling had stopped in ore due to lack of funds. The drilling this  year will follow on from previous drilling at depth and along strike to  determine how big the resource is. Initial drill results announced today  confirm the presence of more ore.&nbsp; <br /><br />We hope that the final  program will show that Nolans is large enough to sustain a future  expansion beyond the initial phase of 20kt per annum.&nbsp; Extra material  from this drilling will be in resource status (inferred or possibly  indicated)." <br /><br />Ward said, "the outlook for rare earths is very  positive.&nbsp; We see there would be a great opportunity for an expansion in  the period 2016+ as we struggle to see where new supplies will come  from when the market demand is estimated to be growing at 20kt each year  i.e. one new Nolans project required each year."</p>]]></description>
			<pubDate>Fri, 29 Jul 2011 07:32:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/31275/arafura-resources-md-steve-ward-outlines-major-5-rig-drill-program-at-nolans-rare-earths-project-31275.html</guid>
		</item>
		<item>
			<title>Arafura Resources discovers more near surface rare earths mineralisation at Nolans Bore </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/31218/arafura-resources-discovers-more-near-surface-rare-earths-mineralisation-at-nolans-bore--31218.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has intersected significant shallow rare earths mineralisation at  Nolans Bore deposit, with wide intersections within an area that had not  been extensively tested by previous drilling.<br /><br />Further rare  earths have been confirmed at depth across large parts of the Nolans  Bore resource and a revised JORC resource is expected by the end of  2011, as some of this material has not been included. This new estimate  will be used as the basis for the Nolans Project Bankable Feasibility  Study (BFS).<br /><br />Highlights include:<br /><br />- 143 metres at 3.6% rare  earth oxides (REO), 19.8% phosphorus (P2O5) and 0.56 pounds per tonne  (lb/t) uranium (U3O8) from 23 metres;<br />- 27 metres at 4.1% REO, 25.6% P2O5 and 0.58 lb/t U3O8 from 58 metres; and<br />- 19 metres at 5.4% REO, 27.1% P2O5 and 0.90 lb/t U3O8 from 106 metres.<br /><br />The  Nolans Project in the Northern Territory is regarded as one of the  world's largest undeveloped rare earths projects and is aiming for rare  earth oxide production from 2013, and could supply 10% of the global  rare earths market from 2015.<br /><br />Dr Steve Ward, Arafura&rsquo;s managing  director and CEO, said &ldquo;the 2011 drill campaign has been a major  undertaking for the company. We will have completed more drilling this  year than we have in total for all previous years. <br /><br />"The initial  results are very encouraging and reinforce the world-class status of  Nolans Bore. We look forward to further results from the campaign when  we will be able to assess the extent of expansion opportunities. This is  particularly important considering the current undersupply in rare  earths, which is forecast to remain in place for some years to come.&rdquo;<br /><br />The  powerful force driving Nolans to production will continue to be the  increasing rare earth elements (REE) demand, predicted at 7%-9% per  annum over the next 5 years, against a background of supply constraint  and very restrictive export quotas in China.<br /><br />The Nolans Bore  deposit is 135 kilometres from Alice Springs, and has a JORC resource of  30.3 million tonnes (Mt) containing 848,000 tonnes of rare earth oxides  (REO), 3.9Mt of phosphate (P2O5), and 13.3mlbs of uranium (U3O8), with  potential to expand. <br /><br />The company said the mineralisation is  buried under about 3 metres of shallow overburden in an extensive  north-south zone that transects the deposit. The presence of  infrastructure inhibited access to the area during earlier drilling  campaigns.<br /><br />Arafura is now undertaking additional drilling to  further evaluate the extent and nature of this newly recognized  north-south zone of mineralisation. <br /><br />These drill intercepts are  part of a comprehensive campaign of reverse circulation and diamond core  (DDH) drilling (totaling 52,260m) that commenced at Nolans Bore in  February 2011. <br /><br />All shallow (150 metre deep) reverse circulation  infill drilling has now been completed (29,904 metres in 227 holes) and  assay results so far are in line with expectations.<br /><br />An extensive  program of deeper diamond drilling is nearing completion with geological  and geophysical logging confirming the presence of Nolans Bore-type  rare earths mineralisation at depth across large parts of the deposit.<br /><br />The  campaign aims to provide improved JORC confidence levels for part of  the resource necessary for the Nolans Project BFS and determine the full  extent of the Nolans Bore resource for assessment of expansion  opportunities.<br /><br />Arafura recently expanded the scope of BFS for the  Nolans project and extended the expected completion date of the BFS by  nine to twelve months.<br /><br />The expanded BFS will not only reduce  operating and capital costs and de-risk the proposed Rare Earths Complex  at Whyalla, but take advantage of 1,221 per cent higher rare earths  prices, by simplifying the project flow sheet to focus on rare earth  products.<br /><br />Notably, the average valuation for the Nolans Rare  Earths mix has lifted to US$207.53/kg (FOB) in June 2011, compared to  the June 2010 value. These higher prices are expected to continue  because of the demand and supply equation for rare earths.<br /><br />By the  end of 2011 the company expects to have a much clearer understanding of  the deposit&rsquo;s capability to support expanded production far into the  future, with sample analysis and geological interpretation of drill data  well underway.</p>]]></description>
			<pubDate>Thu, 28 Jul 2011 06:10:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/31218/arafura-resources-discovers-more-near-surface-rare-earths-mineralisation-at-nolans-bore--31218.html</guid>
		</item>
		<item>
			<title>Arafura Resources shareholders to receive priority offer in Global Mineral Resources IPO</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/30575/arafura-resources-shareholders-to-receive-priority-offer-in-global-mineral-resources-ipo-30575.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has reported that eligible Arafura shareholders will be given a  priority offer for 7.5 million shares in Global Mineral Resources (ASX:  GOM), as part of Global's initial public offering (IPO).<br /><br />The IPO  is hoping to raise up to A$6 million dollars by offering 30 million  shares at $0.20. The priority offer is as a result of Global&rsquo;s  acquisition of the Mt Porter-Frances Creek Gold Project in the Northern  Territory from Arafura.<br /><br />Following Global's listing on the ASX,  Arafura will receive A$1.5 million cash, 7.5 million fully paid ordinary  shares, and 7.5 million options exercisable at A$0.25 prior to 30 June  2013.<br /><br />Arafura sold the non-core Mt Porter-Frances Creek asset to  Global in order to focus on rare earths at its world class Nolans  Project.<br /><br />The Mt Porter-Frances Creek Gold Project represents  early development potential, with mining and environmental approvals  already in place, as well as an agreement between Arafura and  traditional land owners.<br /><br />The project includes 34,200 ounces of  inferred and indicated JORC Resources at Mt Porter, and gold exploration  and development rights over several adjacent licences in the Frances  Creek region.<br /><br />There is potential to increase the scale of the  deposit with extensions to the existing mineralisation yet to be fully  tested. At Frances Creek there have also been high grade gold  intersections that have yet to be converted into defined resources.<br /><br /><br /></p>]]></description>
			<pubDate>Wed, 13 Jul 2011 08:12:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/30575/arafura-resources-shareholders-to-receive-priority-offer-in-global-mineral-resources-ipo-30575.html</guid>
		</item>
		<item>
			<title>Arafura Resources signs milestone agreement for Nolans Rare Earths Project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/30101/arafura-resources-signs-milestone-agreement-for-nolans-rare-earths-project-30101.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has reached an important milestone in the development of the Nolans  Rare Earths Project by signing a land purchase contract with OneSteel  Limited (ASX: OST), securing the site for the Whyalla rare earths  processing complex.<br /><br />Signed contracts were exchanged with  subsidiary OneSteel Manufacturing Pty Ltd to purchase 800 hectares of  land at Whyalla in South Australia, which will help underpin Arafura&rsquo;s  position as one of the very few near-term producers of rare earths. <br /><br />The  Nolans Project in the Northern Territory is regarded as one of the  world's largest undeveloped rare earths projects and is aiming for rare  earth oxide production from 2013.<br /><br />The project will use a  production process developed in Australia, and will be one of the first  major producers outside of China for users worldwide.<br /><br />Under the  contract, which is subject to final government approvals, Arafura  retains rights to access the Whyalla  site to continue with detailed  engineering and environmental studies.<br /><br />Dr Steve Ward, Arafura  managing director and CEO, said "Whyalla is a key part of Arafura&rsquo;s  business model which is to add value to resources in Australia and  produce rare earth oxides for users worldwide using production processes  developed in Australia.<br /><br />&ldquo;The Whyalla community and the South  Australian and Northern Territory governments have been very supportive  of our plans to deliver a project that will place Australia well and  truly on the global rare earths industry map."<br /><br />The land is  located within the current OneSteel Whyalla landholding and the contract  incorporates easements for the location of infrastructure.<br /><br />In  September 2010, Arafura and OneSteel signed an exclusivity deed to  negotiate a formal sale agreement which has now been concluded. <br /><br />Earlier  this month Arafura received Environmental Impact Statement (EIS)  guidelines relating to development approvals for the Rare Earths Complex  at the site.<br /><br />The Whyalla site was identified after a  comprehensive Australia-wide assessment, and has many of the  characteristics necessary for the development and operation of a  substantial minerals processing and chemical facility, such as  availability of services, close proximity to transport infrastructure,  and access to a skilled workforce. <br /><br />The company continues to progress work relating to the EIS approval.<br /><br />Arafura  recently expanded the scope of Bankable Feasibility Study (BFS) for the  Nolans project and extended the expected completion date of the BFS by  nine to twelve months.<br /><br />The expanded BFS will not only reduce  operating and capital costs and de-risk the proposed Rare Earths Complex  at Whyalla, but take advantage of 1,221 per cent higher rare earths  prices, by simplifying the project flow sheet to focus on rare earth  products.<br /><br />Notably, the average valuation for the Nolans Rare  Earths mix has lifted to US$207.53/kg (FOB) in June 2011, compared to  the June 2010 value. These higher prices are expected to continue  because of the demand and supply equation for rare earths.<br /><br />By the  end of 2011 the company expects to have a much clearer understanding of  the deposit&rsquo;s capability to support expanded production far into the  future, with sample analysis and geological interpretation of drill data  well underway.</p>]]></description>
			<pubDate>Fri, 01 Jul 2011 02:47:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/30101/arafura-resources-signs-milestone-agreement-for-nolans-rare-earths-project-30101.html</guid>
		</item>
		<item>
			<title>Arafura Resources expanded BFS aims to reduce costs at Nolans, leverage higher rare earths prices</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/29711/arafura-resources-expanded-bfs-aims-to-reduce-costs-at-nolans-leverage-higher-rare-earths-prices-29711.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has expanded the scope of Bankable Feasibility Study (BFS) for the  Nolans rare earths project and extended the expected completion date of  the BFS by nine to twelve months.<br /><br />The expanded BFS will not only  reduce operating and capital costs and de-risk the proposed Rare Earths  Complex at Whyalla, but take advantage of 1,221 per cent higher rare  earths prices, by simplifying the project flow sheet to focus on rare  earth products.<br /><br />Notably, the average valuation for the Nolans  Rare Earths mix has lifted to US$207.53/kg (FOB) in June 2011, compared  to the June 2010 value. These higher prices are expected to continue  because of the demand and supply equation for rare earths.<br /><br />Arafura  has A$79 million cash at end of May 2011.&nbsp; To complete the expanded  BFS, additional funding in the order of A$50-A$60 million will be needed  and other costs originally envisaged as part of project financing, but  now brought forward due to the revised schedule. The Company will look  at financing options for these additional requirements.<br /><br />The  Nolans Project will be an integrated Rare Earths Oxide project (mine to  market), using a production process developed in Australia, and will be  one of the first major producers outside of China for users worldwide.<br /><br />Dr  Steve Ward, Arafura managing director and CEO,&nbsp; said, &ldquo;the entire  project flow sheet was extensively analysed as part of the technical  review. A key outcome was identification of potential opportunities to  simplify the flow sheet, which we believe will enable Arafura to  maximise the inherent value of the Nolans Project. <br /><br />"Our focus  will be very much on Rare Earths with a de-emphasis on the other  products which may be produced in simpler alternate forms using standard  engineering designs. Importantly, the simplified flow sheet will reduce  interdependency risks between the rare earth plant and the other  product plants.&rdquo;<br /><br />The BFS was expanded following a detailed  technical review by the company and its team of consultants, which are  leading global experts in large scale mineral processing projects such  as Nolans. <br /><br /><strong>Major work in the expanded BFS includes:</strong><br /><br />-  Design and optimization of a modified mine site beneficiation circuit  which aims to generate a higher mineral concentrate grade with  associated reduction in reagent, transport, capital and waste management  costs, both at the Nolans Bore Mine and Whyalla Rare Earths Complex;<br /><br />-  Further test work and refinement of R&amp;D programs by the Australian  Nuclear Science and Technology Organisation (ANSTO) to produce separated  Rare Earth products to customer specifications; and<br /><br />-  Undertaking detailed technical studies on major interaction points in a  simplified process flow sheet to provide further confidence in process  technology and reduce start-up risk.<br /><br /><strong>Higher Grade Mineral Concentrate</strong><br /><br />Recent  trialling of new physical separation processes has identified the  potential to generate a significantly higher grade mineral concentrate  from the proposed Nolans Bore Mine. This would deliver substantial  savings over the life of the project due to reduced reagent, transport,  capital and waste management costs.<br /><br />Given the potential benefits across the Nolans Project, extensive geological and metallurgical testing is in progress.<br /><br /><strong>Further development of REO separation technology </strong><br /><br />Arafura  has also made strong progress on its technology development program to  produce REOs in the past year. Laboratory and pilot scale work is  continuing, including further refinement, separation and quality  assurance work streams, in consultation with technical experts at ANSTO  and targeted customers to meet their commercial specifications. <br /><br />Successful  pilot/demonstration test work on individual components of the  processing circuit has been completed or is currently planned.  Additional work to assess key interaction points takes this work one  step further to provide increased confidence in process technology and  reduce start-up risk.<br /><br />The resource expansion phase of the Nolans  Bore drilling program has commenced, with the recent completion of the  shallow reverse circulation (RC) component. <br /><br />The&nbsp; remaining  months of the program will concentrate on extending Rare Earths&nbsp;  mineralization to depths beyond 150 metres below surface.<br /><br />The  company said drilling aimed at enhancing confidence in the Nolans Bore  resource, primarily through infill drilling, is now complete. <br /><br />By  the end of 2011 the company expects to have a much clearer  understanding of the deposit&rsquo;s capability to support expanded production  far into the future, with sample analysis and geological interpretation  of the drill data well underway.</p>]]></description>
			<pubDate>Thu, 23 Jun 2011 03:19:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/29711/arafura-resources-expanded-bfs-aims-to-reduce-costs-at-nolans-leverage-higher-rare-earths-prices-29711.html</guid>
		</item>
		<item>
			<title>Arafura Resources bullish on Nolans rare earth project with release of environmental guidelines</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/29498/arafura-resources-bullish-on-nolans-rare-earth-project-with-release-of-environmental-guidelines-29498.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>) has been working on background to the Environmental Impact Statement (EIS) for some months.&nbsp; <br /><br />Today's  release of government guidelines for the proposed Rare Earths Complex  at Whyalla in South Australia provides Arafura with the focus to  complete the work required for the EIS concurrent with continuing its  consultation activities with all stakeholders.<br /><br />The South  Australian Government granted Major Project status to Whyalla in  September 2010. Development of a rare earths processing facility at  Whyalla will be a significant value-adding project for Australia where  mineral concentrate from Arafura&rsquo;s Nolans Bore Mine will be upgraded  prior to sale.<br /><br />Dr Steve Ward, Arafura managing director and CEO,  said &ldquo;this Complex will be a substantial mineral processing and chemical  manufacturing facility by Australian standards. Whyalla will be  Arafura&rsquo;s - and Australia&rsquo;s - gateway to global rare earths markets,&rdquo; he  said.<br /><br />The company commenced background work some months ago as a  precursor to receiving the formal guidelines and will now prepare the  EIS covering all aspects of Arafura&rsquo;s proposed operations in Whyalla.<br /><br />Arafura  is engaging in ongoing community consultation as the company is fully  committed to ensuring its future operations comply with all relevant  regulations.<br /><br />Significantly, the Nolans Project is not dependent  on current high rare earth pricing to be viable, and has industry  competitive costs.<br /><br />Arafura is the only new, short to medium term  producer with significant quantities of Rare Earth Oxides still for sale  and discussions with target potential customers are in progress.<br /><br />The  release was accompanied by a joint media statement from the Minister  for Urban Development, Planning and the City of Adelaide, Hon John Rau,  and the Minister for Mineral Resources Development, Hon Tom  Koutsantonis.<br /></p>]]></description>
			<pubDate>Fri, 17 Jun 2011 03:06:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/29498/arafura-resources-bullish-on-nolans-rare-earth-project-with-release-of-environmental-guidelines-29498.html</guid>
		</item>
		<item>
			<title>Arafura Resources completes key technology work program for Nolans rare earths project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/28539/arafura-resources-completes-key-technology-work-program-for-nolans-rare-earths-project-28539.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has completed the hydrochloric acid regeneration program at its Nolans  rare earths-phosphate-uranium project in the Northern Territory.<br /><br />The  program is a key part of its wider, previously reported technology  program at Nolans, where Arafura remains on track to deliver the first  production of an annualised 20,000 tonnes of rare earth oxides in 2013.<br /><br />The  process involves taking calcium chloride residues from the phosphate  circuit and re-acting them with sulphuric acid to produce re-useable  hydrochloric acid, a key raw material in Arafura&rsquo;s pre-leach circuit,  thus reducing Arafura&rsquo;s dependence on external Hydrochloric acid  sources.</p>
<p>The process also produces calcium sulphate (gypsum), a potential saleable product into various end applications. <br /><br />Dr  Steve Ward, Arafura&rsquo;s managing director and CEO, said &ldquo;The successful  completion of this demonstration program highlights Arafura&rsquo;s commitment  to the Nolans Project and its efforts to de-risk key technological  aspects.<br /><br />"This is important for potential financiers and provides  valuable technical and operating experience for Arafura. The successful  completion of this work is another major step forward for us.&rdquo;<br /><br />The  company now plans to incorporate the logistical and economic benefits  of Hydrochloric acid regeneration and gypsum production into the  Bankable Feasibility Study (BFS) for Nolans.<br /><br />Arafura has begun  engineering design for the overall flowsheet, and said that customers  are being further engaged for evaluation of the gypsum product for  potential offtake.<br /><br />AMMTEC successfully operated the demonstration  plant on a continuous basis at its facility in Perth, Western  Australia, with involvement from experts from the University of  Montreal, Canada, and Arafura&rsquo;s Technology team.<br /><br />The demonstration facility has successfully achieved:</p>
<ul class="standard-list">
<li>Production of 32% Hydrochloric acid from a simulated recycle stream  similar to the Phosphate circuit waste liquors, with a recycle  efficiency of at least 97.5%;</li>
</ul>
<ul class="standard-list">
<li>Production of crystalline gypsum with filtration characteristics suitable for processing via commercially available filters;</li>
</ul>
<ul class="standard-list">
<li>Production of Dihydrate gypsum. Feedback from one major gypsum user  indicates that this material has potential for future commercial use;</li>
</ul>
<ul class="standard-list">
<li>Provision of detailed design and operating data for the Bankable Feasibility Study.</li>
</ul>
<p><br />The company is advancing towards delivering a BFS for Nolans, and  remains well funded after the A$90 million capital raising towards the  end of 2010.<br /><br />On March 21 Arafura's Nolans rare earths mix leaped  above $US120 a kilogram, more than three times the 2010 average of US$34  a kilogram, indicating the continuing strong global demand for rare  earths.<br /><br /><br /><br /><br /><br /><br /></p>]]></description>
			<pubDate>Tue, 24 May 2011 03:13:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/28539/arafura-resources-completes-key-technology-work-program-for-nolans-rare-earths-project-28539.html</guid>
		</item>
		<item>
			<title>Arafura Resources rare earths mix leaps above US$120 per kilogram</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/26509/arafura-resources-rare-earths-mix-leaps-above-us120-per-kilogram-26509.html</link>
			<description><![CDATA[<p>The Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>) Nolans rare earths mix has leaped above $US120 a kilogram.</p>
<p>To put this price into perspective, it is more than three times the 2010 average of US$34 a kilogram.</p>
<p>What is important is Steve Ward, managing director, has reiterated  that Arafura remains on track to deliver the first production in 2013 of  an annualised 20,000 tonnes of rare earth oxides from the Nolans  Project.</p>
<p>&ldquo;We are one of only a few potential rare earth producers which can meet growing non-Chinese demand in the short to medium term."</p>
<p>Arafura is currently in detailed discussions with non-Chinese major users around the world.</p>
<p>The company continues to quickly advance towards delivering a  Bankable Feasibility Study, and remains well funded after the A$90  million capital raising towards the end of 2010.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Mon, 21 Mar 2011 04:41:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/26509/arafura-resources-rare-earths-mix-leaps-above-us120-per-kilogram-26509.html</guid>
		</item>
		<item>
			<title>Arafura Resources upbeat on Nolans rare earths 14% price spike to near $100 per kg</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/25827/arafura-resources-upbeat-on-nolans-rare-earths-14-price-spike-to-near-100-per-kg-25827.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has reported that one kilogram of Nolans rare earths mix has increased  in value to US$98.86, representing a 14% increase since February 21.<br /><br />The new prices for rare earths quoted by Metal Pages equate to about $2768 per tonne of in situ ore.<br /><br />Prices  continue to move higher on China's announcement on further reductions  in rare earth export quotas in allocations for the first half of 2011. <br /><br />Prices  of all rare earths have increased in response to the new quotas, in  particular cerium, neodymium and praseodymium oxides. <br /><br />On  February 14 Arafura said it will undertake a major drilling program at&nbsp;  Nolans to upgrade resources as part of the Nolans Bore Bankable  Feasibility Study.<br /><br />The company is well positioned for project  financing later this year and will shortly be in talks with potential  customers in Korea, Japan, Europe and North America.</p>]]></description>
			<pubDate>Thu, 24 Feb 2011 06:16:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/25827/arafura-resources-upbeat-on-nolans-rare-earths-14-price-spike-to-near-100-per-kg-25827.html</guid>
		</item>
		<item>
			<title>Arafura Resources buoyed by further Nolans rare earths price increase</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/25708/arafura-resources-buoyed-by-further-nolans-rare-earths-price-increase-25708.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) has reported that one kilogram of Nolans  rare earths mix has increased in value to US$86.26, representing a 10%  increase since January 2011, and is 2.5 times the 2010 average. <br /><br />The  new prices for rare earths quoted by Metal Pages have moved upwards  again since China announced further reductions in rare earth export  quotas in allocations for the first half of 2011. <br /><br />Prices of all  rare earths have increased in response to the new quotas, in particular  cerium, neodymium and praseodymium oxides. <br /><br />Importantly, Arafura  recently announced it had successfully separated these rare earths as  part of its ongoing technology program.<br /><br />Dr Steve Ward, Arafura&rsquo;s  Managing Director and CEO, said, &ldquo;this trend is further demonstration of  the very positive outlook for global rare earth markets."<br /><br />"We  are entering a new era for the rare earths industry as a very small  number of suppliers from outside of China emerge in the short to medium  term."<br /><br />Arafura is making solid progress towards its plan for  first production in 2013 at its wholly-owned Nolans Bore Rare Earths  deposit. <br /><br />The company plans to exploit Nolans Bore to produce  rare earth oxides for worldwide markets and is well positioned to  capitalise on favourable future market conditions. <br /><br />At current prices, Arafura's annual sales revenue from rare earths alone will be US$1.7 billion.<br /><br />The  company believes that future pricing "will reflect the tight ongoing  market supply/demand dynamics, and recognise the criticality of rare  earths to end applications for relatively modest input cost.&rdquo;<br /><br />On  February 14 Arafura said it will undertake a major drilling program at&nbsp;  Nolans to upgrade resources as part of the Nolans Bore Bankable  Feasibility Study.</p>]]></description>
			<pubDate>Mon, 21 Feb 2011 05:36:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/25708/arafura-resources-buoyed-by-further-nolans-rare-earths-price-increase-25708.html</guid>
		</item>
		<item>
			<title>Arafura Resources drilling targets resource upgrade at Nolans Bore rare earths deposit</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/25479/arafura-resources-drilling-targets-resource-upgrade-at-nolans-bore-rare-earths-deposit-25479.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) will undertake a major drilling program at  its Nolans Bore rare earths resource&nbsp; to upgrade resources as part of  the Nolans Bore Bankable Feasibility Study.<br /><br />Arafura has executed  an agreement with Drillwest, a Western Australian drilling contractor,  to commence the campaign in the Northern Territory later this week.<br /><br />The  program is scheduled to be completed within six months using four  drilling rigs and will be a key component of the overall Nolans work  program for 2011.<br /><br />Drilling will involve a team of around 40  personnel, and represents the single most comprehensive program to be  commissioned by the company with 30,000 metres of reverse circulation  (RC) drilling and 16,500 metres of core drilling.<br /><br />Total  JORC-compliant Mineral Resources of 30.3 million tonnes (Measured,  Indicated and Inferred) have been outlined at Nolans Bore down to a  depth of 150 metres below surface. <br /><br />The purpose of the 2011  drilling program is to upgrade currently identified lower confidence  Inferred Resources into higher confidence Indicated Resources as part of  the Nolans Bankable Feasibility Study.<br /><br />Higher confidence Mineral  Resources can then be converted to JORC-compliant Ore Reserves by  applying additional technical and economic parameters.<br /><br />Also, the  program aims to establish the potential for additional Mineral Resources  down to a depth of 250 metres below surface across the full lateral  extent of the deposit.<br />&nbsp;<br />Nolans Bore is a world class resource but still has unknown upside expansion potential. <br /><br />Dr  Steve Ward, Arafura managing director and CEO said, "in our recent $90  million capital raising, we had identified a priority to test the  extents of Nolans Bore as the foundation for longer term production  expansion over and above our planned nameplate 20,000 tonnes of REO per  annum from the Whyalla Rare Earths Complex." <br /><br />"Arafura has  already successfully developed the processing technology to exploit the  Nolans Bore resource, so no further work of this kind would be required  to increase production if the resource proves to be bigger and can  sustain higher output." he added. <br /><br />China is currently stockpiling  rare earths for its own use and the overall global market is likely to  remain very tight well into the future. <br /><br />Nolans represents one of  the very few rare earth projects sufficiently advanced to be able to  come into production in the short- to medium-term. <br /><br />On January 14 rare earth prices rose again based on the Nolans Rare Earths mix average, benefitting Arafura.&nbsp; <br /><br />The latest price is US$75.23/kg based on current Metal Pages China FOB prices for rare earths oxides. <br /></p>]]></description>
			<pubDate>Mon, 14 Feb 2011 06:17:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/25479/arafura-resources-drilling-targets-resource-upgrade-at-nolans-bore-rare-earths-deposit-25479.html</guid>
		</item>
		<item>
			<title>Arafura Resources advances rare earths processing demonstration program</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/25429/arafura-resources-advances-rare-earths-processing-demonstration-program-25429.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) is progressing with the calcium chloride  recycle part of its demonstration program for key aspects of rare  earths processing technology.<br /><br />The test program is designed to  reduce capital investment and operating expenditure through optimising  all aspects of this part of the rare earth&nbsp; production process.<br /><br />The  company has pre-commissioned the demonstration facilities at AMMTEC in  Perth and full trials with chemicals have now commenced.<br /><br />The  company is advancing the work stream to demonstrate the process in which  calcium chloride is reacted with sulphuric acid to generate  hydrochloric acid for re-use, and calcium sulphate (gypsum) product for  sale.<br /><br />There has already been interest in the gypsum product with  one major gypsum user sending one of their experts to view the&nbsp;  demonstration facilities.<br /><br />On January 24 Arafura continued with  its a main focus on rare earths with the non-core asset sale of the Mt  Porter Gold project to Global Mineral Resources.<br /><br />Arafura is  looking to secure finance for its Nolans Project by the end of 2011, and  commence production in the second half of 2013.<br /><br />In early  January, Arafura produced a commercial quality of separated cerium oxide  and a commercial quality of neodymium/praseodymium oxide at Nolans.<br /><br />Rare  Earths are critical to high tech industries including electric  vehicles, rechargeable batteries, energy efficient lights and iPods, and  there are limited alternate sources.<br /><br />China currently supplies  approximately 95% of the world&rsquo;s needs for these strategic metals and  more price rises are thought likely if China continues to restrict  exports in the interests of preserving resources for domestic  manufacturing.<br /><br /></p>]]></description>
			<pubDate>Fri, 11 Feb 2011 05:51:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/25429/arafura-resources-advances-rare-earths-processing-demonstration-program-25429.html</guid>
		</item>
		<item>
			<title>Arafura Resources sells non-core gold assets to focus on rare earths</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/24853/arafura-resources-sells-non-core-gold-assets-to-focus-on-rare-earths-24853.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) continues a main focus on rare earths  with the non-core asset sale of the Mt Porter Gold project to Global  Mineral Resources.</p>
<p>Consideration for the deal includes A$1.5 million in cash, and 7.5  million Global shares, along with 7.5 million options exercisable at  $0.25.</p>
<p>Global is expected to list on the ASX in mid-2011.</p>
<p>Mt Porter has a 34,200 gold ounce JORC Indicated and Inferred  resource, with gold exploration and development rights over several  adjacent licences in the Frances Creek region, which is in the Northern  Territory.</p>
<p>Steve Ward, Arafura managing director &amp; CEO, said, &ldquo;We are very pleased with this outcome.</p>
<p>"It enables Arafura to realize value from one of our non-core assets  in the near term as we focus on rare earths and our world class Nolans  Project."</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Mon, 24 Jan 2011 04:29:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/24853/arafura-resources-sells-non-core-gold-assets-to-focus-on-rare-earths-24853.html</guid>
		</item>
		<item>
			<title>Arafura Resources produces commercial cerium and neodymium/praseodymium oxides</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/24298/arafura-resources-produces-commercial-cerium-and-neodymiumpraseodymium-oxides-24298.html</link>
			<description><![CDATA[<p>In another major step forward for the Arafura Resources' (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>)  Nolans project, the company has produced a commercial quality of  separated cerium oxide and a commercial quality of  neodymium/praseodymium oxide.</p>
<p>Arafura said further refinement, separation and value adding work will continue in the first quarter of 2011.</p>
<p>The company is now well placed to benefit from the global rare earth  demand, with China reducing rare earth export quotas in the first half  of 2011.</p>
<p>To progress these oxides to a potential sale stage, Arafura said it is conducting ongoing discussions with end users.</p>
<p>This will ensure products produced will meet the industry specifications and market requirements.</p>
<p>Arafura added planning is underway to process the bulk sample  collected under the 'Big Bertha' program through a sulphation  demonstration route, which will produce commercial quantities of  separated oxides for key customer assessment.</p>
<p>The company remains well funded to continue development following the  receipt of the tranche 2 A$37.6 million capital raising, approved by  shareholders in December 2010.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Tue, 04 Jan 2011 06:43:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/24298/arafura-resources-produces-commercial-cerium-and-neodymiumpraseodymium-oxides-24298.html</guid>
		</item>
		<item>
			<title>Arafura Resources shareholders approve A$37.6m t2 capital raising for Nolans rare earth project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/23901/arafura-resources-shareholders-approve-a376m-t2-capital-raising-for-nolans-rare-earth-project-23901.html</link>
			<description><![CDATA[<p>Arafura Resources (ASX: ARU) now has around A$100 million in cash to  advance the Nolans rare earth project, after shareholders approved the  A$37.6m tranche 2 capital raising.</p>
<p>The company is now well funded to progress Nolans to the project  financing stage, including completion of the bankable feasibility study  and securing all regulatory approvals, and completion of the technology  demonstration work program.</p>
<p>Arafura will also conduct definition drilling targeted at increasing  the resource, while identifying if there is expansion potential.</p>
<p>The decision by Arafura&rsquo;s largest shareholder East China Exploration  and Development Bureau to vote against Resolution 1 resulted in it not  being passed, and therefore the company would require shareholder  approval for any share placements prior to October 2011.</p>
<p>Steve Ward, managing director of Arafura, said "Given these  circumstances, we are surprised and disappointed that Resolution 1 was  voted down by ECE.</p>
<p>&ldquo;This has no effect on the capital raising approved today under  Resolution 2 and we continue to move forward on our fast track program  to bring Nolans into production by 2013. Today&rsquo;s result is a reflection  of continued shareholder support, including ECE, for the Nolans  Project.&rdquo;</p>
<p>Arafura said it has no intention to raise further capital until the project financing stage.</p>
<p>Nolans comprises operations at two sites within Australia, the Nolans  Bore Mine in the Northern Territory and the Whyalla Rare Earths Complex  in South Australia.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Fri, 10 Dec 2010 14:27:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/23901/arafura-resources-shareholders-approve-a376m-t2-capital-raising-for-nolans-rare-earth-project-23901.html</guid>
		</item>
		<item>
			<title>Arafura Resources begins  environmental impact studies for Whyalla rare earths complex</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/23144/arafura-resources-begins-environmental-impact-studies-for-whyalla-rare-earths-complex-23144.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX: ARU</a>)  has commenced the environmental impact studies for its Whyalla rare  earths project located on South Australia's Eyre Peninsula, which are an  important step in the company's plan to construct a world-class  complex.<br /><br />The company has contracted AECOM Australia Pty Ltd  (AECOM) to complete the studies which include collecting baseline  environmental data, assessing the interaction of the complex with the  environment, and identifying appropriate measures to deliver a  sustainable outcome for all stakeholders.<br /><br />Field assessment work has begun and the company expects public release of the appropriate documentation by mid-2011.<br /><br />Arafura  plans to produce 20,000 tonnes of rare earth oxides and 80,000 tonnes  of phosphoric acid per annum at the complex from 2013.</p>
<p>Rare earths are in demand worldwide for use in lasers, computer and  television screens, fibre-optic cables and mobile phones.</p>
<p>They are also essential for developing green technologies such as low  energy  light bulbs, wind turbines, rechargeable motor vehicle  batteries and  high-strength magnets.</p>]]></description>
			<pubDate>Thu, 18 Nov 2010 11:30:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/23144/arafura-resources-begins-environmental-impact-studies-for-whyalla-rare-earths-complex-23144.html</guid>
		</item>
		<item>
			<title>Arafura Resources settles Tranche 1 of A$90m placement for Nolans</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/22648/arafura-resources-settles-tranche-1-of-a90m-placement-for-nolans-22648.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://www.proactiveinvestors.com.au/companies/sponsors_landing/658/arafura-resources-0658.html" target="_blank">ASX:ARU</a>) first tranche of the A$90 million placement to advance the rare earths Nolan's Project will settle on Thursday 4 November.</p>
<p>Tranche 1 consists of 43.7 million shares at $1.20 to raise $52.4  million, with traunche 2 consisting of 31.3 million shares at the same  price to raise $37.6 million, which will be put to sharesholders in  early December.</p>
<p>The market has supported the $90 million capital raising, with  Arafura shares last trading at $1.32, a 9% premium to the placement  price.</p>
<p>The major shareholder, East China Exploration &amp; Development  Bureau (ECE), has declined the offer of a pro-rata placement, with its  shareholding in Arafura to be diluted to 17.59% from 22.17%.</p>
<p>The placement will fund the Nolan's Project through to project  financing, which in September 2010 successfully produced a commercial  quality of separated rare earth oxides, with the separation one of the  key technology work streams in progress for the Nolans Project  Feasibility Study.</p>
<p>Given the recent increases in rare earth prices, the value of 1k of  Nolans Rare Earths Mix would be approximately US$43, a 255% increase  since December 2009, and at these prices annual sales revenue from rare  earths alone at Nolans would be US$860 million.</p>]]></description>
			<pubDate>Tue, 02 Nov 2010 09:21:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/22648/arafura-resources-settles-tranche-1-of-a90m-placement-for-nolans-22648.html</guid>
		</item>
		<item>
			<title>Rare earth focused Arafura Resources to raise A$90m for Nolans</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/22515/rare-earth-focused-arafura-resources-to-raise-a90m-for-nolans-22515.html</link>
			<description><![CDATA[<p>A share placement of 75 million shares at $1.20 a share could raise  up to $90 million to progress Arafura Resources (<a href="http://proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX:ARU</a>) Nolan's  Project through to&nbsp;project financing, with the potential for even more  funds to be raised.</p>
<p>Arafura's major shareholder, East China Exploration &amp; Development  Bureau (ECE), will be invited to maintain its pro-rata shareholding,  currently at 22.17%, at the placement price.</p>
<p>A further $25.9 million would be raised if ECE elects and is able to  maintain its current pro-rata shareholding, although any investment will  require Australian and Chinese regulatory approvals, as well as Arafura  shareholder approval.</p>
<p>The placement will consist of two tranches.</p>
<p>Tranche one will comprise 43.7 million shares to raise $52.4 million,  and will be allocated immediately, with Arafura saying it received  significant support for the placement.</p>
<p>Tranche two will comprise 31.3 million shares to raise $37.6 million,  is subject to shareholder approval at an EGM to be held in early  December 2010.</p>
<p>Steve Ward, managing director, said &ldquo;We have made significant progress with our Nolans Project in recent months.</p>
<p>"It (the new funds) also enables us to assess production expansion potential from the Nolans resource."</p>
<p>The placement will bring some new shareholders onto the Arafura  register, including both international and domestic institutions.</p>
<p>Funds raised will also move to completion the technology demonstration work program.</p>
<p>The placement was jointly managed by BBY Limited and Bell Potter Securities Limited.</p>
<p>&nbsp;</p>
<p><em>Article Highlight:</em></p>
<p>The Nolans Project has taken another major step towards rare earth  oxide production from 2013, with sufficient funding in place to progress  to the project financing stage.</p>
<p>&nbsp;</p>]]></description>
			<pubDate>Thu, 28 Oct 2010 09:56:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/22515/rare-earth-focused-arafura-resources-to-raise-a90m-for-nolans-22515.html</guid>
		</item>
		<item>
			<title>Rare earth focused Arafura Resources to raise capital</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/22442/rare-earth-focused-arafura-resources-to-raise-capital-22442.html</link>
			<description><![CDATA[<p>The ASX has granted a trading halt to Arafura Resources (<a href="http://proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX:ARU</a>)  pending the announcement of a capital raising, with the shares being  placed in pre-open.</p>
<p>Arafura has successfully produced a commercial quality separated rare  earth oxides, with the separation of these oxides a key technology in  progress for the Nolans Project Feasibility Study.</p>
<p>Arafura shares last traded at $1.42.</p>]]></description>
			<pubDate>Tue, 26 Oct 2010 12:43:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/22442/rare-earth-focused-arafura-resources-to-raise-capital-22442.html</guid>
		</item>
		<item>
			<title>Arafura Resources gains filip with jump in rare earth prices</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/21276/arafura-resources-gains-filip-with-jump-in-rare-earth-prices-21276.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX:ARU</a>) has noted a further increase in Rare Earths prices in September.</p>
<p>These new prices have pushed the value of 1Kg of Nolans Rare Earth mix past the US$50 level to US$50.03. <br />This represents a stunning 313% increase since December 2009 and continues to the trend of historical highs.</p>
<p>Rare Earths prices have significantly increased following the  announcement by China in July 2010 of reductions in Rare Earth export  quotas for the second half of 2010.</p>
<p>Prices of all Rare Earths have increased. Most recently, the prices  of the lighter Rare Earths, Lanthanum, Praseodymium and Neodymium, have  increased markedly as demand has remained strong while exports of these  from China have been reduced.</p>
<p>Dr Steve Ward Arafura&rsquo;s managing director and CEO said the continuing  trend of higher prices due to shortages outside of China underlines the  importance of new supply sources and in particular the company's own  Nolans Project.</p>
<p>The company has ticked off major milestones at Nolans toward first production in 2013.</p>
<p>At current Rare Earth prices annual sales revenue from Rare Earths alone would be US$1 billion for Arafura.</p>]]></description>
			<pubDate>Wed, 22 Sep 2010 10:59:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/21276/arafura-resources-gains-filip-with-jump-in-rare-earth-prices-21276.html</guid>
		</item>
		<item>
			<title>Arafura Resources welcomes major project status for Whyalla Rare Earths Complex</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/21169/arafura-resources-welcomes-major-project-status-for-whyalla-rare-earths-complex-21169.html</link>
			<description><![CDATA[<p>Perth based Arafura Resources Limited&rsquo;s (<a href="http://proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX:ARU</a>) has announcmed the  South Australian Government intention to declare Major Project status  for Arafura&rsquo;s proposed Whyalla Rare Earths Complex.</p>
<p>Steve Ward, managing director, said he welcomed the South Australian  Government&rsquo;s announcement which recognises that the Rare Earths Complex  is considered to be of major economic, social or environmental  importance to the State.</p>
<p>&ldquo;Arafura&rsquo;s Whyalla Rare Earths Complex is consistent with the SA  Government&rsquo;s objective to develop mineral processing industries in the  area."</p>
<p>"Attaining Major Project status will be another significant step for us.&rdquo;</p>
<p>&ldquo;We have been very pleased with the positive reaction we have  received to our announcement regarding the Whyalla location from both  the SA Government and the local community."</p>
<p>"Site selection is another major milestone in the history of the Company."</p>
<p>"We are now in a position to move forward at pace with all our Nolans  Project work programs as we progress towards production in 2013.&rdquo;</p>
<p>Rare Earth Oxide separation is one of the key technology work streams in progress for the Nolans Project Feasibility Study.</p>
<p>Separated middle rare earth oxides (MREE1) and heavy rare earth  oxides (HREE2) have now been produced at the laboratories of the  Australian Nuclear Science and Technology Organisation (ANSTO) in  Sydney.</p>
<p>Following initial laboratory work a fully integrated mini-plant  representing the MREE and HREE production circuit was successfully  operated continuously for 62 hours, resulting in commercial quality MREE  and HREE products.</p>]]></description>
			<pubDate>Mon, 20 Sep 2010 09:01:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/21169/arafura-resources-welcomes-major-project-status-for-whyalla-rare-earths-complex-21169.html</guid>
		</item>
		<item>
			<title>Arafura Resources opens global rare earths gateway for Nolan's with Onesteel deal</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/21118/arafura-resources-opens-global-rare-earths-gateway-for-nolans-with-onesteel-deal-21118.html</link>
			<description><![CDATA[<p>Arafura Resources (<a href="http://proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX:ARU</a>) has moved the development of the Nolan's  Project another step closer, and increased export potential, with the  signing of an exclusivity deed with a subsidiary of OneSteel (ASX:OST)  to purchase land at Whyalla, South Australia, for its proposed rare  earths processing complex.</p>
<p>The deal allows Arafura immediate access to site to progress detailed  engineering and environmental studies, and marks a major milestone in  the planned development of the 100% owned Nolans Project</p>
<p>Steve Ward, managing director and chief executive officer, said the  site selection decision follows a comprehensive review of potential  sites Australia-wide.</p>
<p>&ldquo;This marks a great step forward for Arafura in delivering the Nolans Project."</p>
<p>&ldquo;This will truly be a value-adding project in Australia where our mineral resources are upgraded prior to sale."</p>
<p>"Whyalla will be Arafura&rsquo;s - and Australia&rsquo;s - gateway to global rare earths markets."</p>
<p>The final decision to proceed with construction of the Rare Earths  Complex will be made following completion of a Bankable Feasibility  Study and project finance is secured.</p>
<p>&ldquo;The signing of this Deed is further evidence that Arafura is  committed to delivering on its stated objective to be the recognised  leading supplier of rare earths to users worldwide from 2013,&rdquo; said  Ward.</p>]]></description>
			<pubDate>Fri, 17 Sep 2010 09:30:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/21118/arafura-resources-opens-global-rare-earths-gateway-for-nolans-with-onesteel-deal-21118.html</guid>
		</item>
		<item>
			<title>Arafura Resources produces commercial quality Rare Earth Oxides from Nolans </title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/20961/arafura-resources-produces-commercial-quality-rare-earth-oxides-from-nolans--20961.html</link>
			<description><![CDATA[<p>Perth-based Arafura Resources (<a href="http://proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) has successfully produced a commercial quality separated Rare Earth Oxides.</p>
<p>Rare Earth Oxide separation is one of the key technology work streams in progress for the Nolans Project Feasibility Study.</p>
<p>Separated middle rare earth oxides (MREE1) and heavy rare earth  oxides (HREE2) have now been produced at the laboratories of the  Australian Nuclear Science and Technology Organisation (ANSTO) in  Sydney.</p>
<p>Following initial laboratory work a fully integrated mini-plant  representing the MREE and HREE production circuit was successfully  operated continuously for 62 hours, resulting in commercial quality MREE  and HREE products.</p>
<p>Laboratory-scale separation of individual light rare earth oxide (LREE3) fractions (La, Ce and Nd/Pr) is now in progress.</p>
<p>&ldquo;The production of separated Rare Earth Oxides presents Arafura with  the opportunity to extract maximum value from the Nolans Project,&rdquo;  Arafura&rsquo;s Managing Director &amp; CEO, Dr Steve Ward, said.</p>
<p>&ldquo;This is a very substantial milestone on our Company&rsquo;s path to  becoming the pre-eminent supplier of Rare Earth Oxides to the world from  operations wholly within Australia.&rdquo;</p>
<p>A pilot plant to produce commercial quality samples of all separated  REO products &ndash; La, Ce, Nd/Pr, MREE and HREE &ndash; for customer assessment is  planned to follow successful completion of LREE test work.</p>
<p>Given recent increases in the prices of Rare Earths, the value of&nbsp;1k  of Nolans Rare Earths Mix would be approximately US$43, a 255% increase  since December 2009. At these&nbsp;prices, annual sales revenue from rare  earths alone at Nolans would be US$860 million.</p>
<p>Prices have moved upwards significantly since China announced  reductions in Rare Earth export quotas for the second half of 2010.  Prices of all rare earths have increased. In particular, the prices of  the lighter Rare Earths, Lanthanum and Cerium, have increased markedly  as exports of these from China have been reduced.</p>]]></description>
			<pubDate>Mon, 13 Sep 2010 10:54:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/20961/arafura-resources-produces-commercial-quality-rare-earth-oxides-from-nolans--20961.html</guid>
		</item>
		<item>
			<title>Arafura Resources adds executive appointment to Nolan's project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/19956/arafura-resources-adds-executive-appointment-to-nolans-project-19956.html</link>
			<description><![CDATA[<p>Australian rare earths company Arafura Resources (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) has announced a key appointment to the Nolan's project team.</p>
<p>John Ganser has been appointed to the position of General Manager  Projects and will join Arafura in September. He brings an  extensive&nbsp;background in Project Management to Arafura&nbsp;and an involvement  in several significant, large scale and successful projects.&nbsp; He will  report to Arafura&rsquo;s managing director and CEO Dr Steve Ward and will be a  member of the executive management team.</p>
<p>Ganser will be responsible for all project matters with specific  focus on delivering the Nolans Project as Arafura moves towards full  operation in 2013.</p>
<p>Arafura&rsquo;s Managing Director and CEO, Dr Steve Ward, said "John brings  the project management and delivery skills that we now require as we  move ahead with the Nolans Project."</p>
<p>"We recognize the critical importance of building the right  combination of skills in Arafura to ensure we make the Nolans Project a  success and John&rsquo;s appointment is a key part of this. Our executive team  is now well equipped and positioned to drive the company forward and  build on the excellent progress we have made this year to date.&rdquo;</p>]]></description>
			<pubDate>Thu, 12 Aug 2010 09:59:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/19956/arafura-resources-adds-executive-appointment-to-nolans-project-19956.html</guid>
		</item>
		<item>
			<title>Arafura Resources reports record Rare Earths prices for Nolans Mix</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/19311/arafura-resources-reports-record-rare-earths-prices-for-nolans-mix-19311.html</link>
			<description><![CDATA[<p>Australian rare earths company Arafura Resources (<a href="http://www.proactiveinvestors.co.uk/companies/sponsors_landing/1945/arafura-resources-1945.html" target="_blank">ASX: ARU</a>) has  reported that Metal Pages published its latest rare earths prices on  22nd July, which equate to a significant rise to US$22.23/kg for the  Nolans Rare Earths mix average valuation. This represents an increase of  100% since the December 2009 quarter.</p>
<p>Pricing has increased further to new industry high levels since 7th  July when the China Ministry of Commerce announced Rare Earths export  quotas for the 2nd half of 2010.The new export quotas represent a 70%  reduction in volumes available for users outside of China. <br /><br />China  currently supplies approximately 95% of the worlds needs for these  strategic metals which are critical to high tech industries including  electric vehicles, rechargeable batteries, energy efficient lights and  i-pods, and there are limited alternate sources.<br /><br />As rare earths  constitute only a small portion of the cost of finished products the  impact of higher prices is not significant. More price rises are thought  likely if China continues to restrict exports in the interests of  preserving resources for domestic manufacturing.<br /><br />Events of recent  weeks demonstrate that Arafura Resources is well placed to secure sales  at superior prices for their rare earths products in this climate of  ever- tightening supply with increasing demand.</p>
<p>Nolans rare earths-phosphate-uranium project is in Australia&rsquo;s  Northern  Territory. Rare earths metals are essential components to  products with significant growth potential in the markets associated  with the electronics and technology industries, energy efficiency and  greenhouse gas reduction.</p>]]></description>
			<pubDate>Tue, 27 Jul 2010 08:37:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/19311/arafura-resources-reports-record-rare-earths-prices-for-nolans-mix-19311.html</guid>
		</item>
		<item>
			<title>Arafura Resources awards contracts to progress Nolans Rare Earths Project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/18240/arafura-resources-awards-contracts-to-progress-nolans-rare-earths-project-18240.html</link>
			<description><![CDATA[<p>Australian rare earths company Arafura Resources (ASX: ARU) has entered into contractual arrangements with a number of parties to progress all remaining key technology work streams for its Nolans Project.<br /><br />The programs are aimed at de-risking and further optimising novel technology in order to facilitate project financing and to shorten the time taken to achieve nameplate production.<br />Initial contracts have now been executed with various organisations to commence the work. <br /><br />Australian Nuclear Science and Technology Organisation (ANSTO) will undergo rare earth oxide separation, Bateman Engineering Pty Ltd will perform rare earth processing optimization and Aker Solutions Australia Pty Ltd will recycle acid&nbsp; from calcium chloride.<br /><br />Steve Ward, managing director and CEO, said &ldquo;this marks another significant milestone as we progress the Nolans Project towards production in 2013."<br /><br />"The work will assist in de-risking the project in the eyes of project financiers, and provide additional product samples for customer assessment.&rdquo;<br /><br />Rare earths metals are essential components to products with significant growth potential in the markets associated with the electronics and technology industries, energy efficiency and greenhouse gas reduction.</p>]]></description>
			<pubDate>Tue, 29 Jun 2010 11:43:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/18240/arafura-resources-awards-contracts-to-progress-nolans-rare-earths-project-18240.html</guid>
		</item>
		<item>
			<title>Arafura Resources ticks another box to develop Nolans rare earths project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/17657/arafura-resources-ticks-another-box-to-develop-nolans-rare-earths-project-17657.html</link>
			<description><![CDATA[<p>Arafura Resources (ASX: ARU) has moved another step closer to  developing the Nolans rare earths project, contracting Lycopodium  Limited (ASX: LYL), for the design and engineering studies for the  Nolans mine and beneficiation plant in the Northern Territory.<br /><br />The  work is expected to be completed by the end of 2010.<br /><br />Steve Ward,  Arafura&rsquo;s managing director and CEO, said &ldquo;our successful capital  raising earlier this year has enabled us to drive forward with our work  programs to complete the Nolans Project."<br /><br />"The Lycopodium  contract is a key component of the work relating to the Nolans mine and  beneficiation plant."<br /><br />"This follows and builds on the mine  optimisation and EIS-related work streams announced in March, and is  further demonstration of our determination to bring Nolans into  production in 2013,&rdquo; he added.<br /><br />Rare earths metals are essential  components to products with significant growth potential in the markets  associated with the electronics and technology industries, energy  efficiency and greenhouse gas reduction.</p>]]></description>
			<pubDate>Tue, 15 Jun 2010 09:21:00 +0100</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/17657/arafura-resources-ticks-another-box-to-develop-nolans-rare-earths-project-17657.html</guid>
		</item>
		<item>
			<title>Arafura Resources raises A$19.5m for Nolans Rare Earth Project</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/14913/arafura-resources-raises-a195m-for-nolans-rare-earth-project-14913.html</link>
			<description><![CDATA[<p>Australian rare earths company Arafura Resources (ASX: ARU) has  announced its recent Placement and Renounceable Rights Issue had raised a  total of A$19.5 million (before costs) in additional funds to be used  to step-up development activities for its Nolans Rare  Earth-Phosphate-Uranium Project in the Northern Territory.<br /><br />The 1  for 10 Renounceable Rights Issue offered to Arafura shareholders closed  on 23 March 2010 and raised A$2.0 million. In February, the Company  announced it had completed a A$17.5 million Placement.<br /><br />Arafura  Managing Director &amp; CEO, Dr Steve Ward said the company had  structured its capital raising program to allow eligible Arafura  shareholders to participate on the same terms and conditions offered to  institutional shareholders and sophisticated investors in the Placement.<br /><br />&ldquo;We  considered it was important to recognise the loyalty shown by our  long-term shareholders and, yet again, a number demonstrated their  support and commitment to the Company," said Ward.<br /><br />"Allotment of  New Shares and holding statements for the Rights Issue and Shortfall  Offer will be dispatched to shareholders on Monday 29 March 2010,&rdquo; he  added.<br /><br />Details on the Rights Issue and Shortfall Offer: New  Shares offered under the Rights Issue 28,743,979; New Shares issued to  Eligible Shareholders 2,675,873; Shortfall Shares from the Rights Issue  26,068,106; Additional Shares issued under the Shortfall Offer 522,284;  Residual Shortfall Shares 25,545,822.</p>]]></description>
			<pubDate>Fri, 26 Mar 2010 10:29:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/14913/arafura-resources-raises-a195m-for-nolans-rare-earth-project-14913.html</guid>
		</item>
		<item>
			<title>Arafura Resources rare earths project targets 2013 start</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/14688/arafura-resources-rare-earths-project-targets-2013-start-14688.html</link>
			<description><![CDATA[<p>Ross Louthean, <a href="http://www.mineweb.com">www.mineweb.com</a></p>
<p>To advance site feasibility and project optimisation studies Arafura Resources Ltd (ASX: ARU) has appointed technical project consultants, following a successful capital raising programme.</p>
<p>A mix of capital raisings and rights issues to shareholders, when completed, could raise a total of A$35.3 million (US$32.5 million).</p>
<p>Chief executive Steve Ward said the company expects to have a mine site optimisation study completed late in 2010.</p>
<p>Apart from the standard requirements for pit design, cut-off grade strategies and capital demands, this study would also take in blending criteria for various ore and mineral types, the processing path calibrations and product mix and specification.</p>
<p>The deposit is at Nolans Bore, 135 kilometres north of Alice Springs.</p>
<p>Arafura has a resource from the measured to inferred categories of 30.3 million tonnes that contains 850,000 tonnes of rare earths (REO) at a grade of 2.8% REO, 3.9 Mt of phosphate pentoxide grading 12.9% P205, and 13.3 M lbs of uranium grading 0.44 lb/t U308.</p>
<p>The company said the development blueprint takes in a rare earths processing plant. Test work has provided "significant progress" in the definition of the flow sheet required for engineering a plant that would recover rare earths, phosphate and uranium and a by-product of calcium chloride.</p>]]></description>
			<pubDate>Mon, 22 Mar 2010 11:25:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/14688/arafura-resources-rare-earths-project-targets-2013-start-14688.html</guid>
		</item>
		<item>
			<title>Arafura Resources steps up development of Nolans Project, on track for 2013 start-up</title>
			<link>http://www.proactiveinvestors.co.uk/companies/news/14561/arafura-resources-steps-up-development-of-nolans-project-on-track-for-2013-start-up-14561.html</link>
			<description><![CDATA[<p>Australian rare earths company Arafura Resources (ASX: ARU) continues  the development of its Nolans Rare Earths-Phosphate-Uranium Project in  the Northern Territory of Australia, confirming it has commenced, or  soon will commence, a range of key tasks required to meet target  production in 2013.<br /><br />Arafura has entered into contractual  arrangements with Melbourne-based Whittle Consulting to perform a  detailed optimisation study of the Nolans Project. <br /><br />The study  involves a full economic, financial and engineering review of the mining  of the Nolans deposit over the life of the project, and will result in a  detailed operational and financial plan for all development scenarios.<br /><br />Arafura&rsquo;s  Managing Director and CEO, Steve Ward, said, &ldquo;our recent capital  raising efforts have been successful in attracting funds, due to  heightened awareness across the globe as to the strategic and commercial  importance of rare earths to our way of life and the growing  recognition of the significance of the Nolans Project as a future source  of rare earths to users worldwide."<br /><br />"These new funds are  allowing us to step up our Nolans Project activities. Shareholders can  now expect to see Arafura increasing the pace of delivery of all aspects  of the Nolans Project as we move towards production in 2013,&rdquo; he added.<br /><br />The  outputs of the study will include the following: ore reserves  statement; pit design; phasing and cut-off grade strategies; optimum  mining method and mining schedule; stockpiling strategy of ore and  intermediate products; blending criteria into plant or alternative plant  entry points; processing path calibration; product mix and  specification; logistics alternatives and capital sizing of all parts of  the operation. <br /><br />The Company anticipates completion of mine site  optimisation during the latter part of 2010.<br /><br />Arafura will acquire  additional detailed data to complete the environmental impact  assessment (EIS) of the Nolans site necessary for regulatory approval of  the mine. A contract for on-site programs relating to groundwater  (hydrological) investigations at Nolans has now been awarded to H2O  Drilling.<br /><br />The company anticipates this work to commence in early  April, and will involve:<br /><br />- Drilling and subsequent testing of the  groundwater environment at Nolans and the construction of bores for  ongoing sampling and monitoring;<br /><br />- Drilling of a pastoral bore to  replace Nolans Bore, which will be lost when mining commences; and<br /><br />Drilling  of production bores east of the Stuart Highway to provide water  (process and potable) for mine site operations.<br /><br />These groundwater  studies are an important aspect of the EIS. It is expected that  interpretation and modelling of the groundwater data will be ongoing  until completion of the mine site EIS, targeted for the end of 2010.<br /><br />In  recent weeks Arafura has advised of capital raising initiatives  (ASX:ARU 23/02/10) where it successfully placed 28.2 million shares at  A$0.62 per share with accredited institutional investors and  sophisticated investors, and initiated a 1 for 10 pro-rata renounceable  Rights Issue to eligible Shareholders, also at A$0.62 per share. <br /><br />The  Rights Issue is in progress, and the closing date for receipt of  acceptances is 23 March 2010. Taken together, the Placement and Rights  Issue have the potential to raise up to A$35.3 million before issue  costs.</p>]]></description>
			<pubDate>Thu, 18 Mar 2010 09:17:00 +0000</pubDate>
			<guid>http://www.proactiveinvestors.co.uk/companies/news/14561/arafura-resources-steps-up-development-of-nolans-project-on-track-for-2013-start-up-14561.html</guid>
		</item>
	</channel>
</rss>

